Department of Public Works and Highways Issue Date:
Standard Procedures Manual Doc. Code: DPWH-SPM-ICTS-OR
RD COTABATO 3 DISTRICT ENGINEERING OFFICE Revision No.: 0 Opportunity Register Page No. 1 of 1
Office: Office of the District Engineer
ICT Unit
Process Opportunity Event L Benefit BR BF Action Plan Responsible
Wide Area Request for our own dedicated 3 • Optimum Data Bandwidth 2 6 • Availment of High Speed ICTS Network Data connection with the assured by the Internet Gate Facility Management and nearest available Telecommunication Subscription of PLDT Maintenance Telecommunication Facility to Company according to WAN connect to DPWH WAN • Will be independent of specifications for DPWH the other DEO WAN as in the case of equipment problems eg. router malfunction,etc and Telco connection problems Procurement of at least a 2 • Uninterrupted Power 2 4 • Purchase of Generator Set As ICTS minimum of 10 KVA generator Supply soon as possible for the set Network Room Uplink to Cotabato 2nd DEO via 3 • DPWH Intranet is 3 9 • Followup on the Request ICTS Fiber Optic Cable is required for our Office to operational; The request of utilize the task specific addition of our Subnet Route applications ( email, to DPWH WAN has been CWA, RBIA)needed for forwarded to IMS. each sections’ output
Prepared by: Submitted by: Approved:
NURHANI J. IBRAHIM SUSAN G. ERAMIS EDDIE M. AMIR
Regional IT Support Officer Administrative Officer V District Engineer Acting Chief, Administrative Section