Structural Design Data

Facade Panels Trimoterm FTV INVISIO


All rights to alteration reserved. The last versions of documents is available on www.trimo.si
Appendix 3
Load Span Tables

CONTENT

Trimoterm facade panels FTV INVISIO are verified in accordance with Sales Certificate No. Z-10.4-240 of 20 Avgust
2001
- Invisible joint - Type A icluded

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 60 mm 3

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 80 mm 4

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 100 mm 5

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 120 mm 6

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 150 mm 7

Trimoterm façade panels are varified in accordance with Sales Certificate No. Z-10.4-240 od 20 Avgust 2001
- Invisible joint - Type A and B

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 60 mm 8

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 80 mm 9

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 100 mm 10

- Load span table for façade panel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 120 mm 11

- Load span table for façadepanel Trimoterm FTV HSS, tN = 0,60 / 0,60 mm, d = 150 mm 12

− Colour groups 13

- Wind load in accordance with DIN 1055, Edition 8.86 13

Notes:
Load span tables - façade panels Trimoterm FTVss and Trimoterm FTV Hss are also valid for Trimoterm FTVms or
Trimoterm FTV Hms.

1
Notes to tables considering placement of fixings in the invisible joints

The following should be considered:


- Colour groups I (very light), II (light) and III (dark) - see temperature loads.
- The first column (marked as NB) for every area under wind load states max. allowed spans in the area of normal wind
load, the second column (marked as RB) - in the edge area (vertical assembly) on building edges.
- Load span table is valid for closed buildings in accordance with DIN 1055, Part 4 with inner normal climate and is not
valid for buildings in tower-form.
- Deflection is limited to maximum f/100 for individual load cases: wind pressure, wind suction and temperature differ-
ences as well as unfavourable combination of load cases - wind with summer temperature - In this case wind load is
limited to 60%. When this fact is of decisive importance an additional line is stated (marked by (f)).
- Values stated in load span tables are optimised to max. allowed spans. In case of other systems - e.g. smaller distances
between supports - other fixing methods can be sufficient in an individual case or even additional direct fixing might
be necessary, but this should be calculated for each individual case.
- Max. spans are stated in metres [m] and are valid for the fixing method actually stated.
- In case of a deviating static system - e.g. unequal distances between supports, brackets, etc. or any other loads, a calcula
tion should be prepared for each individual case.
- Values of allowed tensile forces on a central support have been stated for a type of fixing on the basis of an export
opinion Z-18 of 15 May 2001 and they represent a form of failure due to screw tearing. Producer has stated the values
of allowed tensile forces for B Type of fixing. The following values have been considered:

Type A: allow. Fz =3.1 kN/on place of supportand longitudinal joint


Type B: allow. Fz =5.1 kN/on place of support and longitudinal joint

Type A Type B

- Tearing of a screw from a sub-structure on intermediate supports shaould be verified for each individual case. The
same applies to verification of fixing on final supports.
- Load span table is valid for panel width b = 1.00 m.
- Load span table is valid for a façade panel with an invisible joint FTV Hms

EXAMPLE OF READING THE DATA

Required width of end supports [mm]

40

4,02 Max. allowed span between supports [m]


78 A

Required width of intermediate Type of fixing on intermediate supports


supports [mm]

