Professional Documents
Culture Documents
Daily Report
Daily Report
Materials on site:
-
Works delayed beyond our control: Boundary wall and Service blocks
General comments: -
Signature Signature
*Casting Concrete for Pipes protection.
* Backfilling for 7th & 8th Layer. * Compaction for the last layer(Pile Cap level).