A. PROJECT DATA
1 SUBMIT DATE :
2 REQUEST FORM NO : TBQ22-0269-R0 / IBP-20-253
3 CATEGORY : CIVIL / STEEL CONSTRUCTION / MECHANICAL / ELECTRICAL *
4 PROJECT STATUS : NEW PROJECT / EXPANSION PROJECT / MAINTENANCE / REPLACEMENT / IMPROVEMENT *
5 PROJECT NAME : 1ST & 2ND GAS ENGINE 2X3,3MW (IBP-20-253)
6 COMPANY : PT. INTIBENUA PERKASATAMA
7 LOCATION : DUMAI-LUBUK GAUNG
8 MAIN PROJECT :
9 SUB PROJECT LEVEL 0 :
10 SUB PROJECT LEVEL 1 :
11 SUB PROJECT LEVEL 2 :
12 WORK SUMMARY : PEKERJAAN FABRIKASI DAN INSTALASI PIPA ISBL, PIPE SUPPORT, PENGECATAN
: PADA PROYEK 1ST & 2ND GAS ENGINE 2X3,3MW (IBP-20-253)
13 STATUS JOB : NYS
14 WORKING DATE :
15 FINISH DATE :
16 REQUESTER NAME :

17 IMB NO IMB REQUIRED NEED IMB, EFFECTIVE DATE :

18 QUANTITY OF SHEETS : USER REQUEST FORM DRAWING BQ TEMPLATE

SITE INSTRUCTION QUOTATION PRICE COMPARISON

CHECKED BY: APPROVED BY:

NAME : NAME :
POSITION: POSITION:

Filled by Procurement Department


B. VERIFICATION
1 RECEIPT DATE : 4 RECEIVED BY :
2 VERIFY DATE : 5 VERIFIED BY :
3 REMARK :

C. EXECUTION
1 CONTRACTOR NAME :
2 CONTRACT VALUE :
3 CONTRACT NO. & DATE :

NEGOTIATED BY: APPROVED BY:

NAME : NAME :
POSITION: POSITION:

* Cross the unnecessary ones REV-07


PROJECT INFORMATION FORM
Filled by Project & Engineering Department
A. PROJECT DATA

1 SUBMIT DATE :

2 REQUEST FORM NO : TBQ22-0124-R0

3 CATEGORY : CIVIL / STEEL CONSTRUCTION / MECHANICAL / ELECTRICAL *

4 PROJECT STATUS : NEW PROJECT / EXPANSION PROJECT / MAINTENANCE / REPLACEMENT / IMPROVEMENT *

5 PROJECT NAME :

6 COMPANY : PT. MUSIM MAS

7 LOCATION : BATAM-SITE B

8 MAIN PROJECT :

9 SUB PROJECT LEVEL 0 :

10 SUB PROJECT LEVEL 1 :

11 SUB PROJECT LEVEL 2 :

12 WORK SUMMARY : PEKERJAAN FABRIKASI DAN INSTALASI PIPA OSBL, PIPE SUPPORT, PENGECATAN

PADA PROYEK MS97 (MM-20-2171)

13 STATUS JOB :

14 WORKING DATE :

15 FINISH DATE :

16 REQUESTER NAME :

17 QUANTITY OF SHEETS : USER REQUEST FORM DRAWING BQ TEMPLATE

SITE INSTRUCTION QUOTATION PRICE COMPARISON

CHECKED BY: APPROVED BY:

NAME : NAME :
POSITION: POSITION:

Filled by Project Procurement Department


B. VERIFICATION

1 RECEIPT DATE : 4 RECEIVED BY :

2 VERIFY DATE : 5 VERIFIED BY :

3 REMARK :

C. EXECUTION

1 CONTRACTOR NAME :

2 CONTRACT VALUE :

3 CONTRACT NO. & DATE :

NEGOTIATED BY: APPROVED BY:

NAME : NAME :
POSITION: POSITION:

* Cross the unnecessary ones REV-06


PT. INTIBENUA PERKASATAMA
LUBUK GAUNG - DUMAI

PEKERJAAN FABRIKASI DAN INSTALASI PIPA ISBL, PIPE SUPPORT,


PENGECATAN PADA PROYEK 1ST & 2ND GAS ENGINE 2X3,3MW (IBP-20-253)

