Planning, Commissioning and Maintenance

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Planning&Commissioning

DELIVERY TYPE

Instructor-Led
20 working Days

DESCRIPTION

This is a typical and Installation, Commissioning and Maintenance training course based on the
project made up of:
1350OMS System, DWDM with OTS, PSS36/64 and PSS 4.

COURSE OBJECTIVE

By the end of the course, participants will be able to:


Test all components of the project
Operate a network and modify it
Create and manage services across the network
Perform the activities of maintenance and troubleshooting of the NEs

COURSE CONTENT

Basic Planning Concepts

 Basics information
 Requirements
 Network Planning Concept
 DWDM Network General Function
 Power Budget Calculation
 Protection selections

Project and Equipment overview

Network topology, OTN and OTG/OTH principles


 OTN introduction
 OTN network concept
 OTH Layers and functions
 Multiplexing and mapping
 Frame and overhead
 Tandem Connection Monitoring (TCM)
 Forward Error Correction (FEC)
 SDH general overview
 Maintenance aspects overview


Project Network Elements

1350OMS-EML/NML Operator
 Login and start with the 1350 OMS,
 navigate the Graphical User Interfaces,
 upload in the system database the NEs deployed in the network,
 Open the supervision on NE
 manage the network map
 perform the main provisioning and commissioning procedures for the networks
 perform the backup & restore of the NE database,
 perform a set of NE management operations
 browse the operation log
 Manage the Alarm Surveillance application for monitoring the current and the historical
alarms
 manage the transmission quality records.
 Manage ASON/MPLS Restoration
 Setup Paths/Trails,
 Navigate into the Web Portal
 Navigate the Multi-Service Graphical User Interface

OTS commissioning & Maintenance theory


 Equipment Overview
 General description
 Installation basics
 Boards Description
 Remote inventory
 Protection Principle
 DC Power up
 Optical Power test
 Network Management connection
 Physical Connections
 Path and Trail Concepts
 Wavelength Tracker
 Link and Cross Connections
 Performance Monitoring
 Alarms concepts
 NDT description

GMRE/GMPLS O&M
 MPLS evolution to GMPLS,
 GMRE evolution for photonic WDM networks,
 manage the WDM_ASON NPA,
 manage ODU Trails and get relevant information,
 manage restoration within WDM_ASON network,
 execute maintenance operations on WDM_ASON network
 describe the GMRE CLI context and get started on it
 handle basic GMRE CLI commands.

1830 Photonic Service Switch 4 (PSS-4) R6.0 I&C&M Theory


 1830 PSS-4 edge device
 Installation Basics
 topology and system architecture of the 1830 PSS-4
 Remote inventory
 Eqpt and system provisioning,
 maintenance and alarm clearing procedures

1830 PSS-36/64 Photonic Service Switch - 36/64 R6.0 O&M


 1830 PSS-36/64 device
 Installation Basics
 topology and system architecture of the 1830 PSS-36/64
 Remote inventory
 Eqpt and system provisioning,
 Cross connection management
 Maintenance and alarm clearing procedures

Practicing in the Lab

NEs Provisioning
 ZIC start-UP
 Equipment Line Up
 Eqpt and system provisioning,
 declare and remove in the NE database a channel
 configure optical channels to complete the NE configuration
 monitor and tune the optical power levels
 manage the WDM_ASON NPA
 manage ODU Trails and get relevant information
 manage restoration within WDM_ASON network
 execute maintenance operations on WDM_ASON network
NEs Commissioning

 Database and Software Management


 Equipment Test and Reboot Management
 Maintenance operations on WDM_ASON Network
 Board Replacement
 maintenance and alarm clearing procedures
Audience:
The course is designed for people in charge of operation and Maintenance

Knowledge:
Skill in NMS, DWDM and SDH Alcatel-Lucent technology

You might also like