EDG With New ACB Phase

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Amps X 1000 Bus1 (Nom. kV=0.4, Plot Ref. kV=0.

4)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

Cable1
500 500
Ampacity
1446 Amps
300 300

EDG
No Load
Constant Excitation
100
AC Fault Current 100 850 kW
EDG New ACB EDG
50
Square-D MICROLOGIC 6.0 50
Sensor = 2500
LT Pickup = 0.4 (1000 Amps)
30 30
LT Band = 0.5
ST Pickup = 1.5 (1500 Amps)
ST Band = 0.1 (I^x)t = OUT Bus1
Inst. Pickup = 6 (15000 Amps)
10 10

EDG
5 5
850 kW
Seconds

Seconds
(I2)^2 t = 30
3 3
Cable1 - P Cable1
9 - 1/C 240 mm²
Copper XLPE
Tc = 90C 9‐1/C 240
1 Plotted - 3 x 240 mm² 1

.5 EDG .5

No Load
.3 Constant Excitation .3
Total Fault Current
EDG New ACB

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 1000 Bus1 (Nom. kV=0.4, Plot Ref. kV=0.4) ETAP Star 19.5.02

Phase Fualt

Project: H CS New ATS Date: 26-08-2022


Location: H CS Rev: Base
Contract: Fault: Phase
Engineer: TQ

You might also like