Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Messages

on HOUNCADB7 at 7/28/2020 10:27:38 AM

This report displays messages for the executions or validations.

View Overview

Execution Information

Operation ID 287838 (Execution)

Name SSISProject\EncompassProjectsSync\EncompassProjectsSync.dtsx

Environment -

Status Failed

Error Messages

Message Type Action Message Time

OnError View Context 7/28/2020 9:34:26 AM

All Messages

Filter: Message Type: All; (4 more)

Message Type Message Time

OnPostExecute 7/28/2020 9:34:26 AM

OnWarning 7/28/2020 9:34:26 AM

1 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
Duration (sec) 660.66

Start Time 7/28/2020 9:23:25 AM

End Time 7/28/2020 9:34:26 AM

Caller OIIAD\ADixit-PRV

Message Message Source Name Subcomponent Name

DTS, OPG and Marine Projects:Error: Executing the query DTS, OPG and Marine Projects
"EXEC dbo.usp_INS_DTS_OPG_MarineProjects" failed
with the following error: "Violation of PRIMARY KEY
constraint 'PK_SYSTEM_CONTACT'. Cannot insert
duplicate key in object 'dbo.system_contact'. The duplicate
key value is (PROJ_0000204199).
Violation of PRIMARY KEY constraint
'PK_SYSTEM_CONTACT'. Cannot insert duplicate key in
object 'dbo.system_contact'. The duplicate key value is
(PROJ_0000204196).
Violation of PRIMARY KEY constraint
'PK_SYSTEM_CONTACT'. Cannot insert duplicate key in
object 'dbo.system_contact'. The duplicate key value is
(PROJ_0000204287).
The statement has been terminated.
The statement has been terminated.
The statement has been terminated.". Possible failure
reasons: Problems with the query, "ResultSet" property not
set correctly, parameters not set correctly, or connection
not established correctly.

Message Message Source Name Subcomponent Name

EncompassProjectsSync:Finished, 9:34:26 AM, Elapsed EncompassProjectsSync


time: 00:10:57.969.

EncompassProjectsSync:Warning: SSIS Warning Code EncompassProjectsSync


DTS_W_MAXIMUMERRORCOUNTREACHED. The
Execution method succeeded, but the number of errors
raised (1) reached the maximum allowed (1); resulting in
failure. This occurs when the number of errors reaches the
number specified in MaximumErrorCount. Change the
MaximumErrorCount or fix the errors.

2 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
Execution Path

\EncompassProjectsSync\DTS,
OPG and Marine Projects

Execution Path

\EncompassProjectsSync

\EncompassProjectsSync

3 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
OnPostExecute 7/28/2020 9:34:26 AM

OnTaskFailed 7/28/2020 9:34:26 AM

OnError 7/28/2020 9:34:26 AM

OnPostValidate 7/28/2020 9:34:17 AM

OnPreValidate 7/28/2020 9:34:17 AM

OnPreExecute 7/28/2020 9:34:17 AM

OnPostExecute 7/28/2020 9:34:17 AM

OnPostValidate 7/28/2020 9:30:40 AM

OnPreValidate 7/28/2020 9:30:40 AM

OnPreExecute 7/28/2020 9:30:40 AM

OnPostExecute 7/28/2020 9:30:40 AM

OnInformation 7/28/2020 9:30:40 AM

OnInformation 7/28/2020 9:30:40 AM

OnInformation 7/28/2020 9:30:40 AM

OnInformation 7/28/2020 9:30:40 AM

OnInformation 7/28/2020 9:30:02 AM

OnInformation 7/28/2020 9:29:48 AM

4 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
DTS, OPG and Marine Projects:Finished, 9:34:26 AM, DTS, OPG and Marine Projects
Elapsed time: 00:00:09.000.

DTS, OPG and Marine Projects:The task, 'DTS, OPG and DTS, OPG and Marine Projects
Marine Projects', failed.

DTS, OPG and Marine Projects:Error: Executing the query DTS, OPG and Marine Projects
"EXEC dbo.usp_INS_DTS_OPG_MarineProjects" failed
with the following error: "Violation of PRIMARY KEY
constraint 'PK_SYSTEM_CONTACT'. Cannot insert
duplicate key in object 'dbo.system_contact'. The duplicate
key value is (PROJ_0000204199).
Violation of PRIMARY KEY constraint
'PK_SYSTEM_CONTACT'. Cannot insert duplicate key in
object 'dbo.system_contact'. The duplicate key value is
(PROJ_0000204196).
Violation of PRIMARY KEY constraint
'PK_SYSTEM_CONTACT'. Cannot insert duplicate key in
object 'dbo.system_contact'. The duplicate key value is
(PROJ_0000204287).
The statement has been terminated.
The statement has been terminated.
The statement has been terminated.". Possible failure
reasons: Problems with the query, "ResultSet" property not
set correctly, parameters not set correctly, or connection
not established correctly.