TENDER
KETENTUAN PROYEK

A. KETENTUAN UMUM
1. MATERIAL (PIPA, FITTINGS, ELBOW, FLANGE, VALVE, U-BOLT, UNP) OLEH OWNER
2. DIMENSI BEVEL DAN GAP PIPA YANG AKAN DILAS MENGIKUTI STANDAR ASME 31.3
3. PEKERJAAN FABRIKASI SUDAH TERMASUK PEKERJAAN TIE IN KE PIPA DAN TANGKI, BAIK TIE IN KE PIPA DAN
TANGKI BARU ATAUPUN TIE IN KE PIPA DAN TANGKI EXISTING
4. UPAH PEKERJAAN HEADER DIHITUNG PER SATUAN METER SEPERTI PERHITUNGAN PEKERJAAN PIPA
5. UPAH PEKERJAAN PEMASANGAN VALVE, FLANGE, STRAINER, STEAM TRAP & KOMPONEN-KOMPONEN LAIN
YANG MEMILIKI FLANGE SUDAH TERMASUK PEMASANGAN GASKET, BAUT&MUR
6. PERALATAN LAS DAN KAWAT LAS MEREK KOBE STEEL ATAU NIKKO STEEL DISEDIAKAN OLEH KONTRAKTOR
7. PENGECATAN PIPA STANDAR DOUBLE LAYER, PRIMER COAT KEMUDIAN TOP COAT
8. UNTUK PIPA YANG TIDAK MENGGUNAKAN PIPE SHOE, PEKERJAAN PIPA TERMASUK PEMASANGAN
U-BOLT SETIAP 12M.
9. PEMASANGAN POMPA SUDAH TERMASUK PEMASANGAN FRAME POMPA DENGAN WF 200 (DISESUAIKAN
DENGAN UKURAN POMPA / MATERIAL OLEH OWNER) DAN DYNA BOLT (DISEDIAKAN OLEH KONTRAKTOR).
10. MENJADI SCOPE KONTRAKTOR UNTUK MENYEDIAKAN MANPOWER DAN PERALATAN SEPERTI TEST PUMP DAN
LAIN LAIN UNTUK MEMBANTU PROSES HYDROTEST DAN PNEUMATIK TEST APABILA DIPERLUKAN
11. SETIAP PEKERJAAN YANG MEMERLUKAN SKAFOLDING, MAKA DISEDIAKAN OLEH KONTRAKTOR.
12. PLATE STRIP ISOLASI DIPASANG SETIAP 900 MM UNTUK UKURAN 900 MMW X 3000 MML & 900 MMW X 4000
MML, DAN SETIAP 1000 MM UNTUK PU BOARD 1000 MMW X 1000 MML
13. UNTUK PEKERJAAN ISOLASI, MATERIAL ROCKWOOL & ALUMINIUM DISEDIAKAN OWNER
UNTUK KAWAT BETON & PAKU RIVET DISEDIAKAN OLEH KONTRAKTOR
14. VOLUME PEKERJAAN ISOLASI EQUIPMENT SEPERTI VESSEL, TANGKI & PIPA UKURAN 8 INCH KE ATAS DIHITUNG
BERDASARKAN OUTSIDE DIAMETER DITAMBAH 2 KALI TEBAL ISOLASI EQUIPMENT & PIPA TERSEBUT

15. SAMPAH SISA PEKERJAAN ISOLASI HARUS DIPINDAHKAN OLEH KONTRAKTOR MENUJU KE TEMPAT YANG
DITUNJUK OWNER
16. MATERIAL CONCRETE WIRE PENGIKAT ISOLASI DAN COPPER TUBE DISEDIAKAN OLEH KONTRAKTOR
17. SEBELUM MELAKUKAN PEKERJAAN TIE-IN KE PIPA ATAUPUN TANGKI DI PLANT, PIHAK KONTRAKTOR
WAJIB MELAKUKAN KOORDINASI DAN MEMINTA PERSETUJUAN DARI PIHAK PLANT
18. SEBELUM MELAKUKAN PEKERJAAN PANAS PIHAK KONTRAKTOR WAJIB MENGAJUKAN " HOT WORK
PERMITT" TERLEBIH DAHULU
19. KONTRAKTOR WAJIB MEMENUHI ATURAN DAN PROSEDUR YANG BERLAKU DI LOKASI PROYEK/PLANT

B. KETENTUAN KHUSUS
1. LANSIR MATERIAL KE LOKASI PEKERJAAN BY KONTRAKTOR

C. TIE IN POINT LIST


TP-1 : TIE IN DENGAN JALUR OSBL 2" CS PADA ELEVASI ± 6 MTR
TP-2 : TIE IN DENGAN JALUR OSBL 2" GALV PADA ELEVASI ± 6 MTR
TP-3 : TIE IN DENGAN JALUR OSBL 2" GALV PADA ELEVASI ± 6 MTR
TP-4 : TIE IN DENGAN JALUR OSBL 2" GALV PADA ELEVASI ± 6 MTR
TP-5 : TIE IN DENGAN JALUR OSBL 2" GALV PADA ELEVASI ± 6 MTR
TP-6 : TIE IN DENGAN JALUR OSBL 3" CS PADA ELEVASI ± 6 MTR
TP-7 : TIE IN DENGAN JALUR OSBL NATURAL GAS 3" CS PADA ELEVASI ± 6 MTR

NOTE: TP = TIE IN POINT, LIHAT GAMBAR PID DAN PIPING LAYOUT


COST SUMMARY

NAMA PEKERJAAN : PEKERJAAN FABRIKASI DAN INSTALASI PIPA ISBL, PIPE SUPPORT,
PENGECATAN PADA PROYEK 1ST & 2ND GAS ENGINE 2X3,3MW (IBP-20-253)
PEMILIK : PT. INTIBENUA PERKASATAMA
LOKASI PEKERJAAN : DUMAI - LUBUK GAUNG
KONTRAKTOR :
REVISI :0
TANGGAL :
NO. PENAWARAN :
DURASI PEKERJAAN (OWNER) : 75 HARI
JUMLAH PEKERJA (OWNER) : 18 ORANG
(JUMLAH PEKERJA DAPAT DITAMBAHKAN SESUAI KEBUTUHAN & URGENSI PEKERJAAN)
DURASI PEKERJAAN (KONTRAKTOR) :
JUMLAH PEKERJA (KONTRAKTOR) :
(DURASI & JUMLAH PEKERJA DIISI BILA KONTRAKTOR TIDAK DAPAT MEMENUHI DURASI & JUMLAH PEKERJA DARI
OWNER)
NO. TEMPLATE BQ : TBQ22-0269-R0

IDR
PEKERJAAN PERSIAPAN
LISTRIK : BY OWNER
AIR : BY OWNER
: -
: -
: -
: -
: -

A. PIPING FABRICATION & INSTALLATION : -

B. PAINTING : -

C. SUPPORT STRUCTURE : -

D. EQUIPMENT INSTALLATION : -

E. FABRICATION & INSTALLATION : -

GRAND TOTAL -
PPN 10% -
TOTAL -
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS

A. PIPING FABRICATION & INSTALLATION

25 30.0 MTR - STIK


40 24.0 MTR - STIK
50 17.0 MTR - STIK
80 22.0 MTR - STIK
100 3.0 MTR - STIK
600 9.0 MTR - STIK
PIPE, ASTM A106 GR.B, ANSI B36.10, END ANSI B16.25, SCH40, SEAMLESS
800 14.0 MTR - STIK
15 72.0 MTR - FULL ARGON (NG LINE)
25 66.0 MTR - FULL ARGON (NG LINE)
50 4.0 MTR - FULL ARGON (NG LINE)
65 8.0 MTR - FULL ARGON (NG LINE)
80 24.0 MTR - FULL ARGON (NG LINE)

15 36.0 MTR - STIK


25 108.0 MTR - STIK
40 18.0 MTR - STIK
PIPE, ASTM A106, GR.A GALVANIZED , ANSI B36.10, SEAMLESS 50 125.0 MTR - STIK
80 72.0 MTR - STIK
100 70.0 MTR - STIK
125 8.0 MTR - STIK

25 30.0 MTR - FULL ARGON


PIPE, ASTM A 312 GR. TP304L, ANSI B36.19/B16.10, END ANSI B16.25, SCH10S, WELDED
40 54.0 MTR - FULL ARGON

25 10 PCS - STIK
40 10 PCS - STIK
50 13 PCS - STIK
80 10 PCS - STIK
600 2 PCS - STIK
ELBOW LONG RADIUS 90° SEAMLESS, ASTM A234 GR.WPB,ANSI B16.9,BUTTWELD
800 4 PCS - STIK
ENDS,SCH40
15 25 PCS - FULL ARGON (NG LINE)
25 25 PCS - FULL ARGON (NG LINE)
50 2 PCS - FULL ARGON (NG LINE)
65 4 PCS - FULL ARGON (NG LINE)
80 8 PCS - FULL ARGON (NG LINE)

