Professional Documents
Culture Documents
BeOn Online Sampling 2013
BeOn Online Sampling 2013
03 Material tests (see Excel file for possible examples) 16 Proof of process capability (Cpk*)
02 Function tests (see Excel file for possible examples) 17 Measurement and test equipment list*
04 Haptics tests (if applies in the drawing and their norms) 18 Measurement and test equipment certificates*
10 Reliability tests (if applies in the drawing, such as 22 Certificates* (ISO/TS 16949:2009)
flammability or TL /PV tests) 22 CCC* – Certificates, according to Gov
requierements
23 -Process self Audit (VDA 6.3*)
Process related Documents*: 24 Coversheets for non-dictated bought components
(VDA 2.4*)
25 Part History (form available at B2B portal) 26 Q-Documentation pre-series (PVS/0S only)
2 7
8
9
3 10
11 12
4
5
13
The date of the D/TLD
selfaudit will be only 1.- Auxiliary Tool
mandatory, if Dmba is active. 2.- Limited production tool
3.- Standar Tool
In Checking