2
Load Span Table for Panels Trimoterm FTV Hss 60 (FTV Hms 60), tN = 0,60/0,60 mm
Span distances are stated further on are verified in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable combinations of wind and temperature. Further instructions on table use - see explanations
and example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 40 42 40 47 40
I 4,83 2,54 3,92 1,64 3,43 1,22 3,20 1,05
60 A 60 A 72 A 60 A 84 A 60 A 93 A 60 A
40 40 40 40 40 40 40 40
Double-span
II 2,76 2,54 2,76 1,64 2,61 1,22 2,53 1,05
support
60 A 60 A 61 A 60 A 73 A 60 A 80 A 60 A
40 40 40 40 40 40 40 40
III 1,58 1,58 1,58 1,24 1,58 0,99 1,58 0,88
60 A 60 A 60 A 60 A 61 A 60 A 66 A 60 A
40 40 40 40 47 40 51 40
I 5,66 2,82 4,48 1,78 3,82 1,30 3,51 1,10
63 A 60 A 80 A 60 A 94 A 60 A 102 A 60 A
40 40 40 40 41 40 45 40
Triple-span
II 4,52 2,82 3,74 1,78 3,31 1,30 3,11 1,10
support
60 A 60 A 67 A 60 A 81 A 60 A 90 A 60 A
40 40 40 40 40 40 40 40
III 1,40 1,40 1,40 1,40 1,40 1,30 1,40 1,10
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 40 40 40 41 40
I 4,44 2,54 3,73 1,64 3,27 1,22 2,78 1,05
60 A 60 A 70 A 60 A 82 A 60 A 85 A 60 A
40 40 40 40 40 40 40 40
Double-span
II 2,76 2,54 2,60 1,64 2,44 1,22 2,36 1,05
support
60 60 A 60 A 60 A 71 A 60 A 78 A 60 A
40 40 40 40 40 40 40 40
III 1,58 1,58 1,58 1,24 1,58 0,99 1,58 0,88
60 A 60 A 60 A 60 A 61 A 60 A 66 A 60 A
40 40 40 40 45 40 45 40
I 5,66 2,82 4,48 1,78 3,66 1,30 3,10 1,10
63 A 60 A 80 A 60 A 90 A 60 A 90 A 60 A
40 40 40 40 40 40 40 40
Triple-span
II 3,94 2,82 3,29 1,78 2,92 1,30 2,75 1,10
support
60 A 60 A 60 A 60 A 72 A 60 A 80 A 60 A
40 40 40 40 40 40 40 40
III 1,40 1,40 1,40 1,40 1,40 1,30 1,40 1,10
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Legend :
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a buildings.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

3
Load Span Table for Panels Trimoterm FTV Hss 80 (FTV Hms 80), tN = 0,60 / 0,60 mm
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 43,5 40 49 40 52 40
I 5,66 2,57 4,60 1,66 4,01 1,24 3,55 1,07
67 A 60 A 83 A 60 A 98 A 63 A 104 A 62 A
40 40 40 40 42 40 45 40
Double-
II 3,35 2,35 3,29 1,52 3,10 1,17 2,99 1,03
spansupport
61 A 60 A 71 A 61 A 85 A 61 A 93 A 60 A
40 40 40 40 40 40 40 40
III 1,33 1,33 1,33 1,15 1,33 0,95 1,33 0,86
60 A 60 A 60 A 60 A 60,5 A 60 A 64,5 A 60 A
41 40 46,5 40 54,5 40 57 40
I 6,55 2,83 5,19 1,79 4,42 1,31 3,93 1,11
73 A 60 A 93 A 60 A 109 A 60 A 114 A 60 A
40 40 43,5 40 49 40 54 40
Triple-span
II 5,45 2,83 4,49 1,79 3,96 1,31 3,71 1,11
support
66 A 60 A 80 A 60 A 97 A 60 A 108 A 60 A
40 40 40 40 40 40 40 40
III 1,67 1,67 1,67 1,59 1,67 1,25 1,67 1,06
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 60 40,5 40 41 40
I 5,25 2,57 4,12 1,66 3,30 1,24 2,81 1,07
66 A 60 A 78 A 62 A 88 A 63 A 91 A 62 A
40 40 40 40 40 40 41 40
Double-
II 3,34 2,35 3,08 1,52 2,77 1,17 2,40 1,03
spansupport
61 60 A 69 A 61 A 81 A 61 A 84 A 60 A
40 40 40 40 40 40 40 40
III 1,33 1,33 1,33 1,15 1,33 0,95 1,33 0,86
60 A 60 A 60 A 60 A 61 A 60 A 65 A 60 A
41 40 42,5 40 45 40 59 40
I 6,55 2,83 4,76 1,79 3,67 1,31 3,11 1,11
73 A 60 A 85 A 60 A 90 A 60 A 90 A 60 A
40 40 40,5 40 42,5 40 44 40
Triple-span
II 4,74 2,83 3,93 1,79 3,30 1,31 2,93 1,11
support
61 A 60 A 71 A 60 A 81 A 60 A 85 A 60 A
40 40 40 40 40 40 40 40
III 1,67 1,67 1,67 1,59 1,67 1,25 1,67 1,06
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Legend :
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

