Professional Documents
Culture Documents
L541 Heat Load R1 03.06.17
L541 Heat Load R1 03.06.17
PROJECT NO - L541
REVISION - R0
COOLING LOAD SUMMARY SHEET
CALCULATED SELECTED
LIGHTING
NO OF AREA TOTAL AREA FRESH AIR TON/ TOTAL DEHUMIDIFIED
S.NO. FLOOR APPLICATION/ROOMS OCCUPANCY LOAD DENSITY CFM TR/unit AHU/FCU NUMBER EQUIPMENT NAME CFM DIFF.
ROOM/FLOOR (sq.ft) (sq.ft) (CFM) SPACE TONNAFE AIR (CFM)
(W/sq.ft)
608677195.xlsxSUMMARY
CENTRE POINT HOTEL SUMMER SUMMARY 16.00 HRS JOB L541
608677195.xlsxGF-HALL
CENTRE POINT HOTEL SUMMER SUMMARY 16.00 HRS JOB L541
PREFUNCTION in hotel
application
Author:
PREFUNCTION in hotel
application
CENTRE POINT HOTEL SUMMER SUMMARY 16.00 HRS
DATE 6-Sep
WB RH GR ENTH
DEG F % BTU
82 47 137.3 45.70
61.5 55 65 27.4
20.5 72.3
SQFT HT = 13 FT
Shyam:
DATE 6-Sep
WB RH GR ENTH
DEG F % BTU
82 47 137.3 45.70
61.5 55 65 27.4
20.5 72.3
SQFT HT = 13 FT Shyam:
1267.5
0
CFM 50.7
CFM 375 Shyam:
97.5
0
CFM 3.9
CFM 15
PEOPLE
412.5
0
CFM 19.8
CFM 50
PEOPLE
300
0
CFM 14.4
CFM 15
PEOPLE
455
0
CFM 27.3
CFM 100
PEOPLE