This document summarizes an opportunity register from the District Engineering Office of Cotabato 3 regarding improvements to their wide area network management. It identifies two opportunities: 1) Requesting a dedicated data connection from the nearest telecommunications facility to connect to the DPWH WAN and ensure optimal bandwidth, and 2) Procuring a minimum 10KVA generator set to provide uninterrupted power supply to the network room. The action plan is to avail of a high speed internet gate facility subscription from PLDT and purchase the generator set. The ICT unit is responsible for implementing these plans.
This document summarizes an opportunity register from the District Engineering Office of Cotabato 3 regarding improvements to their wide area network management. It identifies two opportunities: 1) Requesting a dedicated data connection from the nearest telecommunications facility to connect to the DPWH WAN and ensure optimal bandwidth, and 2) Procuring a minimum 10KVA generator set to provide uninterrupted power supply to the network room. The action plan is to avail of a high speed internet gate facility subscription from PLDT and purchase the generator set. The ICT unit is responsible for implementing these plans.
This document summarizes an opportunity register from the District Engineering Office of Cotabato 3 regarding improvements to their wide area network management. It identifies two opportunities: 1) Requesting a dedicated data connection from the nearest telecommunications facility to connect to the DPWH WAN and ensure optimal bandwidth, and 2) Procuring a minimum 10KVA generator set to provide uninterrupted power supply to the network room. The action plan is to avail of a high speed internet gate facility subscription from PLDT and purchase the generator set. The ICT unit is responsible for implementing these plans.
Department of Public Works and Highways Issue Date:
Standard Procedures Manual Doc. Code: DPWH-SPM-ICTS-OR
RD COTABATO 3 DISTRICT ENGINEERING OFFICE Revision No.: 1 Opportunity Register Page No. 1 of 1
Office: Office of the District Engineer
ICT Unit
Process Opportunity Event L Benefit BR BF Action Plan Responsible
Wide Area Request for our own dedicated 1 • Optimum Data Bandwidth 2 2 • Availment of High Speed ICTS Network Data connection with the assured by the Internet Gate Facility Management and nearest available Telecommunication Subscription of PLDT Maintenance Telecommunication Facility to Company according to WAN connect to DPWH WAN • Will be independent of specifications for DPWH the other DEO WAN as in the case of equipment problems eg. router malfunction,etc and Telco connection problems Procurement of at least a 2 • Uninterrupted Power 2 4 • Purchase of Generator Set for ICTS minimum of 10 KVA generator Supply the Network Room set
Prepared by: Submitted by: Approved:
IRWIN ROUEL A. MAROHOM SUSAN G. ERAMIS EDDIE M. AMIR
Computer Operator I Administrative Officer V District Engineer Acting Chief, Administrative Section