67) DE54 ODME Operation
67) DE54 ODME Operation
Probability
Risk Factor
Probability
Severity
Factor
Severity
Health/injury Hazard
Description of work to be Health/injury Hazard Control Measures to be
involved after control
carried out. involved made
measures
Check/Test
Communication with
Bridge OOW and Deck
Communication Failure 3 3 9 Low risk 1 3 3
Personnels involve. Inform
Bridge and ECR of the
planned operation
Multiply Probability with Severity to get the Risk Factor. If Risk Factor > 6, Control measures to be taken. If Risk Factor > 9 after Control
measures, work can not proceed.
Probability:
Expected
return
Description period
Very often on vessel.
<1M 5 MEDIUM 5 HIGH 10 HIGH 15 HIGH 20 HIGH 25
Often on vessel.
1M–1Y 4 LOW 4 MEDIUM 8 HIGH 12 HIGH 16 HIGH 20
Infrequent on vessel, quite likely
in fleet and frequent in industry. 1Y–5Y 3 LOW 3 LOW 6 MEDIUM 9 HIGH 12 HIGH 15
RISK FACTOR>9 Work cannot Safety/health of No impact Medical treatment / Restricted workday / Serious injuries Work related fatality or
proceed until further measures has employee, First aid case Lost time injury (LTI) resulting in permanent permanent total
been taken to get the risk factor contractor or partial disability disability
below 9. third party