4
Load Span Table for Panels Trimoterm FTV Hss 100 (FTV Hms 100), tN = 0,60 / 0,60 mm
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Further instructions for table use - see explana-
tions and example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 47 40 56 40 57 40
I 6,49 2,59 5,27 1,68 4,58 1,26 3,90 1,08
74 A 60 A 94 A 60 A 112 A 65 A 114 A 63 A
40 40 40 40 44 40 50 40
Double-
II 3,94 2,16 3,82 1,40 3,58 1,11 3,45 1,00
spansupport
61 A 60 A 80 A 61 A 96 A 61 A 106 A 60 A
40 40 40 40 40 40 40 40
III 1,08 1,08 1,08 1,06 1,08 0,91 1,08 0,83
60 A 60 A 60 A 60 A 60 A 60 A 63 A 60 A
42 40 53 40 62 40 63 40
I 7,44 2,84 5,89 1,79 5,02 1,31 4,35 1,12
83 A 60 A 105 A 60 A 123 A 60 A 126 A 60 A
40 40 47 40 57 40 63 40
Triple-span
II 6,38 2,84 5,23 1,79 4,60 1,31 4,31 1,12
support
71 A 60 A 93 A 60 A 113 A 60 A 125 A 60 A
40 40 40 40 40 40 40 40
III 1,94 1,94 1,94 1,78 1,94 1,20 1,94 1,02
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 60 41 40 41 40
I 6,06 2,59 4,50 1,68 3,32 1,26 2,83 1,08
72 A 60 A 86 A 64 A 93 A 65 A 96 A 63 A
40 40 40 40 40 40 42 40
Double-
II 3,92 2,16 3,56 1,40 3,10 1,11 2,43 1,00
spansupport
61 60 A 78 A 61 A 90 A 61 A 90 A 60 A
40 40 40 40 40 40 40 40
III 1,08 1,08 1,08 1,06 1,08 0,91 1,08 0,83
60 A 60 A 60 A 60 A 60 A 60 A 63 A 60 A
42 40 45 40 45 40 45 40
I 7,44 2,84 5,04 1,79 3,67 1,31 3,11 1,12
83 A 60 A 90 A 60 A 90 A 60 A 90 A 60 A
40 40 41 40 45 40 45 40
Triple-span
II 5,53 2,84 4,57 1,79 3,67 1,31 3,11 1,12
support
62 A 60 A 82 A 60 A 90 A 60 A 90 A 60 A
40 40 40 40 40 40 40 40
III 1,94 1,94 1,94 1,78 1,94 1,20 1,94 1,02
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A

Legend :
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

5
Load Span Table for Panels Trimoterm FTV Hss 120 (FTV Hms 120), tN = 0,60 / 0,60 mm
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
41 40 51 40 56 40 57 40
I 6,94 2,50 5,65 1,64 4,60 1,26 3,92 1,09
80 A 63 A 102 A 64 A 116 A 66 A 118 A 64 A
40 40 40 40 44 40 50 40
Double-
II 4,08 2,00 4,01 1,36 3,52 1,10 3,11 1,00
spansupport
65 A 61 A 84 A 62 A 100 A 61 A 110 A 60 A
40 40 40 40 40 40 40 40
III 1,04 1,04 1,04 1,03 1,04 0,90 1,04 0,83
60 A 60 A 60 A 60 A 60 A 60 A 62 A 60 A
45 40 57 40 67 40 70 40
I 8,04 2,84 6,35 1,79 5,07 1,32 4,35 1,12
90 A 60 A 113 A 60 A 124 A 60 A 126 A 60 A
40 40 49 40 59 40 63 40
Triple-span
II 6,60 2,84 5,45 1,79 4,81 1,32 4,33 1,12
support
73 A 60 A 97 A 60 A 118 A 60 A 125 A 60 A
40 40 40 40 40 40 41 40
III 2,05 2,05 2,05 1,62 2,01 1,14 2,05 0,99
60 A 60 A 60 A 60 A 61 A 60 A 64 A 60 A

