TECHNICAL SITE SURVEY REPORT (SWAP)

NCELL
SITE ID: GPOK041
SITE NAME: JANAPIRYA TOLE
SITE REGION: JANAPIRYA TOLE,POKHARA,GANDAKI

TABLE OF CONTENTS
1. Site Information
2. Access to Location
3. Existing Equipment Information
4. Existing Antenna and Feeder Information
5. AC Power Information
6. DC Power Information
7. Transmission Information (IP RAN Part)
8. Grounding System for New Equipment
9. New Equipment Information
10. New Antenna and Feeder Information
11.Civil Work Information
12. Material Requirement
13. Equipment room dwg(existing and proposed)
14. Site Elevation (existing and proposed)
15. Site Photo Check List
1. Site Information
Coordinates:
Latitude: Longitude: Attitude: 800FT
City: JANAPIRYA TOLE,POKHARA
Zone: GANDAKI District: KASKI
Site Address:

Contact Person: Contact Number:


Site Type: RTT BRT

Tower Type: 4 Legged/Angular 3 Legged/Angular 4 Legged/Tubular 3 Legged/Tubular Monopole

Tower/Pole Ht(m): 9M Building Ht(m): 6M


Equipment Type: Outdoor Room Shelter

Equipment room location floor: G+2 Tower/pole location floor: G+2


Comments if any:

2. Access to Location
Existing access road to site: Dimension: Lengt Width 3M
✔ Y N h(m): (m):
Access to site:
✔ Everyday Saturday Sunday Week Day Appointment Needed
Others

Any restrict of time to access site: ACCESS TO SITE BEFORE 9 AM IN THE MORNING AND AFTER 5 PM IN THE AF
Accessibility of Service Vehicle to Site:
✔ Truck Tractor Tricycle None (foot rail)

Head load distance(m): Tractor


load(m):
Method of Equipment to Site: Elevator ✔ Staircase

Location of main gate Key: HOUSE OWNER (NOT AVAILABLE AT THE TIME OF SURVEY)
Location of equipement room Key: GTL (9846612447)
Location of equipement Key:: GTL
Comments if any: :

3. Existing Equipment Information


Existing Equipment Type Config Power (Capasity) Location
BTS NA NA NA
BBU BBU3900 48V OUTDOOR
BB 1 12V 150AH OUTDOOR
ACDB LEGRAND 32A OUTDOOR
Battery BLUE STAR 2V OUTDOOR
DDF
Comments:

4. Existing Antenna & Feeder Information


Antenna Type: GSM DCS WCDMA Dual Band (GSM+DCS) Tri Band (GSM+DCS+WCDM

Type Cell 1 Cell 2 Cell 3 Other comments


Band DUAL DUAL DUAL
Cell ID GPOK041A GPOK041B GPOK041C
Structure/Pole allocation RT RT RT
Antenna Type LABEL NOT CLEAR
Antenna Bearing 10 110 250
Antenna Bearing Limit R20/L30 R10/L30 R90/L10
Antenna Downtilt (Mech/Elec) 2,3 3,1 2,2
Antenna Height 16M 16M 16M
RET.... 2M 2M 2M
Feeder/ CPRI Length 25M 25M 25M
Feeder/ CPRI Type CPRI CPRI CPRI
Jumper length (from BTS to feeder and feeder NA NA NA
RRU to Antenna
Existing BTS Type BBU3900 BBU3900 BBU3900
Existing TRx Type
Antenna Bearing
Existing RRU Type
Feeder/ CPRI Number
Antenna Height
TMA Information Type Loss (G900 G1800
UMTS)
Building Height
Combined Strategy
Combiner (type/loss)
Comments:
Antenna Type: GSM DCS WCDMA Dual Band (GSM+DCS) Tri Band (GSM+DCS+WCDM

Items Cell 1 Cell 2 Cell 3 Other comments


Band SINGLE SINGLE SINGLE
Cell ID GPOK041A GPOK041B GPOK041C
Structure/Pole allocation RT RT RT
Antenna Type LABEL NOT CLEAR
Antenna Bearing 20 120 240
Antenna Bearing Limit R10/L30 R40/L50 R40/L20
Antenna Downtilt (Mech/Elec) 2,3 3,1 2,3
Antenna Height 16M 16M 16M
Feeder/ CPRI Length 25M 25M 25M
Feeder/ CPRI Type CPRI CPRI CPRI
Jumper length (from BTS to feeder and feeder NA NA NA
RRU to Antenna)
Existing BTS Type BBU3900 BBU3900 BBU3900
Existing TRx Type
Feeder/CPRI Number 1 1 1
TMA Information Type Loss (G900 G1800
UMTS)
Combined Strategy
Combiner (type/loss)
Comments:
4.Existing Antenna & feeder Information:
Antenna Type: GSM DCS WCDMA Dual Band (GSM+DCS) Tri Band (GSM+DCS+WCDM

