Professional Documents
Culture Documents
BACnet International Journal Issue 1
BACnet International Journal Issue 1
org
BACnet International
Journal
The BACnet magazine for building automation
in North America and the world
01
Smart Grid and BACnet 7
07/10
Wireless Towards LEED 15
Copyright Name:
© BACnet International 2010 – Further
editorial use of articles in the BACnet Company/Organization:
International Journal is encouraged (!)
Address:
with reference to the source. Please send
a specimen copy to the editor, or if pub- Postal Code:
lished online, send the URL per mail to
info@bacnetinternational.org City/State/Country:
Welcome to Our
BACnet International Journal!
It is with great pleasure that ing ever since. People and or the possibilities of BACnet success of BACnet around
I welcome you to the inau ganizations who have been and describing how users can the world. We want to en
gural edition of the BACnet actively engaged in the stan get maximum value from sure that all users and sup
International Journal. I have dards development activity BACnet – with both a North pliers are aware of the bene
spent most of my career have access to information American and a global view. fits BACnet can provide. We
working to promote, through a variety of formal We look forward to a Journ also want to ensure they
implement and apply open and informal communica al that reflects the dynam have access to information,
systems for automation, con tions. However, the continu ic North American market support and encouragement
trols and information man ous growth in BACnet cap while reaching out to en as they adopt BACnet and
agement. One thing I have abilities, applications and compass and present a glob seek to realize those bene
learned is that in all open participants has created a al perspective. fits. As such, we are pleased
systems initiatives, commun demand for more accessible to support the BACnet
ication on a global basis information and education The BACnet International International Journal and
among users, suppliers and al material. Journal’s positioning allows hope you find it an inspiring
all interested parties is es it to complement ASHRAE’s and useful in link in your
sential. The BACnet Interna The BACnet International BACnet Today publication, own communications chain.
tional Journal promises to be organization is focused on the various regional BACnet
an important addition to the the need for information and Journals as well as our own
global flow of information education and is working Cornerstones publication. It
and dialogue on BACnet and on a variety of initiatives to is a new link in the commun
the solutions it enables. address it. We support the ications chain that ties the Andy McMillan
BACnet International Journ global BACnet community President of BACnet
BACnet was initially re al because we believe there together and benefits us all. International
leased fifteen years ago and is great value in having a General Manager of
the standard as well as the straightforward periodical BACnet International is cen Philips Teletrol
BACnet community has been with easy to understand ar tered in North America but andy.mcmillan@philips.com
rapidly growing and evolv ticles introducing readers to is deeply committed to the
Let’s Communicate
the BACnet Evolution
The BACnet Committee cele interoperability that BACnet enthusiastic worldwide adop and stateoftheart securi
brates the publication of systems can provide. tion of the standard. ty, to its adoption of wireless
the first BACnet Internation technologies, BACnet con
al Journal. With so much The scope of BACnet in the Toward that end, I would tinues to evolve and to em
happening in the BACnet enterprise continues to in like to invite any interested brace the bestofclass tech
community, it is important crease, and this past year parties to participate in the nologies, which keeps itself
to find ways to communicate saw the addition of two more committee process. While and your buildings on the
the activities of the commit working groups, one for IT there are many dedicated in leading edge. You never
tee and its working groups integration and one for el dividuals who attend all 26 have to worry about being
to a broad audience, and we evators, bringing the total days, there are other experts stuck in the past with BACnet.
hope you will enjoy reading to thirteen. These working who may participate in only
about exciting success stories groups, along with the ple one working group. While If you would like to know
and the technology that en nary committee, meet four their time commitment is more about the BACnet stan
ables them. times a year for a total of 26 less, their contributions are dard or to participate in its
days of facetoface meet quite valuable, and the entire exciting future, you can find
BACnet continues to grow in ings. That represents a lot BACnet community bene more information at bacnet.
acceptance worldwide. With of commitment from a large fits from their involvement in org, bacnetinternational.org,
more than 400 vendor num number of vendors, consul producing a relevant and use and ashrae.org.
bers handed out to date (and tants and customers. The ful specification.
almost 100 of those in the Committee prides itself on
last 12 months), the pace of its balance, seeking the in As you will read in the pages Dave Robin
development of new BAC put of a wide range of in of BACnet International Chairman ASHRAE
net products is increasing tre dividuals so as to not be Journal, the BACnet world is SSPC135
mendously. Manufactures influenced solely by manufac a big one. From the expand Automated Logic
and customers alike are tak tures. We all know this leads ing and maturing Smart Grid Corporation
ing advantage of the power, to a far better standard and efforts, to enterprise and IT drobin@automatedlogic.com
robustness, flexibility, and is a large contributor to the integration with XML, IPv6
this latter regard, the group’s tices in the design and im news from the evergrowing
International Liaison com plementation of BACnet sys number of BACnet Interest
mittee hopes to establish tems with case studies from Groups that have sprung up H. Michael Newman
lines of communication this around the world, and exten around the world. You will Chairman ASHRAE
year with all of the existing sion articles on a variety of also find the latest informa Standards Committee
BACnet Interest Groups in applications. These contribu tion about BACnet training from July 1, 2010
an effort to provide whatever tions will come from design sessions, conferences and ex Chairman ASHRAE SSPC
assistance it can to help them engineers, product develop hibitions worldwide. 135, 1987-2000
succeed. ers and users of all kinds. Facilities Operations
There will be also be news I hope you enjoy this exciting Cornell University
On the practical side, it is about the activities of the new publication. Thanks for Ithaca, NY,
the hope that this Journal ASHRAE BACnet commit your interest and for being a hmn2@cornell.edu
will provide information on tee as it seeks to enhance and part of the BACnet commu
BACnet products, best prac improve the standard and nity!