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 52 41 40 41 40
I 6,42 2,50 4,52 1,64 3,26 1,26 2,74 1,09
77 A 63 A 90 A 66 A 96 A 66 A 98 A 64 A
40 40 40 40 41 40 45 40
Double-
II 4,07 2,00 3,46 1,36 2,72 1,10 2,21 1,00
spansupport
65 61 A 82 A 62 A 96 A 61 A 110 A 61 A
40 40 40 40 40 40 40 40
III 1,04 1,04 1,04 1,03 1,04 0,90 1,04 0,83
60 A 60 A 60 A 60 A 60 A 60 A 62 A 60 A
43 40 45 40 45 40 58 40
I 7,69 2,84 5,04 1,79 3,67 1,32 3,12 1,12
86 A 60 A 90 A 60 A 90 A 60 A 90 A 60 A
40 40 43 40 45 40 45 40
Triple-span
II 5,75 2,84 4,76 1,79 3,67 1,32 3,12 1,12
support
64 A 60 A 85 A 60 A 90 A 60 A 90 A 60 A
40 40 40 40 40 40 41 40
III 2,05 2,02 2,05 1,62 2,05 1,14 2,05 0,99
60 A 60 A 60 A 60 A 61 A 60 A 64 A 60 A

Legend :
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

6
Load Span Table for Panels Trimoterm FTV Hss 150 (FTV Hms 150), tN = 0,60 / 0,60 mm

Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
43 40 56 40 57 40 57 40
I 7,61 2,36 6,23 1,59 4,63 1,26 3,95 1,11
88 A 67 A 113 A 69 A 121 A 67 A 124 A 66 A
40 40 40 40 44 40 51 40
Double- II 4,30 1,76 4,30 1,30 3,42 1,08 2,60 0,99
spansupport 71 A 63 A 89 A 63 A 106 A 61 A 117 A 61 A
40 40 40 40 40 40 40 40
III 0,98 0,98 0,98 0,98 0,98 0,88 0,98 0,82
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A
50 40 63 40 74 40 80 40
I 8,93 2,85 7,05 1,80 5,14 1,33 4,36 1,13
100 A 60 A 126 A 60 A 126 A 60 A 126 A 60 A
40 40 52 40 63 40 63 40
Triple-span
II 6,92 2,85 5,77 1,80 5,13 1,33 4,36 1,13
support
77 A 60 A 103 A 60 A 126 A 60 A 126 A 60 A
40 40 40 41 41 40 43 40
III 2,21 2,21 2,21 1,37 2,21 1,05 2,21 0,94
60 A 60 A 60 A 60 A 63 A 69 A 69 A 60 A

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 41 40 40 40 40 40
I 6,95 2,36 4,55 1,59 3,18 1,26 2,61 1,11
84 A 67 A 96 A 69 A 101 A 67 A 102 A 66 A
40 40 40 40 42 40 49 40
Double-
II 4,30 1,76 3,30 1,30 2,16 1,08 1,88 0,99
spansupport
70 63 A 88 A 63 A 104 A 61 A 114 A 61 A
40 40 40 40 40 40 40 40
III 0,98 0,98 0,98 0,98 0,98 0,88 0,98 0,82
60 A 60 A 60 A 60 A 60 A 60 A 60 A 60 A
45 40 45 40 45 40 46 40
I 8,06 2,85 5,05 1,80 3,68 1,33 3,13 1,13
90 A 60 A 90 A 60 A 90 A 60 A 91 A 60 A
40 40 45 40 45 40 46 40
Triple-span
II 6,07 2,85 5,05 1,80 3,68 1,33 3,13 1,13
support
68 A 60 A 90 A 60 A 90 A 60 A 91 A 60 A
40 40 40 41 41 40 43 40
III 2,21 2,15 2,21 1,37 2,21 1,05 2,21 0,94
60 A 60 A 60 A 60 A 63 A 60 A 69 A 60 A