15 21 PCS - STIK
25 40 PCS - STIK
40 8 PCS - STIK
ELBOW 90 DEG, ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS, LR,
50 12 PCS - STIK
SCH40, SEAMLESS
80 40 PCS - STIK
100 40 PCS - STIK
125 2 PCS - STIK

25 12 PCS - FULL ARGON


ELBOW L.R. WELDED, ASTM A 403 GR.WPB304L ANSI B16.9 BUTTWELD ENDS, SCH10
40 18 PCS - FULL ARGON

HALF COUPLING, ASTM A 182 GR.F304L ANSI B16.11 SOCKET WELD ENDS 15 2 PCS - FULL ARGON

HALF COUPLING, ASTM A 105, ANSI B16.11, SOCKETWELD END, 3000# 15 50 PCS - STIK
40 2 PCS - STIK

HALF NIPPLE ASTM A 312 GR. TP304L ONE END THREAD TO ANSI B1.20.1-NPT 25 6 PCS - FULL ARGON

HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT 25 2 PCS - STIK

3/8" 6 PCS - STIK


15 40 PCS - STIK
HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT, GALVANIZED
20 6 PCS - STIK
25 38 PCS - STIK

HALF COUPLING, ASTM A105, ANSI B16.11, FEMALE THREADED END, GALVANIZED 15 2 PCS - STIK

25/20 2 PCS - STIK


REDUCER CONC., ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
40/32 4 PCS - STIK

25/15 2 PCS - STIK


50/25 2 PCS - STIK
50/40 4 PCS - STIK
REDUCER CONC., ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS 80/65 4 PCS - STIK
100/80 12 PCS - STIK
150/100 4 PCS - STIK
150/125 2 PCS - STIK

25 2 PCS - STIK
40 5 PCS - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
50 2 PCS - STIK
65 4 PCS - FULL ARGON (NG LINE)

50 4 PCS - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 80 2 PCS - STIK
100 2 PCS - STIK

EQUAL TEE WELDED, ASTM A 403 GR.WP304L ANSI B16.9 BUTTWELD ENDS 40 4 PCS - FULL ARGON
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS
40/25 2 PCS - STIK
REDUCED TEE, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS
80/65 2 PCS - FULL ARGON (NG LINE)

25/15 6 PCS - STIK


REDUCED TEE, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, GALVANIZED
50/25 12 PCS - STIK

TEE REDUCED, ASTM A403 GR. WP304, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 4 PCS - FULL ARGON

REDUCER CON., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - FULL ARGON

REDUCER ECC., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - FULL ARGON

40/25 2 PCS - STIK


REDUCER ECC., ASTM A234 GR. WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 100/80 2 PCS - STIK
125/100 2 PCS - STIK

65 4 PCS - FLANGED
80 8 PCS - FLANGED
BUTTERFLY VALVE, CS, FLANGED END ANSI 150
100 10 PCS - FLANGED
125 2 PCS - FLANGED

25 8 PCS - FLANGED
40 6 PCS - FLANGED
50 8 PCS - FLANGED
BALL VALVE, CS, FLANGED END ANSI 150
65 8 PCS - FLANGED
80 2 PCS - FLANGED
100 2 PCS - FLANGED

15 7 PCS - STIK
BALL VALVE, CS, BUTTWELD END
25 4 PCS - FULL ARGON (NG LINE)