The purpose of the Smart of it will involve human in energy instead. It can also be and observing a number of
Grid is to use energy more ef teractions (in fact, a number used to decide whether or not other factors such a historical
ficiently, reducing the need to of these interactions are al to generate electricity to feed timeofday, timeofyear,
construct more power plants, ready performed this way, in back to the grid. weather and other factors.
to make better use of exist limited situations.) To improve the utilities’ fore
ing power plants, to integrate The last case presented here casts the consumers (com
inconstant energy sources Energy prices involves the availability of mercial and industrial build
such as solar and wind, and One way to persuade con multiple energy suppliers, re ings) forecast their energy
minimize as much as pos sumers to change their elec ceiving rates from each, and usage hours, days or even
sible the use of “peaking trical consumption patterns selecting a less expensive months ahead and share that
plants” – power plants that is through changing energy source over a more expensive information with the utilities.
can be brought online very prices, whether the price is one. (LEED buildings may
quickly, but which are ineffi varying as a function of cost use slightly different criteria Measuring energy
cient to operate. In addition, of generation (over time), or to meet “green” energy source consumption
the Smart Grid is intended to as a function of the cost of requirements.) Measuring a building’s ener
extend the use of the already the energy source. gy consumption with billing
burdened electric transmis Forecasting energy grade meters and conveying
sion grid in a time of growing In one case of the first meth consumption that to the utility is an ele
demand for electrical power. od, the various electrical Knowing more accurate ment of energy consumption
This will be accomplished loads within the building ly in advance what the elec measurement, but there are a
through new kinds of elec are defined as “sheddable”, trical demand is likely to be number of other applications
tronic interactions between those loads that can be re helps the energy utilities to of energyuse measurement
the various participants, duced or turned off if neces determine how best to plan that apply within the build
from power generating facili sary, as opposed to “critical” and manage their ability ing for reducing demand.
ties to the end consumers. loads which could include to meet that demand. This Many of these applications
production processes; there forecasting can be done to can use BACnet meters to
There are several efforts are many factors to this de day generally using input supply this information for a
underway to define the ways termination, including per from a few big consumers number of end uses.
in which the Smart Grid will sonnel safety, comfort, pro
interact with its participants duction schedules, and so on.
and the data exchanged in Electricity prices for speci
those interactions. Although fied periods of time are con
these various definitions have veyed to the building in ad
yet to be merged into a sin vance, and it responds in
gle document, one organiza preprogrammed form dur
tion, the Energy Information ing each interval.
Standards Alliance (a.k.a. the
“EIS Alliance1”), has publish In a similar case, energy
ed review drafts of the inter prices, as well as requests
actions and data exchanges from the utility to reduce de
between the Smart Grid and mand for a period of time
commercial, industrial and (usually under contract in ex
residential buildings. change for lower prices), are
used to optimize production
The following types of inter processes for cost.
actions draw on that work,
focusing in particular on the A different use of advance
elements that will apply to utility energy pricing in
BACnet systems in commer formation is to determine The “backend” of the shedding and restoring capability is
cial buildings. It should be (manually or automatically) already present in BACnet.
noted that although the end whether to use energy from
goal is to have a fully auto the grid or to switch to on
mated Smart Grid, elements site generation or use stored 1
www.eisalliance.org
If the consumer can mea or for inclusion in reports It Grid maintenance regulatory, environmental or
sure his energy consump can be used for comparisons Communications between social requirements around
tion, he can manage it bet against similar buildings or the building and the utilities the world. And though the
ter. One method for doing other buildings within the can be very important when specific drivers for Smart
this is to use submeters to owner’s portfolio. Finally, it it comes to grid maintenance Grids will vary from place
measure the energy con can be used for Energy Star activities. to place, the need will be al
sumption through electrical or green building rating pur most universal and it is in this
outlets (a.k.a. “plug loads”), poses. Having the utility receive the realm that the one interna
by power circuits and at the status of the building’s gen tional data communications
panel level. Another method Controlling loads eration capacity intended protocol designed explicitly
is to meter specific devices Shedding and restoring loads for the grid is quite impor for buildings, BACnet, is
for their consumption (some as requested by the utility is tant for times when the util positioned to shine.
devices already measure their another aspect of the Smart ity is planning maintenance
own consumption and can Grid, one that will affect of its electrical distribution
provide this data). BACnet systems. As noted system. Similarly, conveying
earlier, building loads may those plans to the building
A similar application uses be shed as a result of pricing can provide warning of pos
temporary equipment to information, but they could sible power outages or lower
measure and verify the per also come as direct requests quality power.
formance of energyefficien from the utility, presumably
cy upgrades. to avoid brownouts. Conclusion
The Smart Grid is still in
If the goal is to have a build Although the particulars of its early stages of develop
ing whose energyefficiency is the communications with the ment, and it is possible that
well above normal, one will building have yet to be de as its definition and devel
want to display it! The ener fined, the “back end” of this opment progresses, addition
gy consumption is measured shedding and restoring capa al interactions between the
and pricing information is bility, whether the result of utilities and the building au Bill Swan
used to calculate the resul pricing or utility requests, is tomation systems in com Honeywell
tant costs and greenhouse already present in BACnet mercial buildings will be de bill.swan@honeywell.com
gas emissions for display on a through its Load Control ob fined. These interactions may bacnetbill.blogspot.com
screen, say, in the lobby, and/ ject. even be driven by different
Building Connectivity
Over
35Years In Networked Controls Visit www.ccontrols.com/basrouter
Solutions
Ski-jump at the 2010 Winter Olympics is the first ski-jump facility in the world with a steel-pipe cooling system.
