Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Operation

17.2 Ring-main and circuit-breaker panels: Operating the three-position switch


Connecting the feeder to the busbar:

NH
Initial situation: Control gate in Push the control gate to the left. Insert the operating lever and turn Remove the operating lever.
OPEN position, actuating opening The actuating opening is released. counter-clockwise to Iposition The control gate returns to
closed (three-position switch OPEN, (CLOSED). The feeder is connected its initial position.
earthing switch OPEN) with the busbar.

Disconnecting the feeder from the busbar:

Initial situation: Control gate in Push the control gate to the left. Insert the operating lever and turn Remove the operating lever.
OPEN position, actuating opening The actuating opening is released. clockwise to 0 position (OPEN). The control gate returns to
closed (three-position switch
The feeder is disconnected from ts initial position.
CLOSED, earthing switch OPEN)
the busbar.

Feeder earthing:

H
Initial situation: Control gate in Push the control gate to the right. Insert the
OPEN position, actuating opening
operating lever and turn Remove the operating lever.
The actuating opening is isolated. clockwise to EARTHED
closed (three-position switch OPEN, position. The control gate returns to
The feeder is earthed. its initial position.
earthing switch OPEN)

Feeder de-earthing:

IH
Initial situation: Control gate in Push the control gate to the right. Insert the operating lever and turn Remove the
OPEN position, actuating opening The actuating opening is released. operating lever
counter-clockwise DE-EARTHED
to The control gate returns to
closed (three-position switch OPEN,
position. The feeder is de-earthed. its initial position.
earthing switch CLOSED)

98/112 Revision 02 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST 502-8337.9


Operation

18.1 Closing the circuit-breaker"locally


How to close the circuit-breaker depends on the equipment of the
switchgear panel.
switchgear
There are two versions of circuit-breaker operating mechanisms:
Stored-energy spring mechanism
Stored-energy spring mechanism with motor (option)

Closing with stored- Make sure that the closing and opening springs of the stored-energy mechanicm
energy mechanism are charged.

W*

Actuate the "ON" pushbutton.


The position indicator of the circuit-breaker in the mimic diagram is in CLOSED position

VThe circuit-breaker is closed.

18.2 Opening the circuit-breaker "locally"


Actuate the "OFF" pushbutton.

The position indicator ofthe circuit-breaker in the mimic diagram is in OPEN position.

100/112 Revision 02 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST 50285


Operation

18.3
Charging the
During manual operationspring
or if
energy store manually
tE
the auxiliary mechanism),
dutomatically af must be char (motO operatingsprings are charged
àry voltage fails (motor
ening springs a
PPlying control ally. The closing and opening
Auxiliary means required:
The
Operating lever.
opening for the
operating lever is located
top-left at the cono

Fig. 117: Standard:


Single-lever operation with coding as universal lever
Open the locking device.
Insert the operating lever.
Turn the
operating lever approx. 70° clockwise until
in the
inspection window. the "spring charged" indication
appea

H.

Remove the operating lever.


T h e control gate moves to the center position automatically. The actuating opening is
closed.
The closing and opening springs of the circuit-breaker are charged. The circuit-breaker can
be closed and opened again.

337.c 101/112
oA.
ATON AND OPERATING INSTRUCTIONS 8DJH ST Revision 02
Operation
in the circuit-breaker pana
18.4 Closing the three-position
switch-disconnector panel

ATTENTION!
Please do absolutely observe the following:

A The service life of the circuit-breaker panel


max.

Switching operations of the switching


andsee page 29, "Three-position
device
depends on the permissible number os
used (see page 29,
switch-disconnector .

downwards.
Vacuum circuit-breab
ker"

P u s h the control gate of the switch-disconnector is free.


switch-disconnector
The actuating opening for the

w
O

switch-disconnector is closed.
I n s e r t the operating lever and turn clockwise. The

ww

Remove the operating lever.

Revision 02 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST 5028351"


102/112 N-83
Operation

n e control gate of the switch-disconnector moves to the center position automaticduy

The actuating opening is closed.

18.5 Opening the three-position switch-disconnector in the circuit-breaker panel

ATTENTION!
Please do absolutely observe the following:

A T h e max. service life of the circuit-breaker panel depends on the permissible number of
switching operations of the switching device used (see page 29, "Vacuum circuit-breaker
andsee page 29, "Three-position switch-disconnector ").
Push the control gate of the switch-disconnector downwards.
The actuating opening for the switch-disconnector is free.

%8337 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST Revision 02 103/112


Operation
Insert the operating lever and turn counter-clockwise. The switch-disconnectoriso
open

Remove the operating lever.


moves to the center position automatirall.
switch-disconnector
T h e control gate of the
The actuating opening is closed.

18.6 Three-position switch-disconnector in the circuit-breaker panel:


EARTHED position
Push the control gate of the switch-disconnector upwards. The actuating opening is free.

104/112 Revision 02 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST 502-8551


Operation

insert the arthed.


operating lever and turn counter-clockwise. The circuit-Dreaker pa

ww

Remove the operating lever.


T h e control gate moves to the center
position automatically.
The actuating opening is closed.

18.7 Three-position switch-disconnector in the circuit-breaker panel:


Deactivating the EARTHED position
Push the control gate ofthe switch-disconnector upwards.
The actuating opening for the earthing switch is free.

8337.9 INSTALLATION AND OPERATING INSTRUCTIONS 8DJH ST Revision 02 105/112


Operation
it-breaker
Insert the operating lever and turn clockwise. Ihe circuit-breaker panel isis de.
panel
de-earthed

Remove the operating lever.

center position automatically.


The control gate moves to the
The actuating opening is closed.

ww

T h e circuit-breaker is open.

8337
106/112 Revision 02 INSTALLATION AND OPERATING INSTRUCTIONS SDJHST 50: SDIH
Operation

19 Verification of safe isolation from supPy

DANGER!
Mortal danger if safe isolation from supply is verified incorrectly!

A Verify the perfect function of the voltage indicator and the coupling section in accordance
with national standards
-on liveequipment
-

with a test unit according to IEC 61243-5/EN 61243-5


on all poles

Use only voltageindicators or devices according to EN 61 243-5/IEC 61 243-5


VDE 0682-415 to test the function of the coupling section. (The interface conditions have
not changed as against the old standard VDE 0681 Part 7; the corresponding indicators can
still be used.)
Perform repeat test of interface conditions at the capacitive interfaces, as well as on the
indicators according to the customer's specifications or national standards.
D o not use short-circuiting jumpers as separate plugs. The function of the surge arrester
installed is not guaranteed anymore if short-circuiting jumpers are used
(see page 23, "Voltage detectingsystems)
Safe isolation from supply can be verified either with an HR or LRM voltage indicator or

with a CAPDIS system.

HR/LRM system
Documentation to repeat test of interface
condition

Voltage indicator type HR, make Horstmann


Capacitive test socket for L2

Earth socket

Cover for test sockets


L1

of the capacitive interface.


Remove the cover

Insert indicators in the test sockets


voltage capacitive interface. If the indicator does
of the
not flash or light up in any case,
the feeder is not live. The feeder can be earthed.
feeder is live.
If the indicator flashes or lights up, the
interfaces to protect them from pollution.
R e f i t the covers of the capacitive

INSTRUCTIONS 8DJH ST Revision 02 107/112


02-8337.9 INSTALLATION AND OPERATING

You might also like