Department of Public Works and Highways Issue Date:

Standard Procedures Manual Doc. Code: DPWH-SPM-ICTS-OR


RD
COTABATO 3 DISTRICT ENGINEERING OFFICE Revision No.: 1
Opportunity Register Page No. 1 of 1

Office: Office of the District Engineer

ICT Unit

Process Opportunity Event L Benefit BR BF Action Plan Responsible


Wide Area Request for our own dedicated 1 • Optimum Data Bandwidth 2 2 • Availment of High Speed ICTS
Network Data connection with the assured by the Internet Gate Facility
Management and nearest available Telecommunication Subscription of PLDT
Maintenance Telecommunication Facility to Company according to WAN
connect to DPWH WAN • Will be independent of specifications for DPWH
the other DEO WAN as in
the case of equipment
problems eg. router
malfunction,etc and Telco
connection problems
Procurement of at least a 2 • Uninterrupted Power 2 4 • Purchase of Generator Set for ICTS
minimum of 10 KVA generator Supply the Network Room
set

Prepared by: Submitted by: Approved:

IRWIN ROUEL A. MAROHOM SUSAN G. ERAMIS EDDIE M. AMIR


Computer Operator I Administrative Officer V District Engineer