Frequency of Inspection Should be carried out as per the table no.1. Contractor
should engage a NACE qualified Supervisor to supervise the monitor the work
and to ensure the compliance. The vendor should perform all the test mentioned in
the schedule as per the table -5.3through authorized accredited agencies in the
presence of NIOT Officials .
Table-5.3
Test Standard Frequency Acceptance criteria
Surface cleanliness ISO 8501-1 One per ten (10)sq.m Sa 2 1/2
Total Soluble salt ISO 8502-9 One per twenty (20) <5µg/cm2
contamination square meters or
minimum 5 tests
whichever is more.
Dust ISO 8502-3 One per ten (10) square Rating 2 or better
meters
Adhesion ISO 4624 One pretest panel, per 5 MPa
shift
Dry Film Tickness SSPC PA-2 Shall not be less than
80% and more than
120% of specified dry
film thickness (DFT)
Wet film Thickness ISO 2802 One per ten (10) square Consistent with
meters providing required
DFT
z. Welding
The welds with thickness and length provided in the drawings shall be made
conforming to IS 816 (latest revision).
The heat affected zone (HAZ) shall be allowed to cool naturally .No external
methods for cooling the HAZ rapidly shall be resorted to.
The surfaces of the members to be welded shall be prepared and should be free of
any contaminations.
The welding electrodes to be used for welding shall be of marine grade standards
approved by marine classification society.
The welder deployed for the work should have minimum three years of
experience and the ITI certification.
Non destructive tests should be made for qualifying the welds.
aa. Concrete coating for members
The thickness of the concrete coating shall be 75 mm and to be applied on all the
exposed areas of the members.
The members with concrete coating shall be painted only with primer coats (two
coat).