Production and Procurement in Aviation/Aerospace Industry
MGMT 651
Author Note
Nikita C. Cruse, MGMT 651, Production and Procurement in Aviation/Aerospace Industry, Embry Riddle Aeronautical
University, Online
Correspondence concerning this article should be addressed to Nikita C. Cruse, Quality Tools, Embry Riddle Aeronautical
University, and 8786 Park Run Rd, San Diego, CA 92129. Phone: 817-505-3332 Email: nikitaj16@yahoo.com
Tools 2
Construct EACH of the following in a single document. Each tool should mirror a process in your workplace (it does not have to
be the same process for all these tools).
Ordering database was not available during off shift hours. Material ordered was too large to move without support of external agency
Tools 3
o
* #
Maintains
Initiates Release Energy to
Motor Pwr Spring Circuit Motor continues to run/ Built in Test
Switch Func Fails to open Failure None Relay Maintains Energy to Pwr circuit through Relay code 12 on Bit Display
Depleted Fails to
Provides Fails to provide Battery / operate
relay adequate shorted Battery gets hot relay Motor not running/ Built in Test code 2
Battery #2 voltage power contact or none circuit System fails to operate on BIT Display
Provides High
movemen current in
t to drive Fails to Motor Pwr
Motor shaft operate shorted Motor overheats Circuit Overheat/ Circuit Wire/ Circuit Breaker Visual /sound
Tools 6
Reference
Jacobs, R., & Chase, R. (2014). Operations and Supply Chain Management, (p. 163,164). McGraw-Hill Education