3/8" 2 PCS - SCREWED


15 16 PCS - SCREWED
BALL VALVE, CS, SCREWED END
20 2 PCS - SCREWED
25 8 PCS - SCREWED

25 4 PCS - FLANGED
BALL VALVE, SS304, FLANGED END ANSI 150
40 9 PCS - FLANGED

50 2 PCS - FLANGED
DISCO CHECK VALVE, CS, WAFER TYPE
80 1 PCS - FLANGED

DISCO CHECK VALVE, SS304, WAFER TYPE 40 2 PCS - FLANGED

25 2 PCS - FLANGED
GLOBE VALVE, CS, FLANGED END ANSI150
50 3 PCS - FLANGED

GLOBE VALVE, CS, FLANGED END ANSI300 80 1 PCS - FLANGED

GLOBE VALVE, CS, SOCKETWELD END 25 4 PCS - STIK

40 2 PCS - FLANGED
Y STRAINER, CS, FLANGED END ANSI 150 100 2 PCS - FLANGED
125 2 PCS - FLANGED

Y STRAINER, SS, FLANGED END ANSI 150 40 2 PCS - FLANGED

BLIND FLANGE, ASTM A 182 GR.F304L ANSI B16.5/RF, #150 40 2 PCS - JOINT BOLT

BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150 80 1 PCS - JOINT BOLT

BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150, GALVANIZED 25 3 PCS - JOINT BOLT
50 4 PCS - JOINT BOLT

25 6 PCS - STIK
50 11 PCS - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 150#
100 4 PCS - STIK
600 10 PCS - STIK

FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 300# 80 1 PCS - STIK

600 2 PCS - STIK


FLANGE SLIP ON, CARBON STEEL, PN10
800 12 PCS - STIK

40 5 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, PN16
50 2 PCS - STIK

25 9 PCS - STIK
32 2 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, PN25
40 22 PCS - STIK
80 2 PCS - STIK

25 16 PCS - FULL ARGON


FLANGE SLIP ON, ASTM A182 GR.F304L, ANSI B16.5/RF, CLASS 150#.
40 22 PCS - FULL ARGON
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS
25 28 PCS - STIK
40 22 PCS - STIK
50 20 PCS - STIK
FLANGE SLIP ON, ASTM A105 GALVANIZED, ANSI B16.5/ RF, CLASS 150# 65 8 PCS - STIK
80 16 PCS - STIK
100 28 PCS - STIK
125 8 PCS - STIK

65 4 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN10 80 4 PCS - STIK
100 8 PCS - STIK

40 2 PCS - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN16
65 2 PCS - STIK

50 2 PCS - FULL ARGON (NG LINE)


FLANGE WELDING NECK, ASTM A105 ANSI B16.5/ RF, CLASS 150# 65 18 PCS - FULL ARGON (NG LINE)
80 7 PCS - FULL ARGON (NG LINE)

FLANGE WELDING NECK, CARBON STEEL, PN10 100 2 PCS - FULL ARGON (NG LINE)

FLANGE WELDING NECK, CARBON STEEL, PN16 25 6 PCS - FULL ARGON (NG LINE)

80 8 PCS - JOINT BOLT


FLEXIBLE HOSE, CARBON STEEL, PN16
100 4 PCS - JOINT BOLT

AIR VENT 15 8 PCS - SCREWED

32 2 PCS - STIK
PRESSURE SAFETY VALVE
40 2 PCS - FLANGED

SUB TOTAL

B. PAINTING

15 12 MTR -
25 105 MTR -
40 20 MTR -
PIPE PAINTING (GREEN) 50 114 MTR -
80 115 MTR -
100 115 MTR -
125 10 MTR -

15 75 MTR -
25 65 MTR -
PIPE PAINTING (YELLOW) 50 4 MTR -
65 8 MTR -
80 22 MTR -

15 30 MTR -
PIPE PAINTING (BLUE) 25 36 MTR -
50 47 MTR -

25 32 MTR -
PIPE PAINTING (BROWN)
40 60 MTR -

SUB TOTAL

C. SUPPORT STRUCTURE

UNP 100X50X5MMX6MTR 112.0 KG -

SUB TOTAL

D. EQUIPMENT INSTALLATION

BOILER FEED WATER PUMP 2 UNIT -


LUBE OIL PUMP 2 UNIT -
MAKE UP WATER PUMP 2 UNIT -
LOW TEMP COOLING WATER PUMP 2 UNIT -
HIGH TEMP COOLING WATER PUMP 2 UNIT -
GAS ENGINE 2 UNIT -
SILENCER 2 UNIT -
BOILER 1 UNIT -
ECONOMIZER 1 UNIT -
EXPANSION TANK 6 UNIT -
RADIATOR 2 UNIT -
GAS TRAIN 2 UNIT -
PRE CHAMBER 2 UNIT -
VESSEL GAS TANK 2 UNIT -
GAS COMPRESSOR 2 UNIT -
INTAKE FAN 4 UNIT -
EXHAUST FAN 4 UNIT -
EXPANSION JOINT 600 2 UNIT -
800 2 UNIT -
THREE-WAY VALVE 800 2 UNIT -
150 2 UNIT -
80 2 UNIT -
TWO-WAY VALVE 800 2 UNIT -
OXIDIZING CATALYST 600 2 UNIT -