Legend :
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

7
Load Span Table for Panels Trimoterm FTV Hss 60 (FTV Hms 60), tN = 0,60 / 0,60 mm with
A and B types of fixing
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 40 42 40 47 40
I 4,83 4,12 3,92 2,61 3,43 1,93 3,20 1,66
60 A 60 B 72 A 60 B 84 A 65 B 93 A 67 B
40 40 40 40 40 40 40 40
Double-
II 2,76 2,76 2,76 2,60 2,61 1,93 2,53 1,66
spansupport
60 A 60 B 61 A 60 B 73 A 65 B 80 A 60 B
40 40 40 40 40 40 40 40
III 1,58 1,58 1,58 1,58 1,58 1,58 1,58 1,58
60 A 60 A 60 A 60 B 61 A 61 B 66 A 66 B
40 40 40 40 47 40 51 40
I, 5,66 4,64 4,48 2,90 3,82 2,12 3,51 1,80
63 A 60 B 80 A 60 B 94 A 60 B 102 A 60 B
40 40 40 40 41 40 45 40
Triple-span
II 4,52 3,94 3,74 2,90 3,31 2,12 3,11 1,80
support
60 A 60 B 67 A 60 B 81 A 60 B 90 A 60 B
40 40 40 40 40 40 40 40
III 1,40 1,40 1,40 1,40 1,40 1,40 1,40 1,40
60 A 60 A 60 A 60 A 60 A 60 B 60 A 60 B

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 40 40 40 41 40
I 4,44 4,12 3,73 2,61 3,27 1,93 2,78 1,66
60 A 60 B 70 A 60 B 82 A 65 B 85 A 67 B
40 40 40 40 40 40 40 40
Double-
II 2,76 2,76 2,60 2,60 2,44 1,93 2,36 1,66
spansupport
60 60 B 60 A 60 B 71 A 65 B 78 A 60 B
40 40 40 40 40 40 40 40
III 1,58 1,58 1,58 1,58 1,58 1,58 1,58 1,58
60 A 60 A 60 A 60 B 61 A 61 B 66 A 66 B
40 40 40 40 45 40 45 40
I, 5,66 4,64 4,48 2,90 3,66 2,12 3,10 1,80
63 A 60 B 80 A 60 B 90 A 60 B 90 A 60 B
40 40 40 40 40 40 40 40
Triple-span
II 3,94 3,94 3,29 2,90 2,92 2,12 2,75 1,80
support
60 A 60 B 60 A 60 B 72 A 60 B 80 A 60 B
40 40 40 40 40 40 40 40
III 1,40 1,40 1,40 1,40 1,40 1,40 1,40 1,40
60 A 60 A 60 A 60 A 60 A 60 B 60 A 60 B

Legend:
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
B = invisible fixing on intermediate support with two fixings and two supporting elements as per Trimo details (only in the edge area).
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

8
Load Span Table for Panels Trimoterm FTV Hss 80 (FTV Hms 80), tN = 0,60 / 0,60 mm with
A and B types of fixing
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 44 40 49 40 52 40
I 5,66 4,14 4,60 2,64 4,01 1,96 3,55 1,68
67 A 61 B 83 A 66 B 98 A 71 B 104 A 73 B
40 40 40 40 40 40 45 40
Double-
II 3,35 3,24 3,29 2,63 3,10 1,96 2,99 1,68
spansupport
60 A 61 B 71 A 66 B 85 A 71 B 93 A 69 B
40 40 40 40 40 40 40 40
III 1,33 1,86 1,33 1,86 1,33 1,73 1,33 1,60
60 A 60 B 60 A 64 B 69 A 68 B 65 A 71 B
41 40 47 40 55 40 57 40
I, 6,55 4,64 5,19 2,91 4,42 2,13 3,93 1,81
73 A 60 B 93 A 60 B 109 A 60 B 114 A 60 B
40 40 44 40 49 40 54 40
Triple-span
II 5,45 4,29 4,49 1,91 3,96 2,13 3,71 1,81
support
66 A 60 B 80 A 60 B 97 A 60 B 108 A 60 B
40 40 40 40 40 40 40 40
III 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
60 A 60 B 60 A 60 B 60 A 60 B 60 A 60 B

