C. EXECUTION
1 CONTRACTOR NAME :
2 CONTRACT VALUE :
3 CONTRACT NO. & DATE :
NAME : NAME :
POSITION: POSITION:
1 SUBMIT DATE :
5 PROJECT NAME :
7 LOCATION : BATAM-SITE B
8 MAIN PROJECT :
12 WORK SUMMARY : PEKERJAAN FABRIKASI DAN INSTALASI PIPA OSBL, PIPE SUPPORT, PENGECATAN
13 STATUS JOB :
14 WORKING DATE :
15 FINISH DATE :
16 REQUESTER NAME :
NAME : NAME :
POSITION: POSITION:
3 REMARK :
C. EXECUTION
1 CONTRACTOR NAME :
2 CONTRACT VALUE :
NAME : NAME :
POSITION: POSITION:
TENDER
KETENTUAN PROYEK
A. KETENTUAN UMUM
1. MATERIAL (PIPA, FITTINGS, ELBOW, FLANGE, VALVE, U-BOLT, UNP) OLEH OWNER
2. DIMENSI BEVEL DAN GAP PIPA YANG AKAN DILAS MENGIKUTI STANDAR ASME 31.3
3. PEKERJAAN FABRIKASI SUDAH TERMASUK PEKERJAAN TIE IN KE PIPA DAN TANGKI, BAIK TIE IN KE PIPA DAN
TANGKI BARU ATAUPUN TIE IN KE PIPA DAN TANGKI EXISTING
4. UPAH PEKERJAAN HEADER DIHITUNG PER SATUAN METER SEPERTI PERHITUNGAN PEKERJAAN PIPA
5. UPAH PEKERJAAN PEMASANGAN VALVE, FLANGE, STRAINER, STEAM TRAP & KOMPONEN-KOMPONEN LAIN
YANG MEMILIKI FLANGE SUDAH TERMASUK PEMASANGAN GASKET, BAUT&MUR
6. PERALATAN LAS DAN KAWAT LAS MEREK KOBE STEEL ATAU NIKKO STEEL DISEDIAKAN OLEH KONTRAKTOR
7. PENGECATAN PIPA STANDAR DOUBLE LAYER, PRIMER COAT KEMUDIAN TOP COAT
8. UNTUK PIPA YANG TIDAK MENGGUNAKAN PIPE SHOE, PEKERJAAN PIPA TERMASUK PEMASANGAN
U-BOLT SETIAP 12M.
9. PEMASANGAN POMPA SUDAH TERMASUK PEMASANGAN FRAME POMPA DENGAN WF 200 (DISESUAIKAN
DENGAN UKURAN POMPA / MATERIAL OLEH OWNER) DAN DYNA BOLT (DISEDIAKAN OLEH KONTRAKTOR).