Alongside the goals for a Controls partner ESC Au systems were ensuring all controllers operate in six
sustainable Olympic venue, tomation, and Delta Con athletes had the best pos individual buildings at the
Canada also set aggressive trols OEM partner CIMCO sible environment in which Sliding Center. All buildings
goals for medal achievement, Refrigeration, that BACnet to compete. are networked into the main
and created the Own the owned the podium in 2010. refrigeration plant situated
Podium (OTP) program. The number of 2010 Win Some of the facilities in at the bottom of the Sliding
Own the Podium set speci ter Olympic facilities that which Delta Controls Center. The 1400TR central
fic targets for Canadian ath have Delta Controls BACnet BACnet product was in plant refrigeration system
letes to achieve excellence products installed is impres stalled for the 2010 Winter utilizes 121 custom evapor
as a world leader in perfor sive. Whether it was speed Games are as follows: ator coils with 450,000 feet
mance sport. The OTP pro skaters practicing laps at of steel piping embedded into
gram resulted in a total of the Richmond Speed Skat The Whistler Sliding approximately 6000 feet of
14 gold medals for Canada, ing Oval, or Ski Jumpers Center, Whistler BC: concrete track. Cimco’s ECO
more than any previous host preparing to catch the best Home to the Bobsleigh, Luge CHILL® system converts
nation has won during the air up at Whistler or the the and Skeleton events, the waste approximately 1,500,000
Winter Olympics. world’s finest hockey players heat from the ice track refrig btu/hr of waste heat in
battling to compete for Gold; eration plant is captured and to heat for the building’s
It could also be said that behind the scenes Delta Con reused to heat buildings on heating system. A network
through the efforts of Delta trols BACnetbased control site. Delta Controls BACnet of DDC panels located
in five CIMCO fabricated refrigeration package. It is vide cooling for two Olym Coliseum had an upgrade
weather proof panels were one of only two ski jump fa pic sized ice sheets and the from an existing Delta
used to track temperature cilities in the world to be re building air conditioning in Controls legacy system to the
sensors located throughout frigerated, and the first to its legacy configuration. A latest Delta Controls
the track. utilize a steelpipe cooling Cimco ECO CHILL® system BACnet system. This pro
system. is used for heat recovery. ject involved integration to a
Nordic Center, CIMCO 560TR central
Whistler BC: Richmond Olympic Athletes Village Energy plant refrigeration system
Home to the CrossCoun Speed Skating Oval, Center, Vancouver BC: that is responsible for cool
try Skiing, Biathlon and Ski Richmond BC: The $30 million Olympic ing the main rink surface.
Jumping events, this 4 build This $178 million state of Athletes’ Village energy This facility also utilized
ing site is an independent the art speed skating track plant received the highest the Delta Controls BACnet
BACnet facility. A combi was identified as the “sex environmental certification Lighting Control System for
nation of HVAC heat recov iest” 2010 Olympic compe in the world, Leadership in event and area controlled
ery ventilators with electric tition venue in Omega Life Energy and Environmental lighting. An average of 15%
coils and hydronic heating time magazine. Additionally, Design, (LEED) platinum. reduction in energy use was
systems help make this a the Institution of Structur The Energy Centre, one of achieved through more effi
LEED Gold project. A CO2 al Engineers awarded the the first in North America cient lighting, DDC control
demand control system and Richmond Olympic Oval its to use sewage as fuel, kept lers and dehumidification
tempered heating ventilators top award for Sports or Lei 2,800 athletes and officials upgrades.
for outside air rounded out sure Structures. Technically, warm during the Olympics.
this project. the CIMCO 700TR central The False Creek Energy These Games set an incred
plant refrigeration system Centre is part of Vancouver’s ible standard for sustain
Olympic Park Ski Jump utilizes four screw compres attempt to become a world ability, so much so that the
Center, Whistler BC: sors and two plate & frame leader in green energy. venues have received the Ex
Home to the ski jumping evaporators circulating up to cellence for Green Build
events, both the 96 meter 10,000 USGPM of calcium UBC Winter Sports ing Award from the Globe
and 125 meter ski jumps chloride brine throughout Centre, Vancouver BC: Foundation and the World
were mechanically cooled by the floor. The refrigeration Home to the ice hockey Green Building Council.
a customdesigned CIMCO system is convertible to pro events, the eye on the ice
system monitors ice temper Delta Controls BACnet pro
ature and humidity on the ducts helped fulfill the goal
surface as well as building of sustainability and perfor
temperature and humidity, mance, just as the OTP pro
reporting the data to a cen gram did for the Canadian
tralized BACnet Advanced athletes. Though BACnet
Operator Workstation. This wasn’t on the athletes minds
stream of information al while they were on the podi
lows the ice maker to mani um, it was responsible for
pulate the venue conditions ensuring that the environ
and optimize the ice surface. ments in which the athletes
Through CIMCO Refrigera performed met their world
tion, a 400TR central plant class standards.
refrigeration system was in
stalled cooling three sheets
of ice. The ECO CHILL®
system recovering 3,800,000
btu/hr of refrigeration waste
heat dramatically reduces
the natural gas usage in the
facility.
For years the high school it was named an Energy Star trol of all the heating, ven tem required the district
students and faculty took in 2007 by the U.S. Depart tilating and air conditioning maintenance staff to com
formal measures to reduce ment of Education, and re (HVAC) equipment on cam municate onetoone with
waste and make the campus ceived California’s Flex Your pus. The school chose an devices, so establishing sepa
greener, including creating Power Award for the energy Alerton building solution in rate schedules, for example,
a green advisory committee savings it generated between stalled by Syserco, Alerton’s for different zones – and dif
that collects recyclable mate 2006 and 2007. San Franciscobased dealer. ferent schools, once they are
rials from all the rooms on all tied into the single BAS –
campus every week. In 2009 As part of its continuing ef Update challenges was difficult.
the school was named the forts to maximize efficien There were two primary
nation’s greenest school in cy, Fremont Unified School challenges with the update The other challenge was
a nationwide essay contest District elected to update project. The first was con using the BAS to admin
sponsored by IC Bus, LLC, its existing dialup building verting from the existing ister scheduled loadshed
who awarded Irvington automation system (BAS), dialup system to a BACnet ding as part of the Critical
High School a $ 200,000 hy so that it could leverage an based, direct digital controls Peak Pricing (CPP) program
brid electric school bus for existing widearea network (DDC) system. The inher through Pacific Gas & Elec
winning the title. In addition (WAN) to centralize con ent nature of a dialup sys tric, the electric utility
provider for northern and functions. Syserco was override some selected areas for the last three years, and
central California. The CPP able to leverage nearly all that may be still occupied, is a significant achievement
program is designed to re the school’s existing lega such as the principal’s office considering the annual elec
duce electrical demand dur cy IBEX hardware, so only or a gymnasium. trical bill for entire district is
ing highpeak periods, so a minimal replacements were $2 million.