Building height /width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 41 60 41 40 41 40
I 5,25 4,14 4,12 2,64 3,30 1,96 2,81 1,68
66 A 61 B 77 A 66 B 88 A 71 B 91 A 73 B
40 40 40 40 40 40 41 40
Double-
II 3,34 3,01 3,08 2,63 2,77 1,96 2,40 1,68
spansupport
61 A 61 B 69 A 66 B 81 A 71 B 84 A 69 B
40 40 40 40 40 40 40 40
III 1,33 1,86 1,33 1,86 1,33 1,73 1,33 1,60
60 A 60 B 60 A 64 B 61 A 68 B 65 A 71 B
41 40 46 40 45 40 45 40
I, 6,55 4,64 4,76 2,91 3,67 2,13 3,11 1,81
73 A 60 B 85 A 60 B 90 A 60 B 90 A 60 B
40 40 41 40 45 40 43 40
Triple-span
II 4,74 4,29 3,93 2,91 3,30 2,13 2,93 1,81
support
61 A 60 B 71 A 60 B 81 A 60 B 85 A 60 B
40 40 40 40 40 40 40 40
III 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,61
60 A 60 A 60 A 60 B 60 A 60 B 60 A 60 B

Legend:
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
B = invisible fixing on intermediate support with two fixings and two supporting elements as per Trimo details (only in the edge area).
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

9
Load Span Table for Panels Trimoterm FTV Hss 100 (FTV Hms 100),tN = 0,60 / 0,60 mm
with A and B types of fixing
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width= h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 47 40 56 40 57 40
I 6,49 4,16 5,27 2,66 4,58 1,98 3,90 1,70
74 A 62 B 94 A 71 B 112 A 76 B 114 A 78 B
40 40 40 40 44 40 50 40
Double-
II 3,94 3,92 3,82 2,66 3,58 1,98 3,45 1,70
spansuppor
61 A 61 B 80 A 71 B 96 A 76 B 106 A 78 B
40 40 40 40 40 40 40 40
III 1,08 2,14 1,08 2,14 1,08 1,88 1,08 1,61
60 A 60 B 60 A 68 B 60 A 75 B 63 A 76 B
42 40 53 40 62 40 63 40
I 7,44 4,64 5,89 2,92 5,02 2,13 4,35 1,81
83 A 60 B 105 A 60 B 123 A 60 B 126 A 60 B
40 40 47 40 57 40 63 40
Triple-span
II 6,38 4,64 5,23 2,92 4,60 2,13 4,31 1,81
support
71 A 60 B 93 A 60 B 113 A 60 B 125 A 60 B
40 40 40 40 40 40 40 40
III 1,94 1,94 1,94 1,94 1,94 1,94 1,94 1,81
60 A 60 A 60 A 60 B 60 A 60 B 60 A 60 B

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 40 40 41 40 41 40
I 6,06 4,16 4,50 2,66 3,32 1,98 2,83 1,70
72 A 62 B 86 A 71 B 93 A 76 B 96 A 78 B
40 40 40 40 40 40 42 40
Double-
II 3,92 3,92 3,56 2,66 3,10 1,98 2,43 1,70
spansuppor
61 61 B 78 A 71 B 90 A 76 B 90 A 78 B
40 40 40 40 40 40 40 40
III 1,08 2,14 1,08 2,14 1,08 1,88 1,08 1,61
60 A 60 B 60 A 68 B 60 A 75 B 63 A 76 B
42 40 45 40 45 40 45 40
I 7,44 4,64 5,04 2,92 3,67 2,13 3,11 1,81
83 A 60 B 90 A 60 B 90 A 60 B 90 A 60 B
40 40 41 40 45 40 45 40
Triple-span
II 5,53 4,64 4,57 2,92 3,67 2,13 3,11 1,81
support
62 A 60 B 82 A 60 B 90 A 60 B 90 A 60 B
40 40 40 40 40 40 40 40
III 1,94 1,94 1,94 1,94 1,94 1,94 1,94 1,81
60 A 60 A 60 A 60 B 60 A 60 B 60 A 60 B

Legend:
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
B = invisible fixing on intermediate support with two fixings and two supporting elements as per Trimo details (only in the edge area).
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

