Professional Documents
Culture Documents
Daily JSA - Back Filling, Levelling and Comapaction
Daily JSA - Back Filling, Levelling and Comapaction
11
Rev. No. 02
Work Description
Backfilling, Grading, Leveling compaction and water sprinkling Date: New Revised
Loading and unloading material Revised Date:
Work order no:
Area: Opposite to CRU Building
BU: Cast House Job Location: Opposite to CRU Building
Risk Level Risk Level after
No Basic Steps Potential Hazards Control Measures Control Measures SPA
2. Sand Spreading by wheel Heavy Competent flag man should be Site Supervisor
loader/grader, Levelling by grader Equipment available at the site.
and compaction by roller Movement/Colli Traffic movement plan should be
compactor sion
followed
Equipment
Equipment must be checked by the
Ma’aden Aluminium –Environment, Health, Safety & Security (EHSS) MSHEM-2.11
Rev. No. 02
Rev. No. 02