STRUCTURAL DRAWING

SCHEDULE OF COLUMN: 0.2L1 0.3L1


0.15L1
0.3L2
0.15L2
0.2L2

C6,C7,C8, ALONG
DISTRIBUTION BAR
(MIN. 2 Nos. BAR) ALONG SHORTER ALONG
PROJECT:
ALONG LONGER TOP REINF.
GRADE C12, C14
CONC.
COL. SHORTER SPAN LONGER SPAN
C9,C10,C16, C13 SPAN(Curtailed) (CURTAILED) DISTRIBUTION BAR SPAN(Curtailed) PROPOSED REMODELING OF CIRCULATING
MKD.
C17,C19,C20 AREA AT
COL.SIZE 350X300 350X300 400X400 MAHALIMARUP STATION
50(TYP.)
350 ALT. CURTAILMENT
400
350 0.15L1 ALONG SHORTER 0.25L1 0.25L2 ALONG LONGER 0.15L2
ROOF FL. LVL.

10
SPAN(Curtailed) SPAN(Curtailed) CERTIFICATE OF THE STRUCTURAL ENGINEER:

d(
>7
300

5m
300

400
L1(SHORTER SPAN) L2(LONGER SPAN)

m
FND. TO

)
CERTIFIED THAT THE STRUCTURAL DRAWING & DESIGN OF BOTH THE
4-20#+4-16# 4-20#+2-16# 4-20#+2-16# FOUNDATION AND SUPERSTRUCTURE OF THE BUILDING HAS BEEN MADE
M25

CONSIDERING THE SOIL TEST REPORT, AS PER THE RULES & REGULATIONS
(2 Set Stirrups) (1 Set Stirrups) (1 Set Stirrups) d

10d
135
MADE UNDER THE ACT AND ALSO CONSIDERING ALL POSSIBLE LOADS,
CONFINING CONFINING CONFINING SEISMIC LOAD & THE MOMENTS GENERATED BY THE PROPOSED STRUCTURE
TO BE BENT
ZONE-A=750mm ZONE-A=750mm ZONE-A=750mm CL. OF COL. AS PER THE BUREAU OF INDIAN STANDARD & NATIONAL BUILDING CODE OF
AT 135° DETAIL -1 CROSS TIE
& FDN. INDIA & CERTIFIED THAT IT IS SAFE AND STABLE IN ALL RESPECT AND
ARRANGEMENT

THESE PROVISIONS SHALL BE ADHERED TO DURING THE CONSTRUCTION.


TYPICAL DETAIL
STIRRUPS

G.L. DETAILS OF 135° HOOK


1
(+/-0.00) OF LINK
1
TO BE PROVIDED TO
2 1 2 2
ALL LINK

SCHEDULE OF ISOLATED FOOTING: NAME OF STRUCTURAL ENGINEER- KRISHNENDU PAUL


ENROLLMENT NO: SMC/II/11
LENGTH WIDTH DEPTH REINFORCEMENT REMARKS
FOOTING
MKD. (A) (B) FOR PEDESTAL 10# @ 150C/C
d1 AT BOTT. BOTH WAY(a1) AT TOP BOTH WAY(a2)
REINF. REFER 100 (PEDESTAL REINF.)
NOTE: GENERAL NOTES:

DT. OF PEDESTAL
F1 1600 1600 350 10# @ 150 C/C 8# @ 150 C/C TYP. FOOTING (TYP.) UNLESS SPECIALLY MENTIONED ON A DRAWING THE FOLLOWING NOTES SHALL APPLY
SECTION.
DO NOT SCALE THE DRAWING. TO ALL STRUCTURAL DRAWINGS.

600(TYP.)
BOTT. OF a2
1. CO-ORDINATE THIS DRAWING ALONG WITH RELEVANT ARCHITECTURAL AND SERVICES
FND. (-1500) WRITTEN DIMENSIONS TO BE DRAWINGS.
2. ALL DIMENSIONS AND LEVELS ARE IN MILLIMETERS UNLESS MENTION OTHERWISE.

d1
FOLLOWED. 3. DO NOT SCALE THE DRAWING, FOLLOW WRITTEN DIMENSIONS ONLY.
A B C D E F G 4. ALL STRUCTURAL DRAWINGS ARE BASED ON ARCHITECTURAL DRAWINGS. LAYOUT
3120 3380 3250 3250 3490 3120
DIMENSIONS AS GIVEN IN STRUCTURAL DRAWINGS SHALL BE VERIFIED FROM
a1 100 THK. RELEVANT ARCHITECTURAL DRAWINGS. IN CASE OF ANY AMBIGUITY IN DRAWINGS,
P.C.C. THE MATTER SHALL BE REFERRED TO THE CONSULTANT BEFORE EXECUTION OF
75 Ax(B) 75 WORK AT SITE.
5. ALL FOUNDATIONS SHALL BE REST ON VIRGIN SOIL WHENEVER THE SOIL CONTAIN

4
B1 B2 SECTION- B THE LOOSE SOIL POCKETS, THE SAME SHALL BE REMOVED AND REFILLED WITH THE
P.C.C., NET SAFE BEARING CAPACITY TAKEN FOR DESIGN OF ISOLATED FOOTING IS
C1 C2 C3 C4 C/L OF COLUMN 22 T/sq.m. AS PER SOIL TEST REPORT.
C/L OF FOOTING 6. THE LATEST REVISION OF THE DRAWING SHALL BE CONSIDERED WHILE REFERRING
S1 TO THE INDICATED DRAWING.
B19

B22

B31

B34
3250

S1
a2
B3 B4 B5 B6 B7 B8 C/L OF AT TOP
3
C5 C6 C7 C8 C9 C10 C11 ROOF BEAM BOTH WAY CONCRETE:
10Φ @ 100c/c 7. ALL CONCRETE WORK SHALL BE AS PER IS 456:2000.
500 ROOF PROJ. ROOF LVL. 8. ALL STRUCTURAL REINFORCED CONCRETE WORK SHALL BE WITH DESIGN MIX
B18

B26

B33
B21

B24

B28

B30
3750

S1 S1 S1 S1 S1 S1 (+4575) CONCRETE OF GRADE M25 UNLESS NOTED OTHERWISE.


125 9. PLAIN CONCRETE WORK SHALL BE OF THE FOLLOWING GRADES OF NOMINAL MIX
X X 150
C/L OF COLUMN

==
350 CONCRETE:

B
C/L OF FOOTING a). 1:5:10 PLUM CONCRETE FOR FILLING CONCRETE UNDER FOUNDATION (WITH
B9 B10 MAXIMUM AGGREGATE SIZE OF 40 MM.) AND AS , PIT, TRENCHES ETC.
2 250
C12 C13 C14 8Φ @ 150c/c B b). M-15 FOR LEAN CONCRETE BELOW FOUNDATIONS & TIE PROTECTION.
-
B20

B23

B27

B29
B17

B25

B32
3250

S1 S1 S1 S1 S1 S1 SECTION X X

8#@ 100 C/C


REINFORCEMENT STEEL:
ZONE-A 10. ALL REINFORCING STEEL SHALL BE OF TESTED QUALITY.
B11 B12 B13 B14 B15 B16 11. ALL REINFORCEMENTS UNLESS OTHERWISE SPECIFIED SHALL BE COLD DEFORMED
1
C15 C16 C17 C18 C19 C20 C21 a1 HIGH YIELD STRENGTH BARS, CONFIRMING TO IS:456 AND IS:1786 WITH MINIMUM
YIELD STRENGTH OF 500 N/Sq. MM.
AT BOTT. A 12. UNLESS OTHERWISE SPECIFIED MINIMUM LAP LENGTH FOR REINFORCEMENT SHALL
== BE 50 x DIA OF LARGER BAR. NOT MORE THAN 50 % OF BARS SHALL BE LAPPED AT
BOTH WAY ANY SECTION. FOR SLABS & BEAMS LAPS SHALL NOT BE PROVIDED AT MID SPANS
FOR BOTTOM BARS AND CLOSE TO SUPPORTS FOR TOP BARS.
ISOLATED FOOTING 13. LAPS AND SPLICES OF REINFORCEMENT TO SUIT AVAILABLE LENGTH OF BARS SHALL
BE MADE AS SHOWN ON THE DRAWINGS OR APPROVED BY THE ENGINEER AT SITE.
ROOF SLAB-BEAM LAYOUT
(SCALE 1:100) (TYPICAL) 14. ALL HOOKS. BENDS, LAPS AND SPLICES SHALL BE AS PER IS:2502.

8#@ 150 C/C


CLEAR COVER:
ZONE-B 15. UNLESS OTHERWISE SPECIFIED ON THE DRAWING CLEAR COVER TO THE MAIN
REINFORCEMENT SHALL BE AS FOLLOWS:
ISOLATED FOOTING = 50 MM, COLUMN = 40 MM, TIE BEAM = 30 MM, PLINTH & FLOOR
BEAM = 25 MM, SLAB = 20 MM.
A B C D E F G 16. STRUCTURAL SPECIFICATIONS AND NOTES MENTIONED ABOVE SHALL BE FOLLOWED
A B C D E F G 3120 3380 3250 3250 3490 3120 FOR ALL DRAWINGS AND CONSTRUCTION ACTIVITIES.
3120 3380 3250 3250 3490 3120

B1 B2
4
C1 C2 C3 C4
4 TOP OF
C1 C2 C3 C4

8#@ 100 C/C


PLINTH BEAM. DRG. TITLE:
B19

B22

B31

B34
3250

ZONE-A (+450) G.L.


F1 F1 F1 F1
STRUCTURAL DRAWING FOR PROPOSED REMODELING OF
3250

(+/-0.00)
WAITING AREA AT MAHALIMARUP STATION.
B3 B4 B5 B6 B7 B8
3
C5 C6 C7 C8 C9 C10 C11
3

8#@ 100 C/C


C5 C6 C7 C8 C9 C10 C11
CONSULTANT:
B18

B26

B33
B21

B24

B28

B30
3750

F1 F1 F1 F1 F1 F1 F1 ZONE-A
3750

8#@ 100 C/C


TOP OF PEDESTAL
B9 B10 (-900)
2
C12 C13 C14 N
2
C12 C13 C14 ZONE-A BUILDTECH CONSULTANCY E
W
B20

B23

B27

B29
B17

B25

B32
3250

BOTT. OF FND. CHAYAN PARA BAZAR, SILIGURI


F1 F1 F1
S
3250

(-1500) EMAIL- krishnendu@buildtech.co.in


300(MIN.)
B11 B12 B13 B14 B15 B16 Mob- 8128011524
1
C15 C16 C17 C18 C19 C20 C21
1
C15 C16 C17 C18 C19 C20 C21

F1 F1 F1 F1 F1 F1 F1 PLINTH BEAM LAYOUT


LONGITUDINAL SECTION DWG. NO.: SLG/PIR PROJECTS /STR./WAITING HALL/01/2022-23

COLUMN FOUNDATION LAYOUT


(T.O.C. +450 LVL.) OF COLUMN (TYP.) SCALE- 1:100 , 1:50, 1:25 SHEET: 1 OF 1
(SCALE 1:100)
(SCALE 1:100)
DATE: 10.05.2022 SIZE: 841X594 REVISION: R1