SUB TOTAL
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) REMARKS

E. FABRICATION & INSTALLATION

REDUCER CONCENTRIC, MATERIAL : CARBON STEEL 800/600 4.0 UNIT -


DUCTING 1500MM X 750MM 11.0 MTR -
DUCTING DIA.750MM 1.5 MTR -

SUB TOTAL
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS

A. PIPING FABRICATION & INSTALLATION

25 30.0 MTR - - STIK


40 24.0 MTR - - STIK
50 17.0 MTR - - STIK
80 22.0 MTR - - STIK
100 3.0 MTR - - STIK
600 9.0 MTR - - STIK
PIPE, ASTM A106 GR.B, ANSI B36.10, END ANSI B16.25, SCH40, SEAMLESS
800 14.0 MTR - - STIK
15 72.0 MTR - - FULL ARGON (NG LINE)
25 66.0 MTR - - FULL ARGON (NG LINE)
50 4.0 MTR - - FULL ARGON (NG LINE)
65 8.0 MTR - - FULL ARGON (NG LINE)
80 24.0 MTR - - FULL ARGON (NG LINE)

15 36.0 MTR - - STIK


25 108.0 MTR - - STIK
40 18.0 MTR - - STIK
PIPE, ASTM A106, GR.A GALVANIZED , ANSI B36.10, SEAMLESS 50 125.0 MTR - - STIK
80 72.0 MTR - - STIK
100 70.0 MTR - - STIK
125 8.0 MTR - - STIK

25 30.0 MTR - - FULL ARGON


PIPE, ASTM A 312 GR. TP304L, ANSI B36.19/B16.10, END ANSI B16.25, SCH10S, WELDED
40 54.0 MTR - - FULL ARGON

25 10 PCS - - STIK
40 10 PCS - - STIK
50 13 PCS - - STIK
80 10 PCS - - STIK
600 2 PCS - - STIK
ELBOW LONG RADIUS 90° SEAMLESS, ASTM A234 GR.WPB,ANSI B16.9,BUTTWELD
800 4 PCS - - STIK
ENDS,SCH40
15 25 PCS - - FULL ARGON (NG LINE)
25 25 PCS - - FULL ARGON (NG LINE)
50 2 PCS - - FULL ARGON (NG LINE)
65 4 PCS - - FULL ARGON (NG LINE)
80 8 PCS - - FULL ARGON (NG LINE)

15 21 PCS - - STIK
25 40 PCS - - STIK
40 8 PCS - - STIK
ELBOW 90 DEG, ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS, LR,
50 12 PCS - - STIK
SCH40, SEAMLESS
80 40 PCS - - STIK
100 40 PCS - - STIK
125 2 PCS - - STIK

25 12 PCS - - FULL ARGON


ELBOW L.R. WELDED, ASTM A 403 GR.WPB304L ANSI B16.9 BUTTWELD ENDS, SCH10
40 18 PCS - - FULL ARGON

HALF COUPLING, ASTM A 182 GR.F304L ANSI B16.11 SOCKET WELD ENDS 15 2 PCS - - FULL ARGON

HALF COUPLING, ASTM A 105, ANSI B16.11, SOCKETWELD END, 3000# 15 50 PCS - - STIK
40 2 PCS - - STIK

HALF NIPPLE ASTM A 312 GR. TP304L ONE END THREAD TO ANSI B1.20.1-NPT 25 6 PCS - - FULL ARGON

HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT 25 2 PCS - - STIK

3/8" 6 PCS - - STIK


15 40 PCS - - STIK
HALF NIPPLE ASTM A106 GR. B, ONE END THREAD TO ANSI B1.20.1-NPT, GALVANIZED
20 6 PCS - - STIK
25 38 PCS - - STIK

HALF COUPLING, ASTM A105, ANSI B16.11, FEMALE THREADED END, GALVANIZED 15 2 PCS - - STIK

25/20 2 PCS - - STIK


REDUCER CONC., ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
40/32 4 PCS - - STIK

