International Building Design Competition 2022

Team SuperBimmers

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
First Name |Jiang Wenjie First Name | Aung Soe Linn First Name | Wang Yiming First Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
First Name | Danish Afif First Name | Zheng Ziang First Name | Liu Yingdi First Name | Aung Soe Linn
2022
Content Page

1. Teamwork & Overall Project Quality

2. Integrated Digital Delivery (IDD) & Innovation

3. Lean, Sustainability & Practicality

4. DfMA, Collaboration & Conflict Resolution

5. Learning Outcomes

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Roles & Responsibilities

Project Manager Architect & Specialist MEP Consultant


Muhammad Danish Afif Aung Soe Linn Kaung Sett

Developer C&S Consultant Quantity Surveyor Builder


Jiang Wenjie Wang Yiming Liu Yingdi Zheng Ziang

Section 1: Teamwork & Overall Project Quality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Timeline, Research and Tasks

Section 1: Teamwork & Overall Project Quality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Strengths
❏ Located in the Orchard high-class district, Strengths & Opportunities
which is centrally positioned
❏ Located in Singapore's prime retail area,
Orchard (Many Singaporeans and tourists
will visit)
❏ Shopping malls & institutions near this
site
❏ Very convenient for students who live in
this district to go to school and residents
to go to the shopping malls
❏ Transportation is very convenient
(Surrounded by 4 bus stops and 2 MRT
station)
❏ Good environment = good mood (Site is
adjacent to a forested area that provides
a green & healthy lungs)

Opportunities

❏ Orchard's appeal for future residential,


office and commercial development
would be impacted by a well-designed
project
❏ The location has the ability to establish
new markets in the residential
neighborhood
❏ Our building will use a lot of
South View: Residential zone | East View: Social activities zone
environmentally friendly technologies to North View: Shopping zone
construct the structure Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Site Information
This site is located near to the Orchard MRT and Somerset MRT. It is adjacent to Ngee
Ann City with a total area of 9200 sqm. Individuals will have to take the exit from Exit C
at the Orchard MRT station and walk about 500m distance to reach the site.

Surrounding View
From the east area is the Orchard Link Route - It is one-way traffic as it is adjacent to
the (SCAPE) building. From the south area of the site, there is a junction of Orchard Blvd
route - It is one-way traffic adjacent to OUE Building. From the north area, there is a
junction of Orchard turn route - It is two-way traffic adjacent to Ngee Ann City. It is
usually congested with heavy traffic during weekends.

East View North View South View South West View


Section 1: Teamwork & Overall Project Quality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Key Concept & Background Research

01 Shading 02 Green Features 03 Facades


❏ Sun Shading device (To reduce heat ❏ Incorporated vertical greeneries ❏ Facade uses Aluminium Composite
gain ) (To reduce the heat transmitted to with engineered wood products to
❏ Installed on the 4 surface of the the building wall into the interior improved structural integrity
residential building area. building space) ❏ Method of construction - Design for
❏ Type of shading used - horizontal single ❏ Greeneries help to reduce noise Manufacturing and Assembly (DfMA)
blades installed on every level of the pollution & lowers the operating ❏ Uses Cross-Laminated Timber (CLT) for
surrounding facade cost for buildings in the long term our building facade (Improve
❏ This device acts as an overhang in our ❏ Serve as shading devices to the construction productivity, reduce
model façade (Reducing the amount of construction time, reduce manpower
energy required in cooling the on-site by up to 35%, high
interior) strength-to-weight ratio, environment
sustainability)
Section 1: Teamwork & Overall Project Quality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
AR & VR

We use ENSCAPE software for both AR and VR for easy collaboration:

AR

❏ Able to export our Revit Model to the software and from there, each
of us is able to annotate or add notes on the building elements
❏ Able to solve the issues or make the updates in real time + track our
performance and progress
❏ We use the BIM Track Plugin to receive notifications
❏ Improve the analysis of our site and model workflow
❏ Easier to visualize our model design and make changes
❏ Helps with clash detection at the MEP stage
❏ Able to visualize model in 3D view

VR

❏ Allow us to view our model through VR, helping us to improve the


process in the design stage
❏ Able to visualize the end result of the model before it is being built +
provide us an immersive walk around the building
❏ Easily detect issues before finalizing our design
❏ Allows a preview of the future outcomes of the model that can
significantly reduce reworks, development time & costs

Section 2: Integrated Digital Delivery (IDD) & Innovation

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
GFA Calculations

Total Ground Floor Area (GFA) = 60,000 m² (Residential: 60%, Commercial: 40%)
GFA of Residential (Bedrooms + Circulation area of Residential) = 60% X 60,000 = 36,000 m²
GFA of Commercial (Commercial Uses + Circulation Area of Commercial) = 40% X 60,000 = 24,000 m²
Commercial (Circulation area of Commercial: 38%, Commercial Uses: 62%)
Residential (Circulation area of Commercial: 25%, Commercial Uses: 75%)
Taking 4 storey for Commercial and 16 storey for Residential (Including 24 unit room levels) Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
GFA Calculations
Proposed Size(m)
Approx. width x
Type no. of units Unit Mix
Area ( m²) Length
per storey

Type A – 1 7.86 x
55 5 15% 6.075
bedroom

Type B – 2 10.815 x 7 A A B B B B
75 11 42%
bedroom

Type C – 3 13.185 x 7
100 6 31%
bedroom

Type D – 4 16.43 x 7
115 2 11% Type B (2 Bedroom)
bedroom Type A (1 Bedroom)