participating organization necessary. Additional tasks A client logistic interface
commits to trying to shed included converting IBEX™ relay (CLIR) receives the Irvington High School was
a certain percentage of its to BACtalk using an Alerton signal from Pacific Gas & able to standardize all the
load. In return, the organi global controller with BCM Electric through the Internet various building systems
zation receives reduced elec TUX modules, updating to and passes it onto the BAC with the Alerton BAS and
trical rates for times during the latest version of Envision talk software to invoke the since it leverages the ex
the program period when for BACtalk, and adding curtailment program. The isting WAN, the staff now
Pacific Gas & Electric does new screen graphics. All CLIR features eight outputs views data from multiple
not call for a load reduction. told, BACtalk controls the that execute multiple control sites more quickly without
Irvington High School’s CPP HVAC and exterior lighting strategies. One output re having to individually dial
program period includes 12 at the high school, and im ceives notice of the pending up the data.
“event days” that fall be plements the Auto Demand Auto DR day. The Irving
tween May 1 and October Response energy reduction. ton system displays a graph Other schools have already
31. From noon to 3:00 p.m., ic of a red light so the opera begun their own efforts
the electrical rate is three The CPP program through tor knows the prompt will to duplicate the success
times the normal charge; Pacific Gas & Electric asks come in the next 24 hours. Irvington High School staff
during 3:00 and 6:00 p.m., participants to commit to At noon on the Auto DR day, has had in increasing energy
rates are five times high shedding a predetermined the operator reads the second efficiency.
er. Fremont Unified and percentage of their electrical output as an incoming dry
Irvington High School were load on prescheduled days contact and it implements
pioneers in Pacific Gas & between May 1 and Octo the 12:00 – 3:00 p.m. load
Electric’s CPP program, but ber 31 each year. Irvington reduction, cycling four zones
needed to make sure its own High School is currently en within the targeted area off
BAS could respond effec rolled with 12 automatic de and on for 15 minutes each.
tively when the call came out mand response (Auto DR) A third contact implements
to shed its load. days during which Pacific the 3:00 – 6:00 p.m. strategy
Gas & Electric can call, 24 for curtailment.
Systems installed hours in advance, to prompt
Syserco installed an Alerton curtailment. In return for decreasing its
BAS on the district’s existing energy use through Pacific
WAN that monitors and con The high school sheds its Gas & Electric’s CPP pro
trols all the HVAC equip load in two phases: Stage gram, Irvington High School
ment on campus, and uses One cycles the HVAC equip pays a reduced rate for kilo
BACnet to execute multiple ment on and off starting at watts. In addition to other
control strategies for auto 12:00 p.m. through 3:00 schoolwide energysaving
matic loadshedding. The p.m. Stage Two begins at measures, the school was able Nancy Robbers
high school’s BAS includes 3:00 p.m. and ends at 6:00 to cut its energy consump Alerton Marketing
operator workstations that p.m. – all units are shut down tion by 33 percent in a single Communications Specialist
run Alerton’s Envision™ for at 3:00 p.m. While most of year. The districtwide CPP Nancy.Robbers@Alerton.com
BACtalk® software, which the school is closed by 3:00 program has saved approx www.alerton.com
manages all the building’s p.m., it’s still possible to imately $10,000 each year
of a drive in the field can re were asked about their ex
sult in production downtime perience on this customer
and significant financial loss; visit, Gene Brittain, a re
in the case of St. Luke’s and gional application engineer,
other medical facilities like it, noted, “It’s easy to see how
the failure of a drive can be every person has a hand in
much more catastrophic. providing the highest product
Cherian Varghese, HVAC quality and support possible,
Supervisor at St. Luke’s, ex so hospitals like St. Luke’s
plained to the group that, feel confident to use our pro
in hospital environments, ducts.”
“HVAC systems are vital be
cause, just as one example, This is the second of on
for surgeons, any fluctu going customersite visits,
ation in temperature can initiated by Aaron Aleithe,
cause their glasses or compu VP and GM of Low Voltage
ter screens to fog, and that Drives and Motors. “Our
impedes critical conditions, goal with these visits is to see
so it is crucial to keep air both how products our fac
temperatures in control.” tory teams produce are used
– and also how they truly
Visit at St. Luke’s Medical Control Center by makers of drive. Along with temperature con impact peoples’ lives, across
trol, ABB drives also control a host of operations,” said
the fans for the hospital’s George Lord, the managing
If you have ever wanted to plained that the advantage of 3filter system, which fil director of operations for
appreciate why quality and ABB drives is the fast warran ters the “supply” air in the ABB factory. Lord co
fast order fulfillment are cru ty and “hot job” turnaround to the building and surgi ordinated the visit with Todd
cial to end users, you would time on emergency orders. cal rooms, keeping the air Wimmer, the Northern
have enjoyed being part of the “Competitor units have to go sterile and preventing infec Regional HVAC sales man
visit ABB personnel work back to the factory and sit. tion. “Hospitals never close,” ager.
ing in the New Berlin factory ABB has the ability to replace noted Cherian, “so reliabil
made to the Aurora St. Luke’s a unit within hours. This can ity is key – and we are
Medical Center in Milwau be a big advantage for future very pleased with how ABB
kee on June 29th. Gene Brit sales. A lot of the time, the VFD’s helps us ensure these
tain, Paul Jacob, Houxeng way to win customers is with operating conditions that we
Xiong, Alan Pelishek, and the hot, onepiece orders for need.”
