BeOn: Bemusterung On_Line

Ing. Augusto Guerrero, February 28th. ‘2013


Review: A. Guerrero Thema: Bemusterung Date: September 2012 2
First Samples Documentation Requirements
Note 3 Note 1
Latest KVS’s drawings date* on Part Data released Same as Note-3 process related docs, plus:
with “Status V”.
Confirm Versatile ASSY on Part Data (if applies)
IMDS (Status 4: accepted*) 13 Process – FMEA (coversheet*)
Product related Documents*: 14 Process flow chart*

01 Dimensional check (see Excel as fullfillment example) 15 Control plan*

03 Material tests (see Excel file for possible examples) 16 Proof of process capability (Cpk*)

02 Function tests (see Excel file for possible examples) 17 Measurement and test equipment list*

04 Haptics tests (if applies in the drawing and their norms) 18 Measurement and test equipment certificates*

05… 21 Packaging /Transport unit datasheet (LISON*)

10 Reliability tests (if applies in the drawing, such as 22 Certificates* (ISO/TS 16949:2009)
flammability or TL /PV tests) 22 CCC* – Certificates, according to Gov
requierements
23 -Process self Audit (VDA 6.3*)
Process related Documents*: 24 Coversheets for non-dictated bought components
(VDA 2.4*)
25 Part History (form available at B2B portal) 26 Q-Documentation pre-series (PVS/0S only)

26 Q-Documentation pre-series (form available at B2B) 34 Product Audit (VDA 6.5*)


98 - Fit trial (for assemble “Tier1” parts) 98 - Fit trial (for assemble “Tier1” parts) Note-1 level*.

Review: A. Guerrero Thema: Bemusterung Date: September 2012 3


BeOn (Part Data)

2 7
8
9
3 10

11 12
4

5
13
The date of the D/TLD
selfaudit will be only 1.- Auxiliary Tool
mandatory, if Dmba is active. 2.- Limited production tool
3.- Standar Tool

Review: A. Guerrero Thema: Bemusterung Date: September 2012 4


BeOn (Self assessment)

Review: A. Guerrero Thema: Bemusterung Date: September 2012 5


Create an ISIR - Test Results

Select a type of test result e.g.


dimensional check from the list,
and then click on the new test result
button.

Review: A. Guerrero Thema: Bemusterung Date: September 2012 6


Create an ISIR - Test Results

The entry from the list has been


accepted. You can repeat the
process, as often as you want, to
create test results.
For one type of test result, you can
also
create several test results.

Click on this icon to edit one


of the test results., the Test
results detailed view will be
shown to you.

Review: A. Guerrero Thema: Bemusterung Date: September 2012 7


Die the page is
devided in three
sections:
Create an ISIR - Test Results 1. Type of attachment
2. Requirements
3. documents
1

2 If you selected a dimensional


check, enter your measurement
results with reference number,
requirements, actual values and
your assessment.
Afterwards click Button NEW

To enter results quickly, you


could use the import fuction. In
the function folder FORMS, you
will find an Excel template for
data import.
Click on the link data import
templates

3 You can attach process related


documents to the test result. If
possible, please attach in in .pdf
or .jpg formate and with a max.
size of 10 MB per document. To
do this, please click the button
Review: A. Guerrero Thema: Bemusterung NEW. Date: September 2012 8
Create an ISIR - Documents

Select a document from the list that


you want to attach to the initial
sample report. In our example, we
will select the document 25 part
history.

Review: A. Guerrero Thema: Bemusterung Date: September 2012 9


Release an ISIR - Overview

In Checking

The ISIR was forwarded successfully to the


customer and will be checked. The status has
changed from Release to Checking.
From this status onwards, you cannot
change the data anymore. Changes need to
be sent per email to the responsible engineer.
The responsible engineer will edit / implement
the data into the ISIR

You are finishing the creation and


checking of the ISIR by sending
the report to the customer.

Review: A. Guerrero Thema: Bemusterung Date: September 2012 10