Total 24 100%

Total Area of Type A = 27,000 X 15% = 4,125 m²


Total Area of Type B = 27,000 X 42% = 12,375 m²
D D
Total Area of Type C = 27,000 X 31% = 9,000 m² C C C C D D
Total Area of Type D = 27,000 X 11% = 3,450 m²
Each of unit floor area = 5 X 55 + 11 X 75 + 6 X 100 + 2 X
D D D
115 = 1,930m²

Type C (3 Bedroom) Type D(4 Bedroom)


Total number of Car Park = Car Park (Retail) + Car Park
(F & B) = 183 car lots
Car Park (Residential) = 1 lot per 2 units

Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Sun Path Wind Path

Timing: 0930hrs Timing: 1200hrs

September

Wind intensity: NNE Wind > N Wind = S Wind > SE Wind


> other direction
Timing: 1500hrs Timing: 1800 hrs
Wind direction NW is at 14km /hours with humility to
❏ 0900hrs: Sun rises from the east side of the building - At this time, the sun is at the
be 66. The east side of the building (floorplan) will be
horizon, sun's rays travel a longer distance through the atmosphere to reach the
windier as compared to the west side. As such, more
building hence the sun is not so hot
wind will come through the windows on the east side of
❏ 1200hrs and 1500hrs: Sun is over the head - Building will be exposed to the sunlight
the building. On the other hand, there will not be much
directly & people who are living on the high floor will feel hot
wind coming through the windows from the west side
❏ 1800hrs: Sun will start to fall slowly sunset on the west direction as the radiation from
as there are many trees crowded in that area, hence
the sun travels a larger distance through the atmosphere, the evening sun is not as hot
blocking the wind flow.
as the mid-day sun (The building itself will also not be too hot as compared to the
timing in noon 1200hrs and 1500hrs) Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Solar Analysis & Simulation

Hot

Normal

16 30 09 00

Cold
● E & NE Side of area facing to the sun directly with high solar radiation at
the morning and Sunset on West Direction with high radiation so we Put
Facade & Sun Shading with Greenery to reduce the heat load

● Solar panel to generate the electricity & reduce the heat on the roof

Use Insight Plugin to Run Solar Simulation on the Massing Model Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Rwind Simulation

● We use Rwind wind to simulate wind flows around buildings to result in pinpointing
areas of high wind velocity.
● According to the result we have, we can make our building side surface face to east
direction so wind can flow through to the residential area.
Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Commercial & Residential Planting Dynamo

● Reduce the building heat load by placing the


greenries of the building external facade.

● Creating a path line to determine the position


of the trees using dynamo.

● Dynamo enable us to change the types of


trees and the quantities.
Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022

After solar analyse we found that part of area are face on the sun directly hence we
decide to put planting to reduce the building heat load by using dynamo

With this coding tree can be change layout by certain direction the planting will
adjusted accordingly

It can be tweek the number of the tree

able to change plant type

Section 3: Lean, Sustainability & Practicality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
DfMA - Prefabricated Prefinished Volumetric Construction
Transportation

In compliance to LTA‘s traffic regulatory requirements

Width ≤ 3.4 meters

Height < 4.5 meters (inclusive of truck height)

Laden Weight < 80 tons

This table shows how many trucks are required based on the total no. of units
and PPVCs calculated.

Type Total Units No. of Total Truck used Total No. of


About DfMA PPVC PPVCs / per unit Truck
Prefabricated Prefinished Volumetric Construction (PPVC) is a Required
construction method whereby free-standing 3-dimensional .We A 75 2 150 2 150
design to improve the cost & productivity and quality . Modules
was designed to fit allowable trailer size and height for B 165 4 660 2 330
transportation to site area C 90 4 360 2 180

D 30 7 210 4 120
Benefits of DfMA
Reduced part number and part counts, Reduced assembly Total 360 - 1,380 - 780
operation, Reduced product lead-time, Reduced packaging costs,
Increased productivity and efficiency, Reduced material cost,
Reduction in overall system/product cost, Improved product quality
and reliability Section 4: DfMA, Collaboration & Conflict Resolution

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
DfMA - Prefabricated Prefinished Volumetric Construction

Type C (3 Bedroom)

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

Section 4: DfMA, Collaboration & Conflict Resolution

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Clash Detection (NavisWorks)
Using naviswork to check any clashes

Level 6 MRP clashing


with the wall

Section 4: DfMA, Collaboration & Conflict Resolution

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Naviswork Model Phasing Simulation

Section 1: Teamwork & Overall Project Quality

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
COLLABORATIVE PLATFORMS

Section 4: DfMA, Collaboration & Conflict Resolution

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022
Challenges & Learning Points

1. Our group finds the DfMA challenging as this is a new construction way and it is also our first
exposure to this game-changing method of construction. Although this is our first time to do PPVC
and we faced several difficulties, we manage to successfully overcame it together.

2. We are not in same class. Hence it was quite hard to arrange a time that we are able sit together and
discuss about the project. During this time, we use zoom a lot and it helps us to convey our ideas to
each other. We also split in small groups to focus on finishing some specific points, such as MEP,
DfMA. This helps us to work effectively and improve the overall productivity.

3. Our first version of design is a “leaf” shape, but it could not be implemented as the blocks were too
close to each other, which will reduce percentage of natural light that goes into the room. We have
learnt that when we are designing the building, we should not only consider the natural light and
ventilation, but also need to consider about the living comfort and personal privacy.

Section 5: Learning Outcomes

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn
2022

THANK YOU!

SuperBimmers
Developer: Architect: C&S Consultant MEP Consultant
Name | Jiang Wenjie Name | Aung Soe Linn Name | Wang Yiming Name | Kaung Sett
Project Manager: Builder: Quantity Surveyor: Specialist:
Name | Danish Afif Name | Zheng Ziang Name | Liu Yingdi Name | Aung Soe Linn