Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

ABB Lummus Global B.V./Petrofac International Ltd.

011 09789      

Dept./Sect. Project Document Number


09789,09789-WR-0805,-,0.B,1 TOS 47 - RAW WATER SYSTEM 09789
COMMISSIONING PROCEDURE 0

BHP Petroleum Pty Ltd.


THIS DOCUMENT/DRAWING IS THE PROPERTY OF ABB LUMMUS GLOBAL B. V. INCLUDING ALL PATENTED AND PATENTABLE FEATURES AND/OR CONFIDENTIAL INFORMATION AND ITS USE IS CONDITIONED UPON THE USER’S AGREEMENT NOT TO REPRODUCE

Ohanet, Algeria
THE DOCUMENT/DRAWING, IN WHOLE OR IN PART, NOR THE MATERIAL DESCRIBED THEREON, NOR TO USE THE DOCUMENT/DRAWING FOR ANY PURPOSE OTHER THAN AS SPECIFICALLY PERMITTED IN WRITING BY ABB LUMMUS GLOBAL B.V.

BHP Ohanet

     

     

     

TOS 47 - RAW WATER SYSTEM

COMMISSIONING PROCEDURE

                                   


                                   
0       FOR COMMENTS EMU EMU ME
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

LGV SREP 04-3001-02.500 (1999-11-20) 09789, “”


09789,09789-WR-0805,-,0.B,1 Page 1 of 4
ABB Lummus Global B.V./Petrofac International Ltd.

Client BHP Petroleum Pty Ltd. 011 09789       0

Subject TOS 47 - RAW WATER SYSTEM Dept./Sect. Project Document Number Rev.

1.0 INTRODUCTION

2.0 MECHANICAL PROCESS DESCRIPTION


2.1 BASIS OF DESIGN
2.2 SITE INFORMATION
2.3 UTILITY REQUIREMENTS

3.0 SAFETY

4.0 SUPERVISORY CONTROL AND OPERATING PHILOSOPHY


4.1 PURPOSE
4.2 PROCESS DESCRIPTION
4.3 NORMAL OPERATION
4.4 TEMPORARY OPERATION
4.5 EMERGENCY OPERATION

5.0 EMERGENCY SHUTDOWN SYSTEM

6.0 ESTIMATED PLANT UTILITIES

7.0 LIST OF INITIAL CHEMICAL CHARGE/CHEMICAL QUANTITIES

8.0 PRE-STARTUP AND OPERATING PROCEDURES


8.1 REMOTE PRODUCTION WELLHEADS AND ASSOCIATED EQUIPMENT
8.2 PRODUCTION WELLHEADS AND ASSOCIATED EQUIPMENT ON MANIFOLDS
8.3 OFFSITE MANIFOLDS WITH SPHERE LAUNCHERS AND ASSOCIATED EQUIPMENT
8.4 OFFSITE MANIFOLDS WITHOUT SPHERE LAUNCHERS
8.5 FLOWLINES AND TRUNKLINES
8.6 PLANT INLET FACILITIES
8.7 FEED GAS COMPRESSION
8.8 EXPORT GAS COMPRESSION
8.9 CO2 REMOVAL SYSTEM
8.10 AMINE REGENERATION SYSTEM
8.11 ANTIFOAM INJECTION PACKAGE
8.12 AMINE DRAIN SYSTEM
8.13 THERMAL OXIDIZER
8.14 INLET LIQUIDS SYSTEM
8.15 GAS INLET FACILITIES TRAIN 1
8.16 DEHYDRATION AND REGENERATION SYSTEM TRAIN 1
8.17 EXPANDER INLET SYSTEM TRAIN 1
8.18 EXPANDER COMPRESSOR SYSTEM TRAIN 1
8.19 COLD PLANT SYSTEM TRAIN 1
8.20 CONDENSATE STABILIZATION SYSTEM TRAIN 1
8.21 LPG SPLITTER SYSTEM TRAIN 1
8.22 GAS INLET FACILITIES TRAIN 2
8.23 DEHYDRATION AND REGENERATION SYSTEM TRAIN 2
8.24 EXPANDER INLET SYSTEM TRAIN 2
8.25 EXPANDER COMPRESSOR SYSTEM TRAIN 2
ABB Lummus Global B.V./Petrofac International Ltd.

Client BHP Petroleum Pty Ltd. 011 09789       0

Subject TOS 47 - RAW WATER SYSTEM Dept./Sect. Project Document Number Rev.

8.26 COLD PLANT SYSTEM TRAIN 2


8.27 CONDENSATE STABILIZATION SYSTEM TRAIN 2
8.28 LPG SPLITTER SYSTEM TRAIN 2
8.29 CONDENSATE TANKAGE AND EXPORT SYSTEM
8.30 LPG TANKAGE AND EXPORT SYSTEM
8.31 FUEL GAS SYSTEM
8.32 HOT OIL SYSTEM
8.33 HIGH PRESSURE FLARE SYSTEM UNIT 100
8.34 HIGH PRESSURE FLARE SYSTEM UNIT 200
8.35 LOW PRESSURE FLARE SYSTEM
8.36 COLD FLARE SYSTEM
8.37 BURN PIT SYSTEM
8.38 PRODUCED WATER HANDLING SYSTEM
8.39 SLOPS SYSTEM
8.40 HV POWER DISTRIBUTION
8.41 MV POWER DISTRIBUTION
8.42 UPS AND DISTRIBUTION
8.43 LV POWER DISTRIBUTION
8.44 EMERGENCY POWER GENERATION AND DISTRIBUTION SYSTEM
8.45 LIGHTING AND SMALL POWER DISTRIBUTION
8.46 ESD SYSTEM
8.47 DCS
8.48 RAW WATER SUPPLY SYSTEM
8.49 FIRE, GAS AND SMOKE DETECTION SYSTEM
8.50 FIRE WATER SYSTEM
8.51 FIRE FIGHTING AND SAFETY EQUIPMENT
8.52 INSTRUMENT AND PLANT AIR SYSTEM
8.53 DIESEL SYSTEM
8.54 NITROGEN SYSTEM
8.55 POTABLE WATER SYSTEM
8.56 DEMINERALIZED WATER SYSTEM
8.57 OPEN DRAINS SYSTEM
8.58 METHANOL INJECTION SYSTEM
8.59 CHEMICAL INJECTION SYSTEM
8.60 TELECOMMUNICATIONS PHONE AND SATELLITE SYSTEM
8.61 SITE RADIO
8.62 BASE DE VIE
8.63 BUILDINGS IN THE INDUSTRIAL BASE
8.64 BUILDINGS IN THE CENTRAL PROCESSING FACILITY

9.0 FACILITY PURGE & PRESSURIZING PROCEDURE

10.0 ALARM & SHUTDOWN LISTING

11.0 SHUTDOWN LOGIC CAUSE AND EFFECT

12.0 PLOT PLAN


ABB Lummus Global B.V./Petrofac International Ltd.

Client BHP Petroleum Pty Ltd. 011 09789       0

Subject TOS 47 - RAW WATER SYSTEM Dept./Sect. Project Document Number Rev.

13.0 HEAT AND MATERIAL BALANCE

14.0 PROCESS FLOW DIAGRAMS

15.0 PROCESS AND INSTRUMENT DIAGRAMS

16.0 TRAINING PROGRAM