The document summarizes comments from a customer on a contractor's submittal for a project involving remote lounges. It notes several issues: 1) A reference to the wrong project in Section 1, 2) Missing data sheets and equipment schedules in Section 14, 3) Incomplete operation and maintenance guides in Sections 7-8. It requests the contractor address these comments, provide missing drawings and documentation in Sections 12, and add all missing sections listed in the original index. The contractor agrees to address the comments and notes responses have already been provided in the previous revision for most issues.
The document summarizes comments from a customer on a contractor's submittal for a project involving remote lounges. It notes several issues: 1) A reference to the wrong project in Section 1, 2) Missing data sheets and equipment schedules in Section 14, 3) Incomplete operation and maintenance guides in Sections 7-8. It requests the contractor address these comments, provide missing drawings and documentation in Sections 12, and add all missing sections listed in the original index. The contractor agrees to address the comments and notes responses have already been provided in the previous revision for most issues.
The document summarizes comments from a customer on a contractor's submittal for a project involving remote lounges. It notes several issues: 1) A reference to the wrong project in Section 1, 2) Missing data sheets and equipment schedules in Section 14, 3) Incomplete operation and maintenance guides in Sections 7-8. It requests the contractor address these comments, provide missing drawings and documentation in Sections 12, and add all missing sections listed in the original index. The contractor agrees to address the comments and notes responses have already been provided in the previous revision for most issues.
MISC-020 project at Al-Maktoum It’s already revised in 1 Comply Reply isn't clear to be accepted airport in the section#1 of the section 1 code 2 Rev 0. document Many items /materials are missing form Manufacturer lectures section, contractor shall provide complete data sheet for all items under the project Comply All the material items data scope including EMC2 Equipment Not complete, contractor to add 2 sheet already added in archive node and accessories, all used all products section 14 of Code 2 Rev0. mounting Kits and supports, Node Filler, Licenses, and contractor shall update the Equipment Schedules Section accordingly. Operation Sections shall include EMC2 storage node/unit’s operation /user It’s provided in section 7 3 guide (In addition to the Submitted Comply Comment is still valid of code2 Rev0. parts)
Maintenance Instruction System shall
It’s provided in section 8 include EMC2 storage node /units’ 4 Comment is still valid of code 2 Rev0. maintenance instructions guide (In Comply addition to the Submitted parts) In the name and index drawing section, It’s provided in section 12 5 drawing references to be provided Comply Not Done of code 2 Rev0.
Missing the Draft warrant section,