Seng Yang volunteered for emergencies.”
the visit to St. Luke’s, to see St. Luke’s has nearly 100
how drives leaving the fac In the case of St. Luke’s, it’s ABB drives controlling cool
tory reach their final des a good partnership, Seidler ing towers, chilled water
tinations. noted, and “most hospitals pumps and supply and re
throughout the state utilize turn fans throughout the
The visit began at JMB & As ABB products, due to their facility, including in the
sociates, the local ABB Repre quality – and the service and new Patient Tower – the 12
sentative for HVAC products, performance that our busi storey, 430,000squarefeet
serving the medical center. ness works day and night to addition that houses eight
Jody Seidler, the service man deliver with these products.” new operating rooms, 78 in
ager for JMB & Associates, tensive care units, and 192 Ken Graber
explained to the group how Clean air and temperature private patient rooms. ABB Media Relations
“having ABB support us en control helps save lives ken.j.graber@us.abb.com
ables us to serve customers around the clock A circle of care www.abb.com
on a daily basis.” He ex In many instances, the failure When the ABB employees
The implementation of the technology in the Promutuel building showed the way to significant savings.
Global climate change and operators and owners have system using points, which Building automation
rising energy prices mean buildings and space they can are awarded for sustainable unencumbered by cables
that efficiency, sustainability lease for an attractive re site, water efficiency, energy and batteries
and flexibility in building are turn. Sustainable building and atmosphere, materials To make its head office in
becoming increasingly im can be made measurable and and resources plus indoor en Quebec really sustainable,
portant. To successfully im transparent by the award of vironmental quality. There the Canadian insurer de
plement these prerequisites, a LEED certificate. are four levels of LEED qual cided to partner with the
more and more operators ification: certified, silver, building’s owner to have
and building owners invest LEED (Leadership in Ener gold and platinum. The most the new building LEED cer
in modern automation solu gy and Environmental De common recipients of LEED tified. To achieve this, they
tions. The aim is to automate sign) certification was de certification are office build installed innovative techno
various functions – such as veloped by the US Green ings, schools and universi logies such as EnOcean wire
control of lighting, shading Building Council in 1998 as ties. One example of a build less. This technology works
or heating – with the aid a suite of standards designed ing aiming to get a gold level entirely without batteries,
of innovative technologies to classify the sustainabili LEED certification is the so it can operate without the
and sustainable solutions, ty of buildings. This volun corporate headquarters of need for servicing or mainte
thus making them simpler tary certification procedure the Canadian Promutuel in nance. The current it needs
and more economical. Users promotes environmental surance group, situated in a is harvested from the energy
benefit from extra com ly friendly and economical complex owned by Immo in its surroundings: linear
fort and convenience, while building. Rating is done by a star. motion, light or dif ferences
It is possible to seamless
ly connect and use up to 32
EnOcean based products.
The colors red, yellow and green provide an optical signal of the air quality for the peo- After a successful” getting to
ple in the room. know” procedure of sensors
and SR65 BACnet, a com
bined operation of both net
work technologies is instant
In frequently occupied rooms so called ABCLogic calcu light function to evaluate the ly possible. Thus, existing
the air quality plays a signif lates the lowest level within a prevailing air quality. The room automations can also
icant role with regards to time period of 24h as a colors red, yellow and green be easily extended.
wellbeing and the capabili reference point, which is es provide an optical signal of
ties of the people involved. timated to be equal to the the air quality for the people
The concentration of mixed outside air. Thanks to this in the room.
gas and especially carbon di continuous selfcalibration a
oxide (CO2) determine the air time and cost intensive reca The SRC65BACnet receives
quality of the breathable air. libration is eliminated. radio telegrams and for
Therefore, air quality mea wards them to the BACnet
surements in offices and class After the detection of the system of the building. Thus,
rooms have become of para CO2 concentration via a the device includes the func
mount importance and are NDIR sensor (Non Disper tion of a wireless receiver
part of modern building au sive Infrared) the data is con for EnOcean based RF tele
tomation. veniently transmitted to a re grams and is always oper
ceiver by an EnOcean based ating together with other
By means of the wireless RF telegram and gets eval BACnet automation stations.
sensor module SR04CO2 uated. Thus, a direct fan All parameterization and
Thermokon offers an intel control can be realized via a configuration settings are
ligent solution for the con wireless actuator. Transmis feasible via the BACnet net
nection to room automation. sion is made with the work. Nico Gotthardt
The sensor module cyclically approved 315 MHz frequen Product Manager
detects the current prevailing cy (frequency for North The used and internation Thermokon Sensortechnik
CO2 value in ppm (parts per America). ally standardized BACnet GmbH
million). As a reference point MS/TP protocol enables the n.gotthardt@thermokon.de
a continuous selfcalibration Alternatively, the device is connection to automation www.thermokon.de
of the module is used. The also available with a traffic stations or building control
Frank Schubert1
For a long time conformance tests 2.The Python-script-engine: mat (PICS = Protocol Implemen This makes the BACnet test
for BACnet have been available Python is an easytouse, but tation Conform ance Statement) framework the excellent choice
only as manual tests. This com powerful scripting language. This EPICS is used, where all the de for quality assurance, for long
plicates reproducibility and due to allows users to write their own vice capabilities are listed. term tests or similar applications.
the higher effort for manual repe scripts and to design own user
tition costs are pretty high com tests. In the first test the consistency The software was introduced in
pared to automated tests. of the EPICS, this means integri the first European test round in
3. The graphical user-interface: ty and accuracy of the EPICS are 2007 and is used in the European
The software BACnet Test Frame This application is the “stage checked. test laboratory and for BACnet
work (BTF) from MBS makes au direc tion”, where testplans are QApurposes by various manu
tomated BACnet tests available and defined, results are displayed and If the EPICS is correct, the test facturers since then.
allows easy, costeffective and re analysis is operated. plan may be generated. The soft
producible tests not only for con ware supports this process by
formance testing but also for quali 4.The SQL-database: selecting the tests according
ty assurance or similar applications Directly connected to the userin to the device profile and the
in automated testing and analysis. terface is the MSSQL database, current test plan (BTL 5.0 final).
which contains the full BACnet
The software, running on Micro standard in various tables as well as This allows a wide range of appli
soft Windows, is based on four the testprojects and their results. cations far beyond conformance
main components: testing. The BACnet test frame
Example procedure work with its highly flexible struc
1. The BACnet protocol-stack: In the first step the device and ture is qualified for all kinds of
This service allows communica its capabilities must be intro automated tests and allows pro
tion to the connected BACnet de duced to the test framework. gramming own tests, reports or
vices. For this, the electronic PICSfor statistics.
1
Frank Schubert, MBS GmbH, is a member of the Advisory Board and the Working Group Technique of the BIG-EU,
as well as training-leader of the BACnet Interest Group Europe, frank.schubert@mbs-software.de
Berhard Isler1
At ASHRAE’s 2010 Winter Con rates and clarification of usage of tee considered this to be the start Addendum135.12007g
ference held in Orlando, the date and time, were voted out for ing point on the path to end the Many new Tests, Updates
BACnet committee celebrated inclusion into a next addendum long debate on character set inter and Corrections of tests
the approval for fi nal publication and public review. operability within BACnet. Addendum 135.12007h
of eight addenda to the ANSI/ Change Chaining Test
ASHRAE Standard 135 XML – IT-friendly way of More data types supported by Change CHANGEOF
representing building data new value objects STATE Test for Event En
On January 23rd and 25th the The new Addendum 1352008t With Addendum 1352008w, rollment Object
members of ASHRAE Standing specifies a standard way of re BACnet has added support Chance Confi rmed COV
Standard Project Committee presenting data in XML that will for more data types. A set of EventNotification Service
SSPC135 met in Orlando Florida give BACnet new capabilities new Value objects rounds out Initiation Tests to Noninfi
for their winter meetings. The for communications and data BACnet‘s ability to represent dif nite Lifetimes
main topic was the development exchange in a wide range of appli ferent data types in a uniform and
of the worldwide manufacturer cations. The Extensible Markup standard way. Added to the origi Elevator working group
neutral BACnet building auto Language (XML) is a popular nal Analog, Binary and Multi established
mation network standard ANSI/ technology in the data processing State Value objects are new Value In the discussion of new work
ASHRAE 135 and ISO 164845. and communications worlds due objects for almost every primitive items after the individual work
to its capability to model complex datatype that BACnet supports, ing group reports, the question
Eight addenda were approved by data and its flexibility to be trans including support for character of “elevator monitoring and con
the ASHRAE board of directors formed and extended. strings, bit strings, date, time and trol via BACnet networks” was
for publication: large numeric values. brought up. A while before the
“With this new ITfriendly way Orlando meeting, Professor Dr.
Addendum 1352008h Miscel of representing building data, Test Standard Developments Albert So of the Hong Kong Uni
laneous Changes BACnet will open up new ways The need to defi ne a set of pro versity contacted Bill Swan to
Addendum 1352008k Char to communicate. XML can be cedures for the testing of BACnet help work on a proposal to re
acter Sets used for exchanging fi les between implementations has led to the present large elevator systems in
Addendum 1352008n Backup systems, communicating with development of an accompany BACnet.
and Restore Improvements the Smart Grid, and expanding ing standard, ANSI / ASHRAE
Addendum 1352008t XML enterprise integration with richer 135.1 and ISO164846. The Alerton hosted an elevator man
Data Formats Web services,” said Dave Robin, ANSI/ASHRAE Standard 135.1, ufacturer summit to collect input
Addendum 1352008u Errors, chair of the BACnet committee. Method of Test for Conformance and to review the revised propo
Aborts, and Rejects to BACnet ®, defi nes extensive sal. At that summit, it was de
Addendum 1352008w Primi UTF-8 to extend ubiquitous testing for each feature of the cided to form a BACnet Eleva
tive Value Objects ANSI/ASCII character set BACnet protocol and provides the tor Working Group among the
Addendum 1352008x Clarifi Addendum 1352008k adds an basis for the testing and list ing manufacturers.
cations to the standard important new capability for program, as defi ned by BACnet
Addendum 1352008y Deploy human languages globally. When International. Also for this ac The SSPC 135 constructively
ment options for MS/TP the Unicode character set was companying standard, the com discussed and decided for the
created many years ago, it was mittee was working on a number establishment of an Elevator
In the course of the meetings constructed to be a universal set of addenda: Work ing Group that should shad
the SSPC was working on other of characters to support most of ow the manufacturers‘ group in
BACnet Addenda to prepare them the world‘s languages together in Addendum 135.12007d the committee. This new ELWG is
for publication or a next public one stream. However, its original Add test to verify that COV chartered to observe and sup
review: multibyte encoding caused trou subscription lifetimes are port further developments of the
bles with a lot of existing systems not affected by timesync re elevator control and monitoring
Addendum 1352008g Net that were designed to process on quests proposals, and to act as a peer
work Security ly the 1byte characters common Add new ActiveCOVSub for the manufacturers‘ working
Addendum 1352008i Lighting in western languages. The UTF8 scriptions tests group.
Control encoding was created by the Uni Addendum 135.12007e
Addendum 1352008p Global code Consortium to solve this Revise BACnet/IP tests The next ASHRAE Winter Meet
Group Object problem and quickly became a Addendum 135.12007f ing will be right before the AHR
Addendum 1352008z Miscel very popular method of conveying Clarify Tests for Ack Notifi Expo 2011 in Las Vegas, on the
laneous Changes international text on the World cation Timestamps last weekend of January 2011.
Addendum 1352008aa Chan Wide Web. BACnet has also Add new Database Revision
nel Object and WriteGroup embraced this standard now and tests
Service uses it in a way that fully takes Update CreateObject Service
advantage of its compatibility with Tests
In addition, new change pro the ubiquitous but limited ANSI/ Update DeleteObject Service
posals, for higher MS/TP baud ASCII character set. The commit Tests
1
Bernhard Isler is the Secretary of the ASHRAE SSPC 135 and Producer Voting Member. He also convenes the Objects & Services Working Group of the
committee. He is a member of Siemens Switzerland Ltd, Building Technologies Group, located in Zug, Switzerland. bernhard.isler@siemens.com
www.enocean-alliance.org
A BACnet router provides some BACnet MS/TP de The BAS Router makes the
the path between a BACnet/ vices are isolated from their BACnetIP to BACnet MSTP
IP network and a BACnet building controller due to a connection.
MS/TP network. BACnet lack of an interconnecting
building controllers (BBC) MS/TP cable, these points
usually provide this func can be accessed over Ether
tionality but the expense of net via the BAS Router.
a building controller to pick
up some BACnet MS/TP On the BACnet/IP side is a and duplex. AutoMDI/X
points is not always neces 10/100 Mbps Ethernet RJ ensures a connection regard
sary. 45 port and on the BACnet less if straightthrough or
MS/TP side is an isolated crossover cable is used. On The BAS Router is vers
Stand alone router EIA485 port that can be the MS/TP side, the baud atile in that it will support
A standalone router such connected to either 2wire rate (9.6–76.8 kbps) is set as threeway routing between
as Contemporary Controls’ or 3wire MS/TP networks. part of the webpage configu BACnet/IP, BACnet Ether
BAS Router can do the trick. An isolated EIA485 port ration. Autobauding MS/ net and BACnet MS/TP.
Any number of BAS Rout provides greater protection TP field devices will then Any two or all three proto
ers can be incorporated in and better noise immunity match their data rate to that cols can be routed. As an aid
to one BACnet internet but can interface with either of the BAS Router. Up to 63 to troubleshooting, a diag
work by simply attaching to isolated or nonisolated field field devices can attach to nostic page will display the
an available Ethernet switch devices. The Ethernet port the MS/TP port on the rout number of messages received
port within the Ethernet in will autonegotiate with the er. As part of the configu and sent for each of the pro
frastructure. Therefore, if Ethernet switch port speed ration, unique BACnet net tocols supported.
work addresses are assigned
to each BACnet network. A companion product called
the BAS Portable Router
For subnetted Ethernet net provides much of the same
works, more advanced functionality as the BAS
features are needed in or Router, but it is intended for
der for BACnet broad commissioning and trouble
cast messages to bridge shooting without making
across IProuters. The a permanent connection.
BAS Router provides Thus, the portable device
BACnet/IP Broadcast does not implement BBMD
Management Device nor FDR functionality. In
(BBMD) and Foreign tended for use with a laptop,
Device Registration the BAS Portable Router is
(FDR). A Broad USB powered while the BAS
cast Distribution Router is 24 VAC/VDC
Table (BDT) is powered.
webpage configu
rable. A Foreign
Device Table (FDT)
Contemporary Controls
can be viewed to learn
gthomas@ccontrols.com
what foreign devices have
www.ccontrols.com
The BAS portable router is intended to work with a laptop. registered to the BAS Router.
ATOM 3 Power Meter- allows the client to monitor ATOM 2 summary report of accumulated data for
and review. projections, historical analysis and comparisons.
multiuser licence with Web Gas and any other building isons. This aids to reduce and are represented world
Browser called “eServer”) services. cost, and ensures simpli wide including over 20 repre
city for the installer and cli sentatives in North America.
Innotech have also devel The addition of BACnet ent. BACnet implementa
oped a Data Acquisition, Re to iComm allows the tion has allowed Innotech
porting, Analysis and Billing BACnet Power Analysers to continue its success in the Innotech
package “A.T.O.M”. This to communicate directly global BMS markets. sgregson@
software package allows the with the Innotech software innotechamerica.com
client to monitor and review (A.T.O.M), and accumulate Innotech Control Systems www.InnotechAmerica.com
their Electrical use, Carbon data for projections, histor are Australia’s largest manu www.innotech.com.au
Emissions, Energy, Water, ical analysis and compar facturer of BMS controls
Serial communications, approval,” said Jeff Miller, System tested for at the main BTL page:
sans gateway vice president, commer compatibility with ht tp: // bacnet association.
“We are honored to have an cial sales, ABB Low Voltage all BACnet devices org/btl/default.htm.
independent testing organi Drives. “A twoyear inter What does the approval and
zation provide this stamp of nal R&D program achieved listing mean? “This gives The ABB drive and bypass
building into these bypasses an end user a very high de are listed at: http://bacnetas
this final piece of the serial gree of confidence that the sociation.org/btl/Listings/
communications puzzle, and ABB EClipse Bypass and ABB/ABB.htm. Or, review
to eliminate the expense and ACH550 VFD will inter the shared BASC page at
challenges of hardware and operate with other BTL ht tp: // bacnetassociation.
gateways. BACnet replaces listed devices,” notes Mike org/btl/Listings/Profiles/Ap
those (gateways & hard Olson, manager, HVAC ap plication Specific Control
ware) with one language, ab plications, for ABB. The ler.htm.
le to work in real time, any controller also complies
where.” Bypasses are a very with the ANSI/ASHRAE In addition to the U.S.
common VFD option, often Standard 1352004, he said. BACnet Testing Laboratory
specified by consulting engi The ABB EClipse Bypass office in India, BACnet pro
neers and owners. A bypass option features a standard ducts also are being tested at
controller allows the user to connection that is MS/TP, a lab in Germany.
operate the motor on utili RS485based; and it sup
ty power at full speed in the ports all BIBBs defined by
event that the VFD is out of the BACnet standard profile
service for any reason. for an Application Specific
Controller (BASC), Olson
Officially, BTL has listed the said.
ABB
ABB EClipse Bypass as a
mike.olson@us.abb.com
BACnet Application Specific The listing is available
www.abb.com
Controller (BASC). for review and reference
The BACnet journey in China began at the BACnet Forum Beijing in 2009. It will
be continued in Shanghai at the World Expo. The estimation is that within the next
20 to 30 years urban construction areas will double.
Last year’s Forum had a great within the next 20 to 30 engineering. Most of the
effect on building automa years urban construction products sold by these ven
tion in China. The media re areas will double, and that dors are imported.
ported that it was "one of the 40 billion square meters of
most important events for the new building space will be es It seems that China will
intelligent building industry tablished. Meanwhile there definitely become the most At the Forum investors,
in China in 2009 ". Follow is also a rapidly growing important market for intel specifiers, system inte
ing this success BIGCN de demand for implementing ligent building system com grators, operators and users
cided to link the upcoming energy conservation reno panies. Thus, at the BACnet will learn about the benefits
Forum to the Shanghai Expo vations in old buildings. Forum Shanghai advanced of BACnet and the immedi
– for even better BACnet pro At the moment there are BACnet technology and ate future of independent
motion. nearly 3,000 intelligent products from America, building system integration.
building product vendors in Europe and Asia will be in Read the details on spon
Urbanization in China is China, and around 1,100 troduced to one of the most soring and participation at
developing rapidly these companies are qualified in important economic centers www.bacnetforum.org.
days. It is estimated that contracting with intelligent of the Chinese market.
Impressive tender announce (BIGEU) voted for a glob individual booth. The ca guarantee for an internatio
ments in Qatar on the one al joint booth at this year’s pability to equip and man nal range of visitors that are
hand and Asian controller Big 5. BACnet Internation age multivendor systems can inclined to buy.”
vendors at the Big 5 on the al (BI) members who had be proven by real interoper
other hand – the building participated in the very first ability. Unanimous opin Automated Logic: “Dubai
automation market in the BACnet booth at Big 5 2008 ion of all parties interested is more than the headline
Middle East is on the move. also signaled they wanted to was that the booth must ap making Burj Khalifa. It is a
Therefore the members of be a part of the booth. Last pear in a premium outfit and trade center for all the Emir
the American, European and but not least the members of transport the higher value of ates and the Gulf region.
Middle Eastern BACnet as the BACnet Interest Group BACnet. This lively economic region
sociations are keeping an eye Middle East (BIGME) are stands for a big number of
on the prospects there. highly interested. Expert opinions huge running construction
Delta Controls: “There are projects. Therefore the Big5
The Working Group Mar The benefits of the common big export chances. We have Dubai is a worthwhile spot
keting of the BACnet booth are high visibility and recognized them at the Big5 for BACnet promotion.”
Interest Group Europe low costs compared to an in 2008 as an exhibitor of
the BACnet booth. In 2009 As in 2008 the BACnet
we had an individual booth. booth at the Big 5 Dubai
With a prestigious joint 2010 is again organized by
BACnet booth the visual im MarDirect. The call for par
pact on investors and deci ticipation was recently sent
sion makers could even be to the BACnet groups in
greater.” America, Europe and the
Middle East. Receive your
Siemens Building Technolo copy via willems@mardi
gies: “The economic situa rect.de
tion of Dubai itself is irrele
vant. But wealthy states like
Qatar are close to the spot
BACnet is on the move in Dubai since 2008. A prestigious light. And short distances
interoperability show at the Big 5 2010 will again attract to North Africa, India, even
decision makers from Africa, Asia, Europe and Middle East. Russia, and the Arab World
BlueRidge
Technologies
ADMMicro Airtek International, Inc. Blue Ridge Technologies Building Technology Systems Ltd
Roanoke, VA Taipei Marietta,GA Warrington, Cheshire
USA Taiwan USA United Kingdom
www.admmicro.com www.airtekgroup.com www.brtint.com www.buildingtechnologysystems.co.uk
Carrier Control Solutions, Inc. DEOS Control System DUKSAN MECASYS CO., LTD.
Farmington, CT St. Paul, MN Rheine Seoul
USA USA Germany Republic of Korea
www.carrier.com www.csimn.com www.deos-ag.com www.imecasys.com
Ebtron, Inc. Fujitsu General Limited Greystone Energy Systems, Inc. Industrial Technology
Loris, SC Japan Moncton, NB Research Institute
USA www.fujitsu.com Canada Chutung, Hsinchu
www.ebtron.com www.greystoneenergy.com Taiwan (ROC)
www.itri.org
ITT Residential and Commercial Kieback&Peter Mitsubishi Electric Corporation NEP Ltd.
Morton Grove, IL Germany Tokyo Montreal, QC
USA www.kieback-peter.de Japan Canada
www.itt.com global.mitsubishielectric.com www.neptronic.com
We have seen a flurry of ap 19Jan2010: testing of capabilities spec working group meetings held
plications for testing so far In recognition of the suc i fied in SSPC135 Addenda Winter, Spring, Summer, and
in 2010. The lab now has a cessful completion of the up through Protocol Revision Autumn, or at the BACnet
backlog of 17 devices and A2LA evaluation process 8. Availability of that Test International annual Plug
a waiting list of about 4 (including an assessment of Package is expected around fest and the FacilityDecisions
months between date of ap the laboratory‘s compliance Labour Day 2010 (Sept 6). conference held each year.
plication and start of test with the A2LA Information
ing. It is nice to see our Technology Program Re I want to express my thanks
product offering so well re quirements), accreditation is to the hardworking volun
ceived, and appreciated granted to this laboratory. teers on the BTLWG and
by the BACnet communi other working groups, who
ty. We test the whole range We are working with WSP have made the BACnet com
of BACnet Device Profiles, Cert and the BIGEU Liaison munity so vibrant, innovative,
from BAWS, BOWS and and Technical committees and successful. It is through
BOD workstations, BBC to establish the process for their efforts that the market
buildings controllers, B European certification to for networked building sys
AAC and BASC application apply to all ISO accredited tems flourishes and the pro
controllers, BSA and BSS BACnet testing laboratories. mise of a greener world and
actuators and sensors, and Devices tested at our lab in smarter operational control
BOTH BACnet routers. Pune India are in accord with is coming to fruition. Join us,
Using the BTL Test Package all ISO accredited testing pro and celebrate the contribution
5.0.final which has now been cedures and requirements, that you can make to further
adopted by all BACnet test and should qualify for a cer enriching this technology and
laboratories worldwide, we tificate to be granted to those realizing all of its potential. Duffy O’Craven
bring certainty to the market customers henceforth who Manager of Testing
for interoperable BACnet de wish to apply for it. Duffy O‘Craven can be Laboratories (BTL)
vices. reached at btlmanager@ Chairman of BTL-Working
Among highlights that I antic bacnetinternational.org He Group
A highlight of my tenure thus ipate in future is the release of works primarily in Toronto blt-manager@bacnetinter-
far was the accreditation updated Test Packages. The Ontario CANADA. You national.org
issued to the BTL lab on next release should cover all will also see him at the SSPC