Indra: Special Installation/ Pre-Commissioning Method For Float Type Tank Gauge
Indra: Special Installation/ Pre-Commissioning Method For Float Type Tank Gauge
SONATRACH
Activité E&P
Pôle Exploitation & Production
Division Production
Direction Régionale Hassi-R’mel
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 1 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 2 OF 10
REFERENCE DOCUMENTS
DOC. NO. DESCRIPTION
V-2173-302-A-001 Data Sheet and General Arrangement Drawing
V-2173-302-A-801 Operating and Maintenance Manual
V-2154-101-A-C001 Tank General Assembly Drawing
V-2154-101-A-C027 Fire Water Tank Detail of Level Indicator
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 2 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 3 OF 10
A. SPLIT OF SCOPE
Split of Scope between Tank and Instrument will be as per below table:
Materials to be supplied by Tank is on Attachment 1, Sheet 9 and 10 of 10.
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 3 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 4 OF 10
B. INSTALLATION
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 4 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 5 OF 10
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 5 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 6 OF 10
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 6 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 7 OF 10
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 7 / 10
LLED
NCONTRO
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No. -
Contractor’s Doc. No. H-3000-1373-703
Special Installation/
Pre-Commissioning Method for Float
Type Tank Gauge Sheet 8 OF 10
D R A
IN
10-SE
P - 2 0 18
PRINT
ED
WHEN 8 / 10
LLED
NCONTRO
H-3000-1373-703 <A>
ATTACHMENT 1 Page 9 of 10
In Drawing In Packing List
Parts
Tank No. Drawing No. Description Material Size Length QTY Remarks (1) PKG NO. (7) TAG NO. (8) DESCRIPTION (incl Size Information) (10) Q'TY (16)REMARK
No.
3002‐T‐951 V‐2154‐101‐A‐C027 1 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 6000 2 NPT BOTH END 3002‐T‐951
VB1‐113 LEVEL INDICATOR PIPE ASSEMBLY ‐ L2 (1 ‐ 1 / 2" x 6000L) 2 set IRC005: VB1‐113
3002‐T‐951 V‐2154‐101‐A‐C027 22 FULL COUPLING A105 (HDG) 1‐1/2" x 3000# ‐ 2 THREADED ITEM 1
3002‐T‐951
3002‐T‐951 V‐2154‐101‐A‐C027 2 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 5827.2 1 NPT BOTH END VB1‐113 LEVEL INDICATOR PIPE ASSEMBLY ‐ L2 (1 ‐ 1 / 2" x 5827.2L) 1 set IRC005: VB1‐113
ITEM 2
3002‐T‐951 V‐2154‐101‐A‐C027 3 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 663 1 NPT BOTH END
3002‐T‐951
3002‐T‐951 V‐2154‐101‐A‐C027 4 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 835 1 NPT BOTH END VB1‐113 LEVEL INDICATOR PIPE ASSEMBLY ‐ L2 (1 ‐ 1 / 2" x 1498L) 1 set IRC005: VB1‐113
ITEM 3
3002‐T‐951 V‐2154‐101‐A‐C027 6 UNION A105 (HDG) 1‐1/2" x 3000# ‐ 1 NPT F‐F
3002‐T‐951 V‐2154‐101‐A‐C027 3 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 663 1 NPT BOTH END
3002‐T‐951
3002‐T‐951 V‐2154‐101‐A‐C027 4 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 835 1 NPT BOTH END VB1‐113 LEVEL INDICATOR PIPE ASSEMBLY ‐ L2 (1 ‐ 1 / 2" x 1498L) 1 set IRC005: VB1‐113
ITEM 4
3002‐T‐951 V‐2154‐101‐A‐C027 6 UNION A105 (HDG) 1‐1/2" x 3000# ‐ 2 NPT F‐F
3002‐T‐951 V‐2154‐101‐A‐C027 5 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 1139 1 NPT BOTH END
3002‐T‐951
3002‐T‐951 V‐2154‐101‐A‐C027 11 FULL COUPLING A312 TP304 1‐1/2" x 3000# ‐ 6 THREADED VB1‐113 LEVEL INDICATOR PIPE ASSEMBLY ‐ L2 (1 ‐ 1 / 2" x 1565L) 1 set IRC005: VB1‐113
ITEM 5
3002‐T‐951 V‐2154‐101‐A‐C027 12 NOZZLE NECK A312 TP304 1‐1/2" x SCH80S 426 3
VB1‐002 3002‐T‐951
3002‐T‐951 V‐2154‐101‐A‐C027 29 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 688.8 1 NPT BOTH END LEVEL INDICATOR PIPE ‐ L2 (1 ‐ 1 / 2" x 688.8L) 1 set IRC008: VB1‐002
(RAA018SM) ITEM 3
VB1‐003 3003‐T‐951
3003‐T‐951 V‐2154‐101‐A‐C027 29 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 688.8 1 NPT BOTH END LEVEL INDICATOR PIPE ‐ L2 (1 ‐ 1 / 2" x 688.8L) 1 set IRC008: VB1‐003
(RAA018SM) ITEM 3
VB1‐004 3009‐T‐951
3009‐T‐951 V‐2154‐101‐A‐C027 29 PIPE A106 Gr.B (HDG) 1‐1/2" x SCH40 688.8 1 NPT BOTH END LEVEL INDICATOR PIPE ‐ L2 (1 ‐ 1 / 2" x 688.8L) 1 set IRC008: VB1‐004
(RAA018SM) ITEM 3
D R A
N
I 10-SEP 8
- 2 0 1
D
RINTE
HEN P
T ROLL
ED W 9 / 10
NCON
H-3000-1373-703 <A>
ATTACHMENT 1 Page 10 of 10
A
AB
EQP: Y.I / K.Y
18-Jun-2018
D R A
N
I 18-JUN-2018
INTED
R A WHEN
PR
1/1
IN0-SD
LLED
NTRO
UNCO
P - 2 0 18
1 E
ED
PRINT
WHEN 10 / 10
LLED
NCO NTRO