DTS, OPG and Marine Projects:Validation is complete. DTS, OPG and Marine Projects

DTS, OPG and Marine Projects:Validation has started. DTS, OPG and Marine Projects

DTS, OPG and Marine Projects:Start, 9:34:17 AM. DTS, OPG and Marine Projects

Projects, Activities, Customers:Finished, 9:34:17 AM, Projects, Activities, Customers


Elapsed time: 00:03:36.359.

Projects, Activities, Customers:Validation is complete. Projects, Activities, Customers

Projects, Activities, Customers:Validation has started. Projects, Activities, Customers

Projects, Activities, Customers:Start, 9:30:40 AM. Projects, Activities, Customers

Activites to Encompass:Finished, 9:30:40 AM, Elapsed Activites to Encompass


time: 00:00:52.266.

Activites to Encompass:Information: Cleanup phase is Activites to Encompass SSIS.Pipeline


beginning.

Activites to Encompass:Information: Activites to Encompass SSIS.Pipeline


"tmp_master_customers" wrote 10603 rows.

Activites to Encompass:Information: Activites to Encompass SSIS.Pipeline


"tmp_master_activies" wrote 114 rows.

Activites to Encompass:Information: Post Execute phase Activites to Encompass SSIS.Pipeline


is beginning.

Activites to Encompass:Information: Execute phase is Activites to Encompass SSIS.Pipeline


beginning.

Activites to Encompass:Information: Pre-Execute phase is Activites to Encompass SSIS.Pipeline


beginning.

5 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

6 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
OnInformation 7/28/2020 9:29:48 AM

OnPostValidate 7/28/2020 9:29:48 AM

OnWarning 7/28/2020 9:29:48 AM

OnWarning 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:29:48 AM

OnPreValidate 7/28/2020 9:29:48 AM

OnPreExecute 7/28/2020 9:29:48 AM

OnPostExecute 7/28/2020 9:29:48 AM

OnPostValidate 7/28/2020 9:29:48 AM

OnPreValidate 7/28/2020 9:29:48 AM

OnPreExecute 7/28/2020 9:29:48 AM

OnPostExecute 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:29:48 AM

OnInformation 7/28/2020 9:23:30 AM

OnInformation 7/28/2020 9:23:28 AM

OnInformation 7/28/2020 9:23:28 AM

7 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
Activites to Encompass:Information: Prepare for Execute Activites to Encompass SSIS.Pipeline
phase is beginning.

Activites to Encompass:Validation is complete. Activites to Encompass

Activites to Encompass:Warning: Truncation may occur Activites to Encompass PS_Project_Activities [62]


due to retrieving data from database column "DESCR"
with a length of 960 to data flow column "DESCR" with a
length of 30.

Activites to Encompass:Warning: Truncation may occur Activites to Encompass PS_Project_Activities [62]


due to retrieving data from database column
"ACTIVITY_ID" with a length of 480 to data flow column
"ACTIVITY_ID" with a length of 15.

Activites to Encompass:Information: Validation phase is Activites to Encompass SSIS.Pipeline


beginning.

Activites to Encompass:Validation has started. Activites to Encompass

Activites to Encompass:Start, 9:29:48 AM. Activites to Encompass

Master Service Line to Encompass:Finished, 9:29:48 AM, Master Service Line to Encompass
Elapsed time: 00:00:00.109.

Master Service Line to Encompass:Validation is complete. Master Service Line to Encompass

Master Service Line to Encompass:Validation has started. Master Service Line to Encompass

Master Service Line to Encompass:Start, 9:29:48 AM. Master Service Line to Encompass

Projects to Encompass:Finished, 9:29:48 AM, Elapsed Projects to Encompass


time: 00:06:19.953.

Projects to Encompass:Information: Cleanup phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Information: "tmp_Tree_Node" Projects to Encompass SSIS.Pipeline


wrote 373 rows.

Projects to Encompass:Information: "tmp_master_project" Projects to Encompass SSIS.Pipeline


wrote 169909 rows.

Projects to Encompass:Information: Post Execute phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Information: Execute phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Information: Pre-Execute phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Information: Prepare for Execute Projects to Encompass SSIS.Pipeline


phase is beginning.

