SATIP-P-104-02 Rev 7 Final

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Medium Voltage Cable and Conductors (1.001 kV to 35 kV) SATIP-P-104-02 30-Apr-13 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Cable Termination and Splicing


To be reviewed and approved prior to MV electrical work
1.1 Special Work Procedure SAIC-P-3210 SAIC-P-3210 RH1 RH1 at job site
Document Review

Cable Splicer Certification and Job Clearance Cards (JCC's) to be issued prior to
1.2
Project Job Clearance Cards
SAIC-P-3210 SAIC-P-3210 RH1 RH1 commencement of MV cable termination work.

Cables and Conduits Special Procedure To be reviewed and approved prior to electrical work at
1.3
Document Review
SAIC-P-3004 SAIC-P-3004 RH1 RH1 job site

RECEIVING
2.0
INSPECTION

Cable Storage, Handling,


2.1 and Preservation SAIC-P-3201 SAIC-P-3201 H1 W1 Weekly Inspection by Contractor QC
Visual Inspection

Cable Reel
2.2 Material Receiving SAIC-P-3211 SAIC-P-3211 H1 H1 See GENERAL NOTES for typical accessories.
Visual Inspection for UL / NEC MV Cable

Cable Reel
2.3 Material Receiving SAIC-P-3212 SAIC-P-3212 H1 H1 See GENERAL NOTES for typical accessories.
Visual Inspection for IEC MV Cable

Cable Material Receiving


Continuity (Volt-Ohm Meter) and Insulation (Megger)
2.4 Continuity and Insulation SATR-P-3207 SATR-P-3207 H1 W1 Testing.
Testing (On Cable Reel)

3.0 INSTALLATION

Direct Buried
Cable Trench See SATIP-P-104-07 Below Grade Conduit and Duct
3.1
Visual Inspection
SAIC-P-3333 SAIC-P-3333 H1 W1 Bank.
(Before Cable Laying)

Page 1 of 3
03/09/2022 3:34 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Medium Voltage Cable and Conductors (1.001 kV to 35 kV) SATIP-P-104-02 30-Apr-13 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Cable laying method shall be in compliance with


Cable Pulling
3.2
Visual Inspection
SAIC-P-3214 SAIC-P-3214 H1 W2 manufacturer's instructions.
See also SATIP-P-111-01 Grounding and Bonding

Below Grade Cable Laying


SA PID shall be notified on start of this activity for each
3.3 Visual Inspection For MV Cable, SAIC-P-3214 SAIC-P-3214 H1 W1 MV circuit.
Identification, and Backfilling

Below Grade SA PID hold point for all direct buried MV cables prior to
3.4 Warning Device Installation SAIC-P-3333 SAIC-P-3333 H1 W1 backfilling of cable and electrical safety warning devices
Visual Inspection (e.g., tape).

Cable dressing and termination work (inside cabinet)


shall not proceed until cable route and cable dressing in
Cable Gland Installation, Cable Dressing,
tray has been inspected by Contractor QC.
3.5 Cable Identification, and Termination SAIC-P-3214 SAIC-P-3214 H1 W2
Visual Inspection
SA PID shall be notified on start of this activity for each
MV circuit.

4.0 PRE-COMMISSIONING

Cable Continuity
Continuity (Volt-Ohm Meter) and
4.1 and Insulation Testing SATR-P-3208 SATR-P-3208 H1 W2 Insulation (Megger) Test.
(Installed Cable)

MV Cable Hi-Pot Cable Insulation


4.2 High-Potential SATR-P-3210 SATR-P-3210 H1 H1 If direct buried, perform conductor insulation test before
Withstand Testing backfilling.

Cable Termination
4.3
Torque Testing
SATR-P-3209 SATR-P-3209 H1 W2 Hydraulic and mechanical crimping / bolting

Cable/ Gland / Conduit


4.4
Hazardous Location Sealing
SAIC-P-3209 SAIC-P-3209 H1 H1 SA PID shall be notified on start of this activity.

Cable
4.5 Final Visual Inspection SAIC-P-3214 EIL H1 H1 Hold Point for Energization of each MV Circuit.
(before energization certificate)

Page 2 of 3
03/09/2022 3:34 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Medium Voltage Cable and Conductors (1.001 kV to 35 kV) SATIP-P-104-02 30-Apr-13 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4
attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Cable accessories include cable pulling lubricant; cable gland connector fittings, hot and cold shrink insulation tubing; electrical tape; cable straps and ties; cable markers, crimp wire connectors; MV
6 cable termination kits; bulk terminal blocks and points; bulk electrical nuts, bolts and washers; crimping tools & dies; weather-proof cable and duct seal, hazardous location damming fiber and cement.
Notify SA PID by RFI on initial receipt of each listed accessory (by type and/or manufacturer).

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 Sample Review of Documents S Surveillance

Page 3 of 3
03/09/2022 3:34 PM

You might also like