SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
Not Applicable
RECEIVING
2.0
INSPECTION
Storage, Handling,
and Preservation
2.1
Electronic Equipment
SAIC-P-3002 SAIC-P-3002 I S Weekly Inspection by Contractor QC.
Visual Inspection
Page 1 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
3.0 INSTALLATION
Equipment / Cabinet
Installation and Identification
SATIP-P-111-01 Grounding and Bonding
3.2 Visual Inspection for Protection & SAIC-P-3809 SAIC-P-3809 H W SATIP-P-111-02 Sensitive Equipment Grounding
Metering - Equipment Installation and Pre-
Commissioning
Equipment / Cabinet
Installation and Identification
SATIP-P-111-01 Grounding and Bonding
3.3 Visual Inspection for Protection & SAIC-P-3810 SAIC-P-3810 H W SATIP-P-111-02 Sensitive Equipment Grounding
Metering - CT and PT Installation and Pre-
Commissioning
Equipment / Cabinet
Installation and Identification
SATIP-P-111-01 Grounding and Bonding
3.4 Visual Inspection for Protection & SAIC-P-3811 SAIC-P-3811 H W SATIP-P-111-02 Sensitive Equipment Grounding
Metering - Relay Installation and Pre-
Commissioning
Equipment / Cabinet
Installation and Identification
SATIP-P-111-01 Grounding and Bonding
3.5 Visual Inspection for Protection & SAIC-P-3812 SAIC-P-3812 H W SATIP-P-111-02 Sensitive Equipment Grounding
Metering - Meter / Recorder Installation
and Pre-Commissioning
Page 2 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
4.0 PRE-COMMISSIONING
Cable Continuity
4.1 and Insulation Testing SATR-P-3203 SATR-P-3203 H W See SATIP-J-902-01 Metallic Inst. and Control Cable
(Installed Cable)
Cable Termination
4.3 Crimp (wire pull-out) and See Remarks See Remarks SATIP-J-902-01 Metallic Inst. and Control Cable
Torque Testing
Page 3 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
Page 4 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Page 5 of 6
03/09/2022 3:38 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD
SAUDI
CNTRCTR
ARAMCO
Accessories include DC power supplies, control power transformers, circuit breakers, fuses and fuse blocks, terminal blocks and points, interposing control relays, signal transducers, pilot lights, selector
6 switches, push-buttons, PT/CT circuit test switches, panel wiring, crimp connectors and tools, wire markers, and audible / visual alarms.
Notify SA PID by RFI on initial receipt of each listed accessory (by type and / or manufacturer).
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
Page 6 of 6
03/09/2022 3:38 PM