25/15 2 PCS - - STIK


50/25 2 PCS - - STIK
50/40 4 PCS - - STIK
REDUCER CONC., ASTM A234 GR.WPB, ANSI B16.9, GALVANIZED, BUTT WELD ENDS 80/65 4 PCS - - STIK
100/80 12 PCS - - STIK
150/100 4 PCS - - STIK
150/125 2 PCS - - STIK

25 2 PCS - - STIK
40 5 PCS - - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, SEAMLESS
50 2 PCS - - STIK
65 4 PCS - - FULL ARGON (NG LINE)

50 4 PCS - - STIK
TEE EQUAL, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 80 2 PCS - - STIK
100 2 PCS - - STIK

EQUAL TEE WELDED, ASTM A 403 GR.WP304L ANSI B16.9 BUTTWELD ENDS 40 4 PCS - - FULL ARGON

40/25 2 PCS - - STIK


REDUCED TEE, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS
80/65 2 PCS - - FULL ARGON (NG LINE)

25/15 6 PCS - - STIK


REDUCED TEE, ASTM A234 GR.WPB, ANSI B16.9, BUTT WELD ENDS, GALVANIZED
50/25 12 PCS - - STIK

TEE REDUCED, ASTM A403 GR. WP304, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 4 PCS - - FULL ARGON

REDUCER CON., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - - FULL ARGON

REDUCER ECC., ASTM A403 GR. WP304L, ANSI B16.9, BUTT WELD ENDS, SCH10S, WELDED 40/25 2 PCS - - FULL ARGON
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS
40/25 2 PCS - - STIK
REDUCER ECC., ASTM A234 GR. WPB, ANSI B16.9, BUTT WELD ENDS, SCH40, GALVANIZED 100/80 2 PCS - - STIK
125/100 2 PCS - - STIK

65 4 PCS - - FLANGED
80 8 PCS - - FLANGED
BUTTERFLY VALVE, CS, FLANGED END ANSI 150
100 10 PCS - - FLANGED
125 2 PCS - - FLANGED

25 8 PCS - - FLANGED
40 6 PCS - - FLANGED
50 8 PCS - - FLANGED
BALL VALVE, CS, FLANGED END ANSI 150
65 8 PCS - - FLANGED
80 2 PCS - - FLANGED
100 2 PCS - - FLANGED

15 7 PCS - - STIK
BALL VALVE, CS, BUTTWELD END
25 4 PCS - - FULL ARGON (NG LINE)

3/8" 2 PCS - - SCREWED


15 16 PCS - - SCREWED
BALL VALVE, CS, SCREWED END
20 2 PCS - - SCREWED
25 8 PCS - - SCREWED

25 4 PCS - - FLANGED
BALL VALVE, SS304, FLANGED END ANSI 150
40 9 PCS - - FLANGED

50 2 PCS - - FLANGED
DISCO CHECK VALVE, CS, WAFER TYPE
80 1 PCS - - FLANGED

DISCO CHECK VALVE, SS304, WAFER TYPE 40 2 PCS - - FLANGED

25 2 PCS - - FLANGED
GLOBE VALVE, CS, FLANGED END ANSI150
50 3 PCS - - FLANGED

GLOBE VALVE, CS, FLANGED END ANSI300 80 1 PCS - - FLANGED

GLOBE VALVE, CS, SOCKETWELD END 25 4 PCS - - STIK

40 2 PCS - - FLANGED
Y STRAINER, CS, FLANGED END ANSI 150 100 2 PCS - - FLANGED
125 2 PCS - - FLANGED

Y STRAINER, SS, FLANGED END ANSI 150 40 2 PCS - - FLANGED

BLIND FLANGE, ASTM A 182 GR.F304L ANSI B16.5/RF, #150 40 2 PCS - - JOINT BOLT

BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150 80 1 PCS - - JOINT BOLT

BLIND FLANGE, ASTM A105 ANSI B16.5/RF, #150, GALVANIZED 25 3 PCS - - JOINT BOLT
50 4 PCS - - JOINT BOLT

25 6 PCS - - STIK
50 11 PCS - - STIK
FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 150#
100 4 PCS - - STIK
600 10 PCS - - STIK

FLANGE SLIP ON, ASTM A105 ANSI B16.5/ RF, CLASS 300# 80 1 PCS - - STIK

600 2 PCS - - STIK


FLANGE SLIP ON, CARBON STEEL, PN10
800 12 PCS - - STIK

40 5 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, PN16
50 2 PCS - - STIK

