Download as pdf
Download as pdf
You are on page 1of 1
= TRG = A A |AGNE ARTICLE NSPECTION REPORT Ne. 49 = we um CLIENT CONTRACTOR LOCATION agoco SHEET 1 OF 1 Sew Engineering FERROSTAAL | ‘saRIR OILFIELD Taknia_ | Construction Dept. | _£CD462/2010 GC-2 Fane oA (ECD) MATERIAL WELD PROCESS EQUIPMENT ‘CONTACT SPACING Carbon Steel GTAW Permanent Magnet 4~6cm. SIZE THICKNESS TYPE ‘CONTRAST PAINT v | 455mm Magnaflux WCP-2 Magnaflux ‘SCHEDULE PREPARATION SURFACE COND'N. MAGNETIC INK Sch.80 Fillet Weld As welded 7HF Magnoflux LINE IDENTIFICATION ‘AREA O-NG-P329B.P1-A1-01 GC-2 DRAWING No. ‘ACCEPTANCE STD. WELD CLASS 2385-NM-1350-102 ANS/ 831.3 10% ‘SPOOL / ITEM No. OPERATOR DATE N/A JV,REAE 22 JULY 2020 WELD wipr | WELD pent, | DIA: | ScH. Ne | AREA TYPE INTERPRETATION RESULT swi | 2” | 80 For | 100% | —PIPE_—i NSD A < — > *NOTHING FOLLOWS* pa I COMMENT / SKETCH : COMPANY |/ TAKNIA AGOCO ‘AGOCO -Sarir NAME [°F Rey Eduardo ‘Abdul Hamed S, DESIGNATION —_|\", “NDT Jnspector E:C.D Dept. Coordinator SIGNATURE i DATE AdziuLy 2020 No SIGNIFICANT DEFECT PG-POROSTY LF LACK OF FUSION A-accepreD NIRSDD-NO REJECTABLE SIGNIFICANT DEFECT CK — CRACK. SUG- UNDERCUT REPAIR

You might also like