8 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

9 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
OnWarning 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnInformation 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPreExecute 7/28/2020 9:23:28 AM

OnPostExecute 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPreExecute 7/28/2020 9:23:28 AM

OnPreExecute 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnInformation 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

OnPostValidate 7/28/2020 9:23:28 AM

OnPreValidate 7/28/2020 9:23:28 AM

10 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
Projects to Encompass:Warning: The output column Projects to Encompass SSIS.Pipeline
"LOCATIONDESCRIP" (25) on output "OLE DB Source
Output" (13) and component "PS_Project" (2) is not
subsequently used in the Data Flow task. Removing this
unused output column can increase Data Flow task
performance.

Projects to Encompass:Validation is complete. Projects to Encompass

Projects to Encompass:Information: Validation phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Validation has started. Projects to Encompass

Projects to Encompass:Start, 9:23:28 AM. Projects to Encompass

Truncate Tmp FS Master Tables:Finished, 9:23:28 AM, Truncate Tmp FS Master Tables
Elapsed time: 00:00:00.063.

Truncate Tmp FS Master Tables:Validation is complete. Truncate Tmp FS Master Tables

Truncate Tmp FS Master Tables:Validation has started. Truncate Tmp FS Master Tables

Truncate Tmp FS Master Tables:Start, 9:23:28 AM. Truncate Tmp FS Master Tables

EncompassProjectsSync:Start, 9:23:28 AM. EncompassProjectsSync

EncompassProjectsSync:Validation is complete. EncompassProjectsSync

Update Encompass Region for Finalized Update Encompass Region for


Requests:Validation is complete. Finalized Requests

Update Encompass Region for Finalized Update Encompass Region for


Requests:Validation has started. Finalized Requests

Truncate Tmp FS Master Tables:Validation is complete. Truncate Tmp FS Master Tables

Truncate Tmp FS Master Tables:Validation has started. Truncate Tmp FS Master Tables

Projects, Activities, Customers:Validation is complete. Projects, Activities, Customers

Projects, Activities, Customers:Validation has started. Projects, Activities, Customers

Projects to Encompass:Validation is complete. Projects to Encompass

Projects to Encompass:Information: Validation phase is Projects to Encompass SSIS.Pipeline


beginning.

Projects to Encompass:Validation has started. Projects to Encompass

Master Service Line to Encompass:Validation is complete. Master Service Line to Encompass

Master Service Line to Encompass:Validation has started. Master Service Line to Encompass

DTS, OPG and Marine Projects:Validation is complete. DTS, OPG and Marine Projects

DTS, OPG and Marine Projects:Validation has started. DTS, OPG and Marine Projects

11 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync

\EncompassProjectsSync

\EncompassProjectsSync\Update
Encompass Region for Finalized
Requests

\EncompassProjectsSync\Update
Encompass Region for Finalized
Requests

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync
\Truncate Tmp FS Master Tables

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync
\Projects, Activities, Customers

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Projects
to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\Master
Service Line to Encompass

\EncompassProjectsSync\DTS,
OPG and Marine Projects

\EncompassProjectsSync\DTS,
OPG and Marine Projects

12 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
OnPostValidate 7/28/2020 9:23:28 AM

OnWarning 7/28/2020 9:23:27 AM

OnWarning 7/28/2020 9:23:27 AM

OnInformation 7/28/2020 9:23:27 AM

OnPreValidate 7/28/2020 9:23:27 AM

OnPreValidate 7/28/2020 9:23:27 AM

13 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
Activites to Encompass:Validation is complete. Activites to Encompass

Activites to Encompass:Warning: Truncation may occur Activites to Encompass PS_Project_Activities [62]


due to retrieving data from database column "DESCR"
with a length of 960 to data flow column "DESCR" with a
length of 30.

Activites to Encompass:Warning: Truncation may occur Activites to Encompass PS_Project_Activities [62]


due to retrieving data from database column
"ACTIVITY_ID" with a length of 480 to data flow column
"ACTIVITY_ID" with a length of 15.

Activites to Encompass:Information: Validation phase is Activites to Encompass SSIS.Pipeline


beginning.

Activites to Encompass:Validation has started. Activites to Encompass

EncompassProjectsSync:Validation has started. EncompassProjectsSync

14 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.
\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync\Activites
to Encompass

\EncompassProjectsSync

15 / 15 Use scroll wheel or PAGE UP & PAGE DOWN to move through pages.

You might also like