25 9 PCS - - STIK
32 2 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, PN25
40 22 PCS - - STIK
80 2 PCS - - STIK

25 16 PCS - - FULL ARGON


FLANGE SLIP ON, ASTM A182 GR.F304L, ANSI B16.5/RF, CLASS 150#.
40 22 PCS - - FULL ARGON

25 28 PCS - - STIK
40 22 PCS - - STIK
50 20 PCS - - STIK
FLANGE SLIP ON, ASTM A105 GALVANIZED, ANSI B16.5/ RF, CLASS 150# 65 8 PCS - - STIK
80 16 PCS - - STIK
100 28 PCS - - STIK
125 8 PCS - - STIK

65 4 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN10 80 4 PCS - - STIK
100 8 PCS - - STIK

40 2 PCS - - STIK
FLANGE SLIP ON, CARBON STEEL, GALVANIZED, PN16
65 2 PCS - - STIK

50 2 PCS - - FULL ARGON (NG LINE)


FLANGE WELDING NECK, ASTM A105 ANSI B16.5/ RF, CLASS 150# 65 18 PCS - - FULL ARGON (NG LINE)
80 7 PCS - - FULL ARGON (NG LINE)

FLANGE WELDING NECK, CARBON STEEL, PN10 100 2 PCS - - FULL ARGON (NG LINE)

FLANGE WELDING NECK, CARBON STEEL, PN16 25 6 PCS - - FULL ARGON (NG LINE)

80 8 PCS - - JOINT BOLT


FLEXIBLE HOSE, CARBON STEEL, PN16
100 4 PCS - - JOINT BOLT

AIR VENT 15 8 PCS - - SCREWED

32 2 PCS - - STIK
PRESSURE SAFETY VALVE
40 2 PCS - - FLANGED

SUB TOTAL -
SPECIFICATION SIZE QTY UNIT UNIT PRICE (IDR) TOTAL COST (IDR) REMARKS

B. PAINTING

15 12 MTR - -
25 105 MTR - -
40 20 MTR - -
PIPE PAINTING (GREEN) 50 114 MTR - -
80 115 MTR - -
100 115 MTR - -
125 10 MTR - -

15 75 MTR - -
25 65 MTR - -
PIPE PAINTING (YELLOW) 50 4 MTR - -
65 8 MTR - -
80 22 MTR - -

15 30 MTR - -
PIPE PAINTING (BLUE) 25 36 MTR - -
50 47 MTR - -

25 32 MTR - -
PIPE PAINTING (BROWN)
40 60 MTR - -

SUB TOTAL -

C. SUPPORT STRUCTURE

UNP 100X50X5MMX6MTR 112.0 KG - -

SUB TOTAL -

D. EQUIPMENT INSTALLATION

BOILER FEED WATER PUMP 2 UNIT - -


LUBE OIL PUMP 2 UNIT - -
MAKE UP WATER PUMP 2 UNIT - -
LOW TEMP COOLING WATER PUMP 2 UNIT - -
HIGH TEMP COOLING WATER PUMP 2 UNIT - -
GAS ENGINE 2 UNIT - -
SILENCER 2 UNIT - -
BOILER 1 UNIT - -
ECONOMIZER 1 UNIT - -
EXPANSION TANK 6 UNIT - -
RADIATOR 2 UNIT - -
GAS TRAIN 2 UNIT - -
PRE CHAMBER 2 UNIT - -
VESSEL GAS TANK 2 UNIT - -
GAS COMPRESSOR 2 UNIT - -
INTAKE FAN 4 UNIT - -
EXHAUST FAN 4 UNIT - -
EXPANSION JOINT 600 2 UNIT - -
800 2 UNIT - -
THREE-WAY VALVE 800 2 UNIT - -
150 2 UNIT - -
80 2 UNIT - -
TWO-WAY VALVE 800 2 UNIT - -
OXIDIZING CATALYST 600 2 UNIT - -

SUB TOTAL -

E. FABRICATION & INSTALLATION

REDUCER CONCENTRIC, MATERIAL : CARBON STEEL 800/600 4.0 UNIT - -


DUCTING 1500MM X 750MM 11.0 MTR - -
DUCTING DIA.750MM 1.5 MTR - -

SUB TOTAL -