10
Load Span Table for Panels Trimoterm FTV Hss 120 (FTV Hms 120), tN = 0,60 / 0,60 mm
with A and B types of fixing
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width= h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
41 40 51 52 56 40 57 40
I 6,94 4,18 5,65 2,68 4,60 2,00 3,92 1,72
80 A 66 B 102 A 75 B 116 A 80 B 118 A 81 B
40 40 40 40 42 40 50 40
Double-
II 4,08 4,04 4,01 2,68 3,52 2,00 3,11 1,72
spansuppor
64 A 65 B 84 A 75 B 100 A 80 B 110 A 81 B
40 40 40 40 40 40 40 40
III 1,04 2,29 1,04 2,16 1,04 1,80 1,04 1,57
60 A 63 B 60 A 72 B 70 A 76 B 62 A 77 B
45 40 57 40 67 40 70 40
I 8,04 4,65 6,35 2,92 5,07 2,14 4,35 1,81
90 A 60 B 113 A 60 B 124 A 61 B 126 A 62 B
40 40 40 40 59 40 63 40
Triple-span
II 6,60 4,65 5,45 2,92 4,81 2,14 4,33 1,81
support
73 A 60 B 97 A 60 B 118 A 61 B 125 A 62 B
40 40 40 40 40 40 41 42
III 2,05 2,05 2,05 2,05 2,05 2,05 2,05 1,81
60 A 60 A 60 A 60 B 61 A 61 B 64 A 62 B

Building height / width= h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 43 40 41 40 41 40
I 6,42 4,18 4,52 2,68 3,26 2,00 2,74 1,72
77 A 66 B 90 A 75 B 96 A 80 B 98 A 81 B
40 40 40 40 41 40 45 40
Double-
II 4,07 3,64 3,46 2,68 2,72 2,00 2,21 1,72
spansuppor
65 65 B 82 A 75 B 96 A 80 B 110 A 81 B
40 40 40 40 40 40 40 40
III 1,04 2,29 1,04 2,16 1,04 1,80 1,04 1,57
60 A 63 B 60 A 72 B 60 A 76 B 62 A 77 B
43 40 45 40 45 40 45 40
I 7,69 4,65 5,04 2,92 3,67 2,14 3,12 1,81
86 A 60 B 90 A 60 B 90 A 61 B 90 A 62 B
40 40 43 40 45 40 45 40
Triple-span
II 5,75 4,65 4,76 2,92 3,67 2,14 3,12 1,81
support
64 A 60 B 85 A 60 B 90 A 61 B 90 A 62 B
40 40 40 40 40 40 41 42
III 2,05 2,05 2,05 2,05 2,05 2,02 2,05 1,81
60 A 60 A 60 A 60 B 60 A 60 B 64 A 62 B

Legend:
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
B = invisible fixing on intermediate support with two fixings and two supporting elements as per Trimo details (only in the edge area).
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

11
Load Span Table for Panels Trimoterm FTV Hss 150 (FTV Hms 150), tN = 0,60 / 0,60 mm
with A and B types of fixing
Span distances are stated further on are proved in accordance with Sales Certificate No. Z-10.4-240 of 20 August 2001
for the least favourable load combinations of wind and temperature. Instructions for table use - see explanations and
example of reading on page 2.

Building height / width = h / a ≤ 0,25


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
43 40 56 40 57 40 57 40
I 7,61 4,21 6,23 2,72 4,63 2,03 3,95 1,75
88 A 72 B 113 A 81 B 121 A 85 B 124 A 85 B
40 40 40 40 44 40 51 40
Double-
II 4,30 4,21 4,30 2,72 3,42 2,03 2,60 1,75
spansuppor
71 A 72 B 89 A 81 B 106 A 85 B 117 A 85 B
40 40 40 40 40 40 40 40
III 0,98 2,52 0,98 2,19 0,98 1,68 0,98 1,50
60 A 67 B 60 A 77 B 60 A 78 B 60 A 79 B
50 40 63 40 74 40 80 40
I 8,93 4,66 7,05 2,93 5,14 2,15 4,36 1,82
100 A 60 B 126 A 60 B 126 A 62 B 126 A 64 B
40 40 52 40 63 40 63 40
Triple-span
II 6,92 4,66 5,77 2,93 5,13 2,15 4,36 1,82
support
77 A 60 B 103 A 60 B 126 A 62 B 126 A 64 B
40 40 40 41 41 40 43 44
III 2,21 2,21 2,21 2,21 2,21 2,15 2,21 1,82
60 A 60 A 60 A 60 B 63 A 62 B 69 A 64 B

