Coring on Slab

ADB HOTELING PROJECT


6 ADB Ave. Mandaluyong City

REQUEST FOR APPROVAL


(Shop Drawing / Equipment / Materials Submittals / Technical Data)

To : ADB - Corporate Services Department Date : 31-Aug-22


Attention : Mr. Arman Mohammad RFA No. :
Thru : SPCastro, Inc. Trade Works : ELECTRICAL
Project : ADB - Hoteling Project
- LEED - NON-LEED

We are pleased to submit the following RFA items for your review and comments in order to proceed with the elements of the work :

S- Samples X S/D- Shop Drawing TR- Test Result


MS- Method Statement CL- Cutting List CC- Certification
CSD- Coordination Shop Drawing B- Brochure / Catalogue

Your soonest action and response to this RFA will be highly appreciated.

ITEM NO. DESCRIPTION / DETAILS REF. DOC. SPECS. / DWG No. SUPPLIER / MANUFACTURER QTY / Unit REMARKS

1.0 Coring on Slab see attached drawing see attached drawing for Approval

Prepared & Submitted by:

RFA requested response________________ Rhee John Zid Blanza


Contr's Authorized Representative

FOR DESIGNER's ENDORSEMENT

CONSULTANT's ACTION/DISPOSITION
Approved Approved As Noted Revise & Resubmit Disapproved
Action Codes
[ ] A - Work may proceed Revise & Resubmit, Revise & Re-submit, Review Not required Disapproved
Work may proceed Work may not proceed Work may proceed
subject to changes indicated

ARCHITECT/LEAD DESIGNER OTHER CONSULTANTS


________ _______ _______ _______
_______ _______ _______

Signed & Endorsed By : Signed & Endorsed By :

(Print Name / Signature/Date) (Print Name / Signature/Date)

FOR CONSTRUCTION MANAGER's ENDORSEMENT / OWNER'S APPROVAL


Comments

Endorsed by : Approved by :

Mr. Warren C. Ramos Mr. Arman Mohammad


SPCastro, Inc. Owner's Authorized Representative

Date: Date:
Note: Approval of the above submittals relate only to conformance with design concept and the requirements of the plans and specifications. Contractor is responsible for accuracy, especially in matters of dimensions to be confirmed and correlated at the Project
site, fabrications or construction techniques and for coordination with the work of all trades. Materials and equipment actually installed shall be subject for final inspection and shall equal or exceed the quality of the approved samples. Approval of the above items
does not relieve the contractor from its duties and responsibilities in complying to the drawings and specifications and as provided in the contract documents.

Copyright 2017 SPCastro, Inc. CMU-21C


All rights reserved Issue No. 03/ Rev. 0
4 5 6 7

13 22
1611 MEN
14 F 23
1519
LE-9
N
1615 LOCATION OF
HOTELING
150mm (W) x 30mm (H)

1397 1367
3" Diameter
Coring on
3" Diameter N

2089

2089

\\192.168.1.40\Technical Design\2022\ADB\ADB L1 HOTELING RENOVATION\EE\CAD\EE\EE-100, 110, 120, 130 ADB L1 HOTELING RENOVATION_REV1_08.24.22.dwg 8-24-22 06:14:19 PM TECH8
1800 1800 1800 1800 1800
Slab 1800 LEVEL 1

1825
1735
150mm (W) x 30mm (H)

Coring on 1336 1471 1471 1336

Slab NORMAL POWER FLOOR MOUNTED OUTLET


Q4
Q3

1800

1800
1336
2230
NORMAL POWER FLOOR MOUNTED OUTLET

1619 LOCKERS (28) 1015 1015 LOCKERS (28)


P DUPLEX UPS POWER OUTLET

1636

2881
PRINTER LOCKERS (12)
DUPLEX NORMAL POWER OUTLET
LOCKERS (12) PRINTER

1667
1161
TRASH BIN
1476
1476 TRASH BIN NEW WIREWAY FLOOR EMBEDED

1080

1080
- 150mm (W) x 30mm (H)

1825
2870 MAIN
EXPRESSO BOOK MACHINE
1627 1667 1667
ENTRANCE

3" Diameter
1476

1080

1080
1476
TRASH BIN 1161 TRASH BIN

1667
LOCKERS (12) PRINTER Coring on PRINTER LOCKERS 3 LAYERS

3" Diameter Slab IMPLEMENTATION

1941

1941
Coring on 2545
975 1055
2504
1635
LOCKERS (28) LOCKERS 4 LAYERS
Q
Slab

1311
1295
1336 2208 1336
1800

1800
ASIAN DEVELOPMENT BANK

Q2 Q1
1336
1471
1336
PROPOSED ALTERATION WORK
1825

1825
1639
1800 1800 1800 1367 1367 1800 1800 1800 HOTELING WORKSPACE, EAST ATRIUM
2100

2100
1800

R
2022-AIS-HTL_L1_Z1_
WOMEN 1643 1129
1129a
MEN R. BLANZA EE_0130
DATA 23 JULY 2022
1647 1124
E. MANUNDO N/A
Note: Coring on Slab is needed for
N/A
the access of wireway at groundfloor ADB EE 942 SQ.M.
ceiling, this will be used for Data
1:200 MTS.
PROPOSED POWER LAYOUT homerun. ADB EE