10. MENJADI SCOPE KONTRAKTOR UNTUK MENYEDIAKAN MANPOWER DAN PERALATAN SEPERTI TEST PUMP DAN
LAIN LAIN UNTUK MEMBANTU PROSES HYDROTEST DAN PNEUMATIK TEST APABILA DIPERLUKAN
11. SETIAP PEKERJAAN YANG MEMERLUKAN SKAFOLDING, MAKA DISEDIAKAN OLEH KONTRAKTOR.
12. PLATE STRIP ISOLASI DIPASANG SETIAP 900 MM UNTUK UKURAN 900 MMW X 3000 MML & 900 MMW X 4000
MML, DAN SETIAP 1000 MM UNTUK PU BOARD 1000 MMW X 1000 MML
13. UNTUK PEKERJAAN ISOLASI, MATERIAL ROCKWOOL & ALUMINIUM DISEDIAKAN OWNER
UNTUK KAWAT BETON & PAKU RIVET DISEDIAKAN OLEH KONTRAKTOR
14. VOLUME PEKERJAAN ISOLASI EQUIPMENT SEPERTI VESSEL, TANGKI & PIPA UKURAN 8 INCH KE ATAS DIHITUNG
BERDASARKAN OUTSIDE DIAMETER DITAMBAH 2 KALI TEBAL ISOLASI EQUIPMENT & PIPA TERSEBUT
15. SAMPAH SISA PEKERJAAN ISOLASI HARUS DIPINDAHKAN OLEH KONTRAKTOR MENUJU KE TEMPAT YANG
DITUNJUK OWNER
16. MATERIAL CONCRETE WIRE PENGIKAT ISOLASI DAN COPPER TUBE DISEDIAKAN OLEH KONTRAKTOR
17. SEBELUM MELAKUKAN PEKERJAAN TIE-IN KE PIPA ATAUPUN TANGKI DI PLANT, PIHAK KONTRAKTOR
WAJIB MELAKUKAN KOORDINASI DAN MEMINTA PERSETUJUAN DARI PIHAK PLANT
18. SEBELUM MELAKUKAN PEKERJAAN PANAS PIHAK KONTRAKTOR WAJIB MENGAJUKAN " HOT WORK
PERMITT" TERLEBIH DAHULU
19. KONTRAKTOR WAJIB MEMENUHI ATURAN DAN PROSEDUR YANG BERLAKU DI LOKASI PROYEK/PLANT
B. KETENTUAN KHUSUS
1. LANSIR MATERIAL KE LOKASI PEKERJAAN BY KONTRAKTOR
NAMA PEKERJAAN : PEKERJAAN FABRIKASI DAN INSTALASI PIPA ISBL, PIPE SUPPORT,
PENGECATAN PADA PROYEK 1ST & 2ND GAS ENGINE 2X3,3MW (IBP-20-253)
PEMILIK : PT. INTIBENUA PERKASATAMA
LOKASI PEKERJAAN : DUMAI - LUBUK GAUNG
KONTRAKTOR :
REVISI :0
TANGGAL :
NO. PENAWARAN :
DURASI PEKERJAAN (OWNER) : 75 HARI
JUMLAH PEKERJA (OWNER) : 18 ORANG
(JUMLAH PEKERJA DAPAT DITAMBAHKAN SESUAI KEBUTUHAN & URGENSI PEKERJAAN)
DURASI PEKERJAAN (KONTRAKTOR) :
JUMLAH PEKERJA (KONTRAKTOR) :
(DURASI & JUMLAH PEKERJA DIISI BILA KONTRAKTOR TIDAK DAPAT MEMENUHI DURASI & JUMLAH PEKERJA DARI
OWNER)
NO. TEMPLATE BQ : TBQ22-0269-R0
IDR
PEKERJAAN PERSIAPAN
LISTRIK : BY OWNER
AIR : BY OWNER
: -
: -
: -
: -
: -
B. PAINTING : -
C. SUPPORT STRUCTURE : -
D. EQUIPMENT INSTALLATION : -
GRAND TOTAL -
PPN 10% -
TOTAL -
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS
25 10 PCS - STIK
40 10 PCS - STIK
50 13 PCS - STIK
80 10 PCS - STIK
600 2 PCS - STIK
ELBOW LONG RADIUS 90° SEAMLESS, ASTM A234 GR.WPB,ANSI B16.9,BUTTWELD
800 4 PCS - STIK
ENDS,SCH40
15 25 PCS - FULL ARGON (NG LINE)
25 25 PCS - FULL ARGON (NG LINE)
50 2 PCS - FULL ARGON (NG LINE)
65 4 PCS - FULL ARGON (NG LINE)
80 8 PCS - FULL ARGON (NG LINE)
15 21 PCS - STIK
25 40 PCS - STIK
40 8 PCS - STIK
ELBOW 90 DEG, ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS, LR,
50 12 PCS - STIK
SCH40, SEAMLESS
80 40 PCS - STIK
100 40 PCS - STIK
125 2 PCS - STIK
HALF COUPLING, ASTM A 182 GR.F304L ANSI B16.11 SOCKET WELD ENDS 15 2 PCS - FULL ARGON
HALF COUPLING, ASTM A 105, ANSI B16.11, SOCKETWELD END, 3000# 15 50 PCS - STIK
40 2 PCS - STIK
HALF NIPPLE ASTM A 312 GR. TP304L ONE END THREAD TO ANSI B1.20.1-NPT 25 6 PCS - FULL ARGON
HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT 25 2 PCS - STIK
HALF COUPLING, ASTM A105, ANSI B16.11, FEMALE THREADED END, GALVANIZED 15 2 PCS - STIK
25 2 PCS - STIK
40 5 PCS - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
50 2 PCS - STIK
65 4 PCS - FULL ARGON (NG LINE)
50 4 PCS - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 80 2 PCS - STIK
100 2 PCS - STIK
EQUAL TEE WELDED, ASTM A 403 GR.WP304L ANSI B16.9 BUTTWELD ENDS 40 4 PCS - FULL ARGON