Building height / width = h / a ≥ 0,50


Static Colour 0 ÷ 8 m 1) 8 ÷ 20 m 1) 20 ÷ 100 m 1) over 100 m 1)
system group 0,50 (kN/m2) 3) 0,80 (kN/m2) 3) 1,10 (kN/m2) 3) 1,30 (kN/m2) 3)
NB 2) RB 2) NB 2) RB 2) NB 2) RB 2) NB 2) RB 2)
40 40 41 40 40 40 40 40
I 6,95 4,21 4,55 2,72 3,18 2,03 2,61 1,75
84 A 72 B 96 A 81 B 101 A 85 B 102 A 85 B
40 40 40 40 42 40 49 40
Double-
II 4,30 4,21 3,30 2,72 2,16 2,03 1,88 1,75
spansuppor
70 72 B 88 A 81 B 104 A 85 B 114 A 85 B
40 40 40 40 40 40 40 40
III 0,98 2,52 0,98 2,19 0,98 1,68 0,98 1,50
60 A 67 B 60 A 77 B 60 A 78 B 60 A 79 B
45 40 45 40 45 40 46 40
I 8,06 4,66 5,05 2,93 3,68 2,15 3,13 1,82
90 A 60 B 90 A 60 B 90 A 62 B 91 A 64 B
40 40 45 40 45 40 46 40
Triple-span
II 6,07 4,66 5,05 2,93 3,68 2,15 3,13 1,82
support
68 A 60 B 90 A 60 B 90 A 62 B 91 A 64 B
40 40 40 41 41 40 43 44
III 2,21 2,21 2,21 2,21 2,21 2,15 2,21 1,82
60 A 60 A 60 A 60 B 63 A 62 B 69 A 64 B

Legend:
A = invisible fixing on intermediate support with one fixing and one supporting element as per Trimo details.
B = invisible fixing on intermediate support with two fixings and two supporting elements as per Trimo details (only in the edge area).
Tearing from a sub-structure should be verified for each case separately.
Direct fixing on end supports should be verified for each individual case.

1) Height of buildiing above the ground.


2) Panel placement - with respect to are of wind suction; NB = normal area, RB = edge area (normal width: 2.0 m) on corners of a building.
3) Wind load is in accordance with DIN 1055 (national regulations are to be considered in individual countries).

12
Colour groups

RAL Colour shade Colour group RAL Colour shade Colour group
9010 pure white 2002 carmine red
9001 cream white 6010 grass green
1013 pearl white 8025 pale brown
1015 light ivory 8004 copper brown
9002 grey white I. 5007 brilliant blue
1018 zinc yellow 6001 emerald green
1016 sulphur yellow 9000 fire red
7035 light grey 6002 leaf red
3002 karmin red
1001 beige
6003 olive green
1002 sand yellow
3009 oxide red
7038 agate grey
5009 sky blue
7032 kcream grey
7015 slate grey
9006 white aluminium
8007 deer brown
1007 chromium yellow
7013 brown grey
1024 ochre yellow
5010 gentian blue
2003 pastel orange
8011 walnut brown III.
3021 pale green moor green
6005
1020 olive yellow anthracite grey
7016
7001 silver grey scarlet red
3004
2000 yellow orange ultramarine blue
5002
6018 yellow green II. sepia brown
8014
7002 olive grey mahogany brown
8016
6011 reseda green brown green
6008
5012 light blue kcobalt blue
5013
2004 pure orange steel grey
7011
8003 orange brown
2001 red orange
9007 grey aluminium
5014 pigeon blue
5023 sky blue
5024 pastel blue
7037 dusty grey

Wind load in accordance with DIN 1055, Edition 8.86


Height above the ground (m) 0 ... 8 > 8 ... 20 > 20 ... 100
Form of a building h/a < 0,25 > 0,50 < 0,25 > 0,50 < 0,25 > 0,50

Closed buildings
Wind pressure (kN/m2) 0,50 0,50 0,80 0,80 1,10 1,10
2
Wind suction (kN/m ) 0,25 0,35 0,40 0,56 0,55 0,77

Buildings with open sides


Wind pressure (kN/m2) 0,75 0,75 1,20 1,20 1,65 1,65
2
Wind suction (kN/m ) 0,75 0,75 1,20 1,36 1,65 1,87

13
Published by: TRIMO d.d., Design: Meta Gabrijel, Photography: Janez Erjavec, Printed by: Tiskarna Petrič, Circulation: 4500, 12/2004,