RFI

(STRUCTURAL) FOR THE PROPOSED REVAMPING


OF THE AGBADA WELL FOR HEIRS OIL & GAS
1. LOADING GANTRY
 Dimensions for proposed Loading gantry (Height, Truck spacing, Etc)
 Subsoil investigation Report
2. TEMPORARY STORAGE TANKS
 Dimensions of proposed Typical storage tank
 Operational load for storage tanks
3. PUMPS & POWER PACKS
 Plinth sizes for temporary Pump Stations & Power Plants
4. TEMPORARY OFFICE (PORTACABIN)
 Plinth size for Site Operations Temporary Structures (Offices)
5. PIPES & PIPERACK SUPPORTS
 Piping Engineers preferred pipe route and preferred pipe rack support spacing
 Sizes of pipes and pipe racks to be supported
6. STRENGTHENING OF STEEL STRUCTURES
 As-built drawings for steel structures requiring strengthening.

Prepared for HOG