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS
40/25 2 PCS - STIK
REDUCED TEE, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS
80/65 2 PCS - FULL ARGON (NG LINE)
TEE REDUCED, ASTM A403 GR. WP304, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 4 PCS - FULL ARGON
REDUCER CON., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - FULL ARGON
REDUCER ECC., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - FULL ARGON
65 4 PCS - FLANGED
80 8 PCS - FLANGED
BUTTERFLY VALVE, CS, FLANGED END ANSI 150
100 10 PCS - FLANGED
125 2 PCS - FLANGED
25 8 PCS - FLANGED
40 6 PCS - FLANGED
50 8 PCS - FLANGED
BALL VALVE, CS, FLANGED END ANSI 150
65 8 PCS - FLANGED
80 2 PCS - FLANGED
100 2 PCS - FLANGED
15 7 PCS - STIK
BALL VALVE, CS, BUTTWELD END
25 4 PCS - FULL ARGON (NG LINE)
25 4 PCS - FLANGED
BALL VALVE, SS304, FLANGED END ANSI 150
40 9 PCS - FLANGED
50 2 PCS - FLANGED
DISCO CHECK VALVE, CS, WAFER TYPE
80 1 PCS - FLANGED
25 2 PCS - FLANGED
GLOBE VALVE, CS, FLANGED END ANSI150
50 3 PCS - FLANGED
40 2 PCS - FLANGED
Y STRAINER, CS, FLANGED END ANSI 150 100 2 PCS - FLANGED
125 2 PCS - FLANGED
BLIND FLANGE, ASTM A 182 GR.F304L ANSI B16.5/RF, #150 40 2 PCS - JOINT BOLT
BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150 80 1 PCS - JOINT BOLT
BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150, GALVANIZED 25 3 PCS - JOINT BOLT
50 4 PCS - JOINT BOLT
25 6 PCS - STIK
50 11 PCS - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 150#
100 4 PCS - STIK
600 10 PCS - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 300# 80 1 PCS - STIK
40 5 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, PN16
50 2 PCS - STIK
25 9 PCS - STIK
32 2 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, PN25
40 22 PCS - STIK
80 2 PCS - STIK
65 4 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN10 80 4 PCS - STIK
100 8 PCS - STIK
40 2 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN16
65 2 PCS - STIK
FLANGE WELDING NECK, CARBON STEEL, PN10 100 2 PCS - FULL ARGON (NG LINE)
FLANGE WELDING NECK, CARBON STEEL, PN16 25 6 PCS - FULL ARGON (NG LINE)
32 2 PCS - STIK
PRESSURE SAFETY VALVE
40 2 PCS - FLANGED
SUB TOTAL
B. PAINTING
15 12 MTR -
25 105 MTR -
40 20 MTR -
PIPE PAINTING (GREEN) 50 114 MTR -
80 115 MTR -
100 115 MTR -
125 10 MTR -
15 75 MTR -
25 65 MTR -
PIPE PAINTING (YELLOW) 50 4 MTR -
65 8 MTR -
80 22 MTR -
15 30 MTR -
PIPE PAINTING (BLUE) 25 36 MTR -
50 47 MTR -
25 32 MTR -
PIPE PAINTING (BROWN)
40 60 MTR -
SUB TOTAL
C. SUPPORT STRUCTURE
SUB TOTAL
D. EQUIPMENT INSTALLATION
SUB TOTAL
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS
SUB TOTAL
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS
25 10 PCS - - STIK
40 10 PCS - - STIK
50 13 PCS - - STIK
80 10 PCS - - STIK
600 2 PCS - - STIK
ELBOW LONG RADIUS 90° SEAMLESS, ASTM A234 GR.WPB,ANSI B16.9,BUTTWELD
800 4 PCS - - STIK
ENDS,SCH40
15 25 PCS - - FULL ARGON (NG LINE)
25 25 PCS - - FULL ARGON (NG LINE)
50 2 PCS - - FULL ARGON (NG LINE)
65 4 PCS - - FULL ARGON (NG LINE)
80 8 PCS - - FULL ARGON (NG LINE)
15 21 PCS - - STIK
25 40 PCS - - STIK
40 8 PCS - - STIK
ELBOW 90 DEG, ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS, LR,
50 12 PCS - - STIK
SCH40, SEAMLESS
80 40 PCS - - STIK
100 40 PCS - - STIK
125 2 PCS - - STIK
HALF COUPLING, ASTM A 182 GR.F304L ANSI B16.11 SOCKET WELD ENDS 15 2 PCS - - FULL ARGON
HALF COUPLING, ASTM A 105, ANSI B16.11, SOCKETWELD END, 3000# 15 50 PCS - - STIK
40 2 PCS - - STIK
HALF NIPPLE ASTM A 312 GR. TP304L ONE END THREAD TO ANSI B1.20.1-NPT 25 6 PCS - - FULL ARGON
HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT 25 2 PCS - - STIK
HALF COUPLING, ASTM A105, ANSI B16.11, FEMALE THREADED END, GALVANIZED 15 2 PCS - - STIK
25 2 PCS - - STIK
40 5 PCS - - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
50 2 PCS - - STIK
65 4 PCS - - FULL ARGON (NG LINE)
50 4 PCS - - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 80 2 PCS - - STIK
100 2 PCS - - STIK
EQUAL TEE WELDED, ASTM A 403 GR.WP304L ANSI B16.9 BUTTWELD ENDS 40 4 PCS - - FULL ARGON
TEE REDUCED, ASTM A403 GR. WP304, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 4 PCS - - FULL ARGON
REDUCER CON., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - - FULL ARGON
REDUCER ECC., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - - FULL ARGON
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS
40/25 2 PCS - - STIK
REDUCER ECC., ASTM A234 GR. WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 100/80 2 PCS - - STIK
125/100 2 PCS - - STIK
65 4 PCS - - FLANGED
80 8 PCS - - FLANGED
BUTTERFLY VALVE, CS, FLANGED END ANSI 150
100 10 PCS - - FLANGED
125 2 PCS - - FLANGED
25 8 PCS - - FLANGED
40 6 PCS - - FLANGED
50 8 PCS - - FLANGED
BALL VALVE, CS, FLANGED END ANSI 150
65 8 PCS - - FLANGED
80 2 PCS - - FLANGED
100 2 PCS - - FLANGED
15 7 PCS - - STIK
BALL VALVE, CS, BUTTWELD END
25 4 PCS - - FULL ARGON (NG LINE)
25 4 PCS - - FLANGED
BALL VALVE, SS304, FLANGED END ANSI 150
40 9 PCS - - FLANGED
50 2 PCS - - FLANGED
DISCO CHECK VALVE, CS, WAFER TYPE
80 1 PCS - - FLANGED
25 2 PCS - - FLANGED
GLOBE VALVE, CS, FLANGED END ANSI150
50 3 PCS - - FLANGED
40 2 PCS - - FLANGED
Y STRAINER, CS, FLANGED END ANSI 150 100 2 PCS - - FLANGED
125 2 PCS - - FLANGED
BLIND FLANGE, ASTM A 182 GR.F304L ANSI B16.5/RF, #150 40 2 PCS - - JOINT BOLT
BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150 80 1 PCS - - JOINT BOLT
BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150, GALVANIZED 25 3 PCS - - JOINT BOLT
50 4 PCS - - JOINT BOLT
25 6 PCS - - STIK
50 11 PCS - - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 150#
100 4 PCS - - STIK
600 10 PCS - - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 300# 80 1 PCS - - STIK
40 5 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, PN16
50 2 PCS - - STIK
25 9 PCS - - STIK
32 2 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, PN25
40 22 PCS - - STIK
80 2 PCS - - STIK
25 28 PCS - - STIK
40 22 PCS - - STIK
50 20 PCS - - STIK
FLANGE SLIP ON, ASTM A105 GALVANIZED, ANSI B16.5/ RF, CLASS 150# 65 8 PCS - - STIK
80 16 PCS - - STIK
100 28 PCS - - STIK
125 8 PCS - - STIK
65 4 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN10 80 4 PCS - - STIK
100 8 PCS - - STIK
40 2 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN16
65 2 PCS - - STIK
FLANGE WELDING NECK, CARBON STEEL, PN10 100 2 PCS - - FULL ARGON (NG LINE)
FLANGE WELDING NECK, CARBON STEEL, PN16 25 6 PCS - - FULL ARGON (NG LINE)
32 2 PCS - - STIK
PRESSURE SAFETY VALVE
40 2 PCS - - FLANGED
SUB TOTAL -
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS
B. PAINTING
15 12 MTR - -
25 105 MTR - -
40 20 MTR - -
PIPE PAINTING (GREEN) 50 114 MTR - -
80 115 MTR - -
100 115 MTR - -
125 10 MTR - -
15 75 MTR - -
25 65 MTR - -
PIPE PAINTING (YELLOW) 50 4 MTR - -
65 8 MTR - -
80 22 MTR - -
15 30 MTR - -
PIPE PAINTING (BLUE) 25 36 MTR - -
50 47 MTR - -
25 32 MTR - -
PIPE PAINTING (BROWN)
40 60 MTR - -
SUB TOTAL -
C. SUPPORT STRUCTURE
SUB TOTAL -
D. EQUIPMENT INSTALLATION
SUB TOTAL -
SUB TOTAL -