Hsnl-Eng (Coinco-703)
Hsnl-Eng (Coinco-703)
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
TABLE OF CONTENTS
1. GENERAL INFORMATION
3. FINANCIAL CAPACITY
4. ORGANIZATIONAL CHART
5. COMPANY RESOURCES
1. GENERAL INFORMATION
1.1 Name of Company
- The full name: 703 CONSTRUCTION AND INVESTMENT J.S.C (COINCO 703)
- Logo:
Business licence No. 0101387113 dated 04/07/2003, and change time 12th dated November
23rd, 2018 isued by Planing and Investment Division of Hanoi People Committee.
1.4 Main line Activited
FINANCIAL CAPACITY
MANAGEMENT
BOARD
GENERAL DIRECTOR
ON
703.INVESTMENT JOINT STOCK
GER L MANAGER
OF ASPHALT VIETNAM J.S.C
DIVISION
CONSTRUCTION TRANSPORT
EQUIPMENT WORKSHOP
CONSTRUCTION TEAMS
COMPANY
MATERIALS
TEAM
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
2. Board of Director
Mr: Trieu Hong Tuyen
Position: General Director Qualification: Engineer
5. HUMAN RESOURCE
5.1. Engineer and Colleges
WORKING YEARS
NO. PROFESSIONAL STAFF QUANTITY OVER 5 OVER 10 OVER 15 NOTE
YEARS YEARS YEARS
I Over University Level
1 Road and brigde engineers 34 16 08 10
Construction economic
2 05 01 02 02
engineers
3 Civil engineers 10 05 03 02
4 Mechanical engineers 09 03 04 02
5 Irrigation engineers 10 05 04 01
6 Electrical engineers 07 05 02
II College Level
1 Transport college 15 06 05 04
2 Civil college 03 02 01
3 Economic college 05 03 02
Total 98 44 32 22
Technical Workers
LEVEL HIGH
NO. WORKER LEVEL QUANTITY
3/7 4/7 5/7 LEVEL
Operation of plant
1 30 15 16 09
workers
2 Driving workers 11 02 07 02
3 Driving machine workers 35 10 16 09
4 Road workers 140 36 59 45
5 Brigde workers 45 18 15 12
Mechanicals of machinery
6 05 02 01 02
and equipment
Total 266 83 114 79
1 2 3 4 5 6 7
Package 6, Expandse
NH1A, Km1051+845 –
November January
Km1055+280 Section, 116,891 70,134 PMU 85 VN
2018 2020
Quang Ngai Province
Project.
Constructing infrastructure
for children toys factory Dream Plastic
Nam Dinh JY Plastic at March November Nam Dinh
Hai Phuong commune, Hai 51,480 51,480 KOREA
2017 2017 Company
Hau ward, Nam Định
province. Contract number Limited
93/2017/703-JY.PLATIC
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Construction of
infrastructure and factory Dream Plastic
factory Dream Plastic Nam December November Nam Dinh
64,455 64,455 KOREA
Dinh. Contract number: 2016 2017 Company
171216 HĐKT/703- Limited
DREAM PLATIC
Pakage 3B The
construction Bac – Nam December March
17,437 17,437 Nhan Binh VN
Expressway project (from 2016 2017
Đa Nang to Quang Ngai)
Pakage 02 Section Km 8 –
Km 16+880 The
September April
construction Bac – Nam 2,431,586 348,688 VEC VN
2013 2017
Expressway project (from
Đa Nang to Quang Ngai)
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Construction upgrading
provincial roads 202 (Ca
October October PMU Cao
Thanh-Lung Pan-Ban 78,080 23,761 VN
2013 2015 Bang
Rien) Cao Bang, of course
Km15+00-Km23+00
Concrete construction
grade plastic polymers for
Package 2: construction of July August Vinaconex
12,818 12,818 VN
roads and bridges south of 2014 2014 E&C
Construction Project Nhat
Tan Bridge
Construction package
XL.02, XL.03, XL.04
investment project November March Thang Long
75,553 75,553 VN
construction, expansion 2014 2015 Group
HW 1 Km1445-Km1488,
Khanh Hoa province
Execute Package 2:
Construction of the road August September
400,688 40,543 PMU 85 VN
and bridge Nhat Tan-Noi 2014 2014
Bai
Execute Package 1:
Construction of the bridge IHI infrasture
May August
and the North-bridge 10,208,847 49,697 System JAPAN
2014 2014
construction project Nhat Co.,Ltd
Tan Bridge
Package A5 Section Km
109+750 – Km 131+000
May September Keangnam
The construction Noi Bai – 1,974,676 489,802 KOREA
2013 2014 Enterprises
Lao Cai Expressway
project
Package 02 improvement
in damaged asphalt September January
4,936 3,752 PMU 2 VN
pavement Of the Thang 2012 2013
Long Bridge 2st
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Pakage 02 improvement in
damaged asphalt pavement September January
4,614 3,493 PMU 2 VN
Of the Thang Long Bridge 2012 2013
1st
Pakage 05 Construction
prestressed reinforcement
bridge Km 35+334 of the September September
16,000 16,000 PMU 1 VN
Road construction from 2012 2013
Quang Son to Don 9,
Daknong Province.
Pakage 01 improvement in
August September
damaged asphalt pavement 3,000 3,000 PMU 2 VN
2012 2012
Of the Thang Long Bridge
1 2 3 4 5 6 7
Package 3: Execution of
the road surface, drainage,
sidewalks, trees and hedge
work (Left side People's
Km1404.42 -Km2+ May November Committees
12,387 12,387 VN
703.91) in the project 2008 2010 communes
construction investment Phuc Yen
Nguyen Tat Thanh - Phuc
Yen Town (from NH-2 to
Xuan Hoa urban areas)
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package 7 section
Km07+00 - Km08+00 November September RPMU Ninh
11,834 11,834 VN
belong Ma Noi - Gia Hoa 2008 2010 Thuan
Road construction
Package 2: Km 71+500 -
Km 76 (Include
construction on the line)
Construction invesment
Project HW12, section Km March September
86,893 23,841 PMU 1 VN
66 - Km 102 ( include 2008 2010
Hang Tom bridge) in the
avoidance of flooding
when when there is Son La
hydropower (Subproject 1)
Packgae XL-04:
Construction section Km
181+00-Km191+837;
November September RPMU
Project: Improve HW18 107,755 75,482 VN
2008 2010 Quang Ninh
Mong Duong -Mong Cai
section, Quang Ninh
province
Package NPP-2/CP-29 of
the National Highway No.5
October August
Maintenance periodic at 27,257 27,257 RPMU2 VN
2008 2009
Hai Duong province
(section Km 47 - Km 55)
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 building, Ngo Thi Nham St., Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package: Embankment -
Pavament -Drainage
system Rehabilitation
project September June Vinacomin
12,462 7,027 VN
Under the Construction 2007 2008 PMU – TKV
road way from Uong Bi -
Vang Danh, section Cau
Trang-Vang Danh
Maintenance of NH. 1A -
Package 4. Improvement
May October
project of road network 34,900 29,013 VINACONEX VN
2006 2007
improvement, network
maintenance program
1 2 3 4 5 6 7
Road No.971
Rehabilitation Phu Ly - Ha December September Ha Nam
15,000 15,000 VN
Nam (Asphalt pavement), 2005 2006 PMU
Km0+00 -Km20+00
HW 6 - Package18,19
(Asphalt concrete December October
24,300 24,300 PMU 1 VN
pavement) 2003 2004