ITEM RATE LIST FOR CIVIL WORK

Sub-contractor :

Sl No Activity description UOM Unit Item Rate excl.


VAT (in NPR)
Excavation in all types of soil including disposal of excess earth etc. for all leads and
1 lifts. Rate is including all manpower, plant & machineries, consumables, Cum 288.00
transportation etc to complete the work in all respect.
Backfilling including layer by layer compaction as per specification including
2 Cum 96.00
restoration of footpath/ curb stone arround the excavated area.
Providing, laying/ placing and finishing including shuttering and curing of Plain
Cement Concrete (PCC) (1:4:8) (1 cement : 4 sand : 8 Stone aggregate). Rate is
3 including all manpower, materials (except Cement), consumables, plant & Cum 5680.00
machineries, transportation etc to complete the work in all respect. Cement will be
issued by L&T.
Providing, laying/ placing and finishing including shuttering and curing of Plain
Cement Concrete (PCC) (1:2:4) (1 cement : 2 sand : 4 Stone aggregate). Rate is
4 including all manpower, materials (except Cement), consumables, plant & Cum 5440.00
machineries, transportation etc to complete the work in all respect. Cement will be
issued by L&T.
Providing, laying/ placing and finishing including steel shuttering and curing of
Reinforced Cement Concrete Design Mix (M25) including pre cast, Grouting of
pockets & underpinning but excluding reinforcement steel. Rate is including all
5 manpower, materials (except Cement), consumables, plant & machineries, Cum 8960.00
transportation etc to complete the work in all respect. Sub-contractor have to ensure
availability of required numbers of Cube molds for taking Cube samples for testing.
Cement will be issued by L&T.

Providing, laying/ placing and finishing including shuttering and curing of Plain
Cement Concrete 1:5:10 (1 cement : 5 sand : 10 Stone aggregate). Rate is including all
6 Cum 5760.00
manpower, materials (except Cement), consumables, plant & machineries,
transportation etc to complete the work in all respect. Cement will be issued by L&T.

Cutting, Bending, Binding, Placing of Steel Reinforcement Steel. Rate is including all
manpower, materials (except reinforcement steel), plant & machineries,
7 MT 15000.00
consumables, transportation etc to complete the work in all respect. Reinforcement
steel will be issued by L&T.

Local Sand filling and compaction around and under Foundation for backfilling of
8 cable and pit as applicable. Rate is including all manpower, materials, plant & Cum 3200.00
machineries, consumables, transportation etc to complete the work in all respect.
Stone soling below foundations wherever specified in approved drawings. Rate is
9 including all manpower, materials, plant & machineries, consumables, transportation Cum 2880.00
etc to complete the work in all respect.

Accepted by Sub-contractor
Sub-contractor name:

Signature:

Date: