Team SuperBimmers
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
First Name |Jiang Wenjie First Name | Aung Soe Linn First Name | Wang Yiming First Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
First Name | Danish Afif First Name | Zheng Ziang First Name | Liu Yingdi First Name | Aung Soe Linn
2022
Content Page
5. Learning Outcomes
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Roles & Responsibilities
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Timeline, Research and Tasks
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Strengths
❏ Located in the Orchard high-class district, Strengths & Opportunities
which is centrally positioned
❏ Located in Singapore's prime retail area,
Orchard (Many Singaporeans and tourists
will visit)
❏ Shopping malls & institutions near this
site
❏ Very convenient for students who live in
this district to go to school and residents
to go to the shopping malls
❏ Transportation is very convenient
(Surrounded by 4 bus stops and 2 MRT
station)
❏ Good environment = good mood (Site is
adjacent to a forested area that provides
a green & healthy lungs)
Opportunities
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Site Information
This site is located near to the Orchard MRT and Somerset MRT. It is adjacent to Ngee
Ann City with a total area of 9200 sqm. Individuals will have to take the exit from Exit C
at the Orchard MRT station and walk about 500m distance to reach the site.
Surrounding View
From the east area is the Orchard Link Route - It is one-way traffic as it is adjacent to
the (SCAPE) building. From the south area of the site, there is a junction of Orchard Blvd
route - It is one-way traffic adjacent to OUE Building. From the north area, there is a
junction of Orchard turn route - It is two-way traffic adjacent to Ngee Ann City. It is
usually congested with heavy traffic during weekends.
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Key Concept & Background Research
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
AR & VR
AR
❏ Able to export our Revit Model to the software and from there, each
of us is able to annotate or add notes on the building elements
❏ Able to solve the issues or make the updates in real time + track our
performance and progress
❏ We use the BIM Track Plugin to receive notifications
❏ Improve the analysis of our site and model workflow
❏ Easier to visualize our model design and make changes
❏ Helps with clash detection at the MEP stage
❏ Able to visualize model in 3D view
VR
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
GFA Calculations
Total Ground Floor Area (GFA) = 60,000 m² (Residential: 60%, Commercial: 40%)
GFA of Residential (Bedrooms + Circulation area of Residential) = 60% X 60,000 = 36,000 m²
GFA of Commercial (Commercial Uses + Circulation Area of Commercial) = 40% X 60,000 = 24,000 m²
Commercial (Circulation area of Commercial: 38%, Commercial Uses: 62%)
Residential (Circulation area of Commercial: 25%, Commercial Uses: 75%)
Taking 4 storey for Commercial and 16 storey for Residential (Including 24 unit room levels) Section 3: Lean, Sustainability & Practicality
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
GFA Calculations
Proposed Size(m)
Approx. width x
Type no. of units Unit Mix
Area ( m²) Length
per storey
Type A – 1 7.86 x
55 5 15% 6.075
bedroom
Type B – 2 10.815 x 7 A A B B B B
75 11 42%
bedroom
Type C – 3 13.185 x 7
100 6 31%
bedroom
Type D – 4 16.43 x 7
115 2 11% Type B (2 Bedroom)
bedroom Type A (1 Bedroom)
Total 24 100%
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Sun Path Wind Path
September
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Solar Analysis & Simulation
Hot
Normal
16 30 09 00
Cold
● E & NE Side of area facing to the sun directly with high solar radiation at
the morning and Sunset on West Direction with high radiation so we Put
Facade & Sun Shading with Greenery to reduce the heat load
● Solar panel to generate the electricity & reduce the heat on the roof
Use Insight Plugin to Run Solar Simulation on the Massing Model Section 3: Lean, Sustainability & Practicality
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Rwind Simulation
● We use Rwind wind to simulate wind flows around buildings to result in pinpointing
areas of high wind velocity.
● According to the result we have, we can make our building side surface face to east
direction so wind can flow through to the residential area.
Section 3: Lean, Sustainability & Practicality
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Commercial & Residential Planting Dynamo
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
After solar analyse we found that part of area are face on the sun directly hence we
decide to put planting to reduce the building heat load by using dynamo
With this coding tree can be change layout by certain direction the planting will
adjusted accordingly
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
DfMA - Prefabricated Prefinished Volumetric Construction
Transportation
This table shows how many trucks are required based on the total no. of units
and PPVCs calculated.
D 30 7 210 4 120
Benefits of DfMA
Reduced part number and part counts, Reduced assembly Total 360 - 1,380 - 780
operation, Reduced product lead-time, Reduced packaging costs,
Increased productivity and efficiency, Reduced material cost,
Reduction in overall system/product cost, Improved product quality
and reliability Section 4: DfMA, Collaboration & Conflict Resolution
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
DfMA - Prefabricated Prefinished Volumetric Construction
Type C (3 Bedroom)
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Clash Detection (NavisWorks)
Using naviswork to check any clashes
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Naviswork Model Phasing Simulation
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
COLLABORATIVE PLATFORMS
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Challenges & Learning Points
1. Our group finds the DfMA challenging as this is a new construction way and it is also our first
exposure to this game-changing method of construction. Although this is our first time to do PPVC
and we faced several difficulties, we manage to successfully overcame it together.
2. We are not in same class. Hence it was quite hard to arrange a time that we are able sit together and
discuss about the project. During this time, we use zoom a lot and it helps us to convey our ideas to
each other. We also split in small groups to focus on finishing some specific points, such as MEP,
DfMA. This helps us to work effectively and improve the overall productivity.
3. Our first version of design is a “leaf” shape, but it could not be implemented as the blocks were too
close to each other, which will reduce percentage of natural light that goes into the room. We have
learnt that when we are designing the building, we should not only consider the natural light and
ventilation, but also need to consider about the living comfort and personal privacy.
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
THANK YOU!
SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn