X-OVER 3 1/2" IF 3 1/2" PH6 4.75 2.25 0.430 -0.096 Well Serve
X-OVER 3 1/2" PH6 3 1/2" IF 4.75 2.25 0.443 3635.017 Well Serve
Slip Joint (0.76 m Open) 3 7/8" CAS 3 7/8" CAS 5.00 2.25 5.330 3635.720 CNLC
HWDP 3 1/2" IF (2 stands) 3 1/2" IF 3 1/2" IF 3.50 2.13 56.350 3641.310 OGDCL
DRILL COLLARS 4 3/4" IF (8 stands) 3 1/2" IF 3 1/2" IF 4.75 2.31 220.560 3697.660 OGDCL
DRILL COLLARS 4 3/4" IF (1 stand) 3 1/2" IF 3 1/2" IF 4.75 2.31 27.770 3919.840 OGDCL
Select Tester 3 7/8" CAS 3 7/8" CAS 5.00 2.25 7.270 3947.874 CNLC
Gauge Carrier 3 7/8" CAS 3 7/8" CAS 5.00 1.90 0.713 3955.144 CNLC
Circulating Valve (Hydraulic Bypass) 3 7/8" CAS 3 7/8" CAS 5.00 2.03 2.130 3955.857 CNLC
Big John Jar (Fully Closed) 3 7/8" CAS 3 7/8" CAS 5.00 2.25 1.593 3957.987 CNLC
SAFETY JOINT 3 7/8" CAS 4 5/32" UNS 5.00 2.25 0.920 3959.580 CNLC
Prepared By: Abdul Waheed, Cell No.+92 334 3711152 Approved By Pakistan Project Team Leader:
Company Man Mr. Aamir Hussain 7" Packer Setting Depth 3960.50 m Cushion height 2000 meter
Prod Engineer Mr. Saad Hyd.pressure @ Pkr Depth 6298.78 psi Cushion Head 2840 psi
Prod Engineer Mr. Falak Sher Est. Formation Pressure (BHP) psi Mud/Brine Weight (sg) 1.12 sg
CNLC Crew Est. Formation Temp (BHT) 250 ˚F Mud/Brine weight (ppg) 9.33 ppg
DST Supervisor Fiaz Shafique Top Of Liner 7" 3938 m PBTD (Bridge Plug) 4170 m
DST Engineer M. Tariq 7" Casing WEIGHT 35 ppf Perforation intervals (m) 3991 TOP
DST Gauge Man Aamir Alli 7" Casing (ID) 6.004 inch Perforation intervals (m) 4136 BTM
DST Operator Shahzaib Hyd.pressure @ RDCV Depth 6231.95 m Total Intervals Gross (m) 145 m
DST Operator Usama Jehanzaib RDCV RD Installed 9.5K psi Total Intervals Net (m) 77 m