Items Cell 1 Cell 2 Cell 3 Other comments


Band
Cell ID
Structure/Pole allocation
Antenna Type
Antenna Bearing
Antenna Bearing Limit
Antenna Downtilt (Mech/Elec)
Antenna Height
Feeder/ CPRI Length
Feeder/ CPRI Type
Jumper length (from BTS to feeder and feeder
RRU to Antenna)
Existing BTS Type
Existing TRx Type
Feeder/CPRI Number
TMA Information Type Loss (G900 G1800
UMTS)
Combined Strategy
Combiner (type/loss)
Comments:

5. AC Power Information
Grid power capacity: 3 PHASE MCCB Capacity: 32A Can't find due to strict
security:

ACDB input MCB capacity: 63A


Amount of Total 0 Amount and Size of 2*25,1*20, 1*16,1*10 Amount and Size of 0
breakers Slots in Used breakers: Spare breakers and
ACDB: empty slots:
Diesel Generator:
Check List Availability Description Remarks
DG RID
capacity/Type/Brand
Automatic control NA
panel of the DG
In/out phases of the NA
DG
How to start DG in old NA
system
Comments:

6. DC Power Information
DCPDB Type: TP48200A

Amount of available 0 Amount and Size of 3*16,1*32,1*10,3*20 Amount and Size of 0


Breaker slots (Empty Used breakers: Spare breakers:
Breaker Slots):

Comments:

other DCDU information (for Outdoor BTS):


@ Cabinet Used Breakers(specify the equipment for which load is connected)
DCDU1 BTS 32A LLVD( USED FOR 2G AND 2100)
DCDU2 NA
Existing Cable runway Length of DC power Cable to
to new Equipment: Yes No Equipment:
Existing Cable runway Length of DC power Cable to AC
to AC Power: Yes No Power:

RECTIFIER
Existing rectifier: Yes No Make: Model:

Module and number of Number of working 4 Rating of modules: 4*56A


rectifier modules: modules:
Propose new rectifier Model: No. of
rack: Yes No Modules:
Propose new Modules Model: No. of
rack: Yes No Modules:

Battery
Existing Battery Make: Type: Bank:
Propose new Battery: Model: No. of
Yes No Modules:

Type of new battery: No. of new battery:


Propose new Battery Yes No Type: Amount:
Rack:
Comment:

For site with Multiple Rectifier Specify the BB connection Scenario


Rectifier-1 for Transmission Load
Existing rectifier: Yes No Make: Model:

Module and number of Number of working Rating of modules:


rectifier modules: modules:
Propose new rectifier Model: No. of
rack: Yes No Modules:
Propose new rectifier Model: No. of
Modules rack: Yes No Modules:

Battery for-1 for Transmission load


Existing Battery Make: Type: Bank:
Propose new Battery: Model: No. of
Yes No Modules:

Type of new battery: No. of new battery:


Propose new Battery Yes No Type: Amount:
Rack:
Comment:

Existing Load:

Existing Transmission Load:


Battery Cabinet 1. Seprate Battery Cabinet: NA
information:
2. Total number of Seprate Battery NA
Cabinet:

3. Model of Seprate Battery NA


Cabinet:

4. Cooling Fan working: NA


5. Used Power Plant's cabinet NA
Rack for battery:

6. Cooling & Heat NA


exchanger working for
Power plant's
Cabinet?:

7. Used TE NA
Equipments's rack for
battery?:

8. Cooling working for NA


TE Equipments's
rack?:

9. Model of TE Rack: NA
10. Extra cooling Fan NA
required to install in
TE's Rack or Power
Plant's Rack?:

11.Number of extra NA
cooling fan required:
Existing Power system enough or not?: Comment:-:
Check List Availability Description Remarks
Solar panels NA NA NA
obstructed by if any
PV panel Capacity NA NA NA
No of panels and no of NA
panels in Series
No of Junction boxes NA NA NA
No of Solar Controllers/ NA NA NA
Capacity
No of Load Controllers/ NA NA NA
Load Capacity
Junction box Voltage NA NA NA
Solar Control Voltage NA NA NA
Solar earthing NA NA NA
availability and value
Check space to NA NA NA
connect other load in
Solar contoller
Comment:

7. Transmission Information
IPRAN Device:(MW/Optical): OPTICAL
Prameter Existing
Equipment
Space* ATN950B
Power 16A BLVD
* If IPRAN device isinBTS rack,should be transferred in as____is basis.
1.Existing Microwave Site condition
ITEM Local Site Link Local MW Length Length Link type MW
name number Equipment (Meter, (Meter, (fiber/ LAN antenna
ID name New PI/IDU to cable)
and location ATN/CX ) ODU)
1.
2.
3.
4.
5.
6.
7.
8.
Impedance of E1: 75 Ohm ✔ 120 Ohm
Optical Tota
Transmissi l
on: num
ber
of
site
fiber
core
s:Sp
iral/L
it/Da
rk/T
otal:
2.Only Optical Fiber Site Condition (optical direct link, no transmission device)
Item Local Site Link Local ODF Length Distance(K Remote
name number Port/ ODF (Meter, M) to Site Name
Type New Remote
(FC/LC) ATN/CX to ATN/CX
ODF port) Equipment
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Item Local Site Link Local ODF Local ODF Length Local Local Remote Remote Remote
name number name and Port/ODF (Meter, Transmissio Transmissio Transmissio Transmissio Site Name
Location type New n n slot and n n Slot and
(FC/LC) ATN/CX to Equipment Port Equipment Port
local ODF ID ID
port)
1.
2.
3.
4.
5.
6.
Proposed New Transmission:
New
Transmissi
on Y N
Equipment:
New Equipment Type:

New IPRAN Equipment without ZTE wireless device (only IP RAN


scenario) Position of rack inside (height)m.:
New IPRAN Equipment without ZTE wireless device (common scenario) Position of rack Rack
inside (height)m.: loacation:

Existing Microwave Antenna Information


No Near End Diameter Height (agl) Azimuth to Far End Diameter Height (agl) Azimuth to
(m) F.E. (m) N.E. (Deg)
1
2
3
4
5
Summary=:
S.No Required Available Proposal
MCB
Space
8. Grounding System for New Equipment
Available Space Space
Existing available available
Grounding: on earthing on tower
Yes No bar: Yes No earthing Yes No
bar:
Length of cable from indoor Earthing bar to Grounding system: EXISTING
Length of cable from outdoor Earthing bar to Grounding system: EXISTING
Length of cable from Equipment to indoor Earthing bar: EXISTING
Length of cable from Existing Rectifier (DC Power) to indoor Earthing EXISTING
bar:

Length of cable from Indoor Cable runway to indoor Earthing bar: EXISTING
Length of cable from TGB to EGB: EXISTING
Length of cable from outdoor Cable runway to outdoor Earthing bar: EXISTING
Number of the holes available at IGB: 8
Number of the holes available at EGB: 12
Number of the holes available at TGB: 4
Earth Value:

9. New Equipment Information (This will be decided by RF team after review with existing)
Site Model: Outdoor G900+G1800+U2100> Outdoor G900+G1800+U2100
New Equipment Type Config Quantity Breaker Requirments Remarks
of Power
19Inch Rack
OMB
BBU
RRU
ATN910B
CX600
Antenna(GSM 900)
Antenna(1800+2100)
Comments:

10. NEW Antenna & Feeder Information (This will be decided by RF team after review with existing)
Item Cell 1 Cell 2 Cell 3 Other Comments
Antenna Type-1
Azimuth
Antenna Down tilt (Mech/elec)
RET
Antenna Height
Antenna Type-2
Azimuth
Antenna Down tilt (Mech/elec)
Antenna Height
Antenna Pole/Boom needed
RRU New Support Needed
Space available in feeder tray (n
tower)
Space available in cable tray (outdoor)
New vertical cable tray required: Yes No Length:

New horizontal cable tray required: Yes No Length:

Available space Available atTGB for Yes No


RRU Grounding:
11. Civil work information
No. of equipment rooms:
✔ One No. Two Nos

Type of Equipment room: Existing room Shelter(close) Shelter(open)

Need any strengthening for room for new Yes No


equipments (Especially battery banks):
Is the room Window Yes No
sealed:
Numbers of free holes on existing cable entry plate:

Existing Cable Ladder Information(Indoor Ht (m): Width (m):


Cable Ladder):
Existing Cable Ladder Information(Outdoor Ht (m): Width (m):
Cable Ladder):
Enough space has been found on Indoor Cable Tray for the additional required cables (CPRI, Yes No
DC, IF, Waveguide cables):
Indoor Cable Tray general condition: Good Rusted Bent Other defect

Does room has enough space for new equipment without existing equipment removal: Yes No
Type of existing equipment foundation: Concrete Steel frame

Dimension of existing foundation(out door):


Slab length (m)* Slab width (m)* Slab Thickness (m):
Space available for new equipment (outdoor): Yes No

Does room has enough space for new equipment without existing equipment removal: Yes No

Tower Main Pole Verticality is good: Yes No

Is there any obviously rusted parts if tower (if yes,show the pix): Yes No

Tower parts connection is in good condition? (Bolts are good? Nuts are tightening properly? Yes No
etc)show the pix:
Tower parts connection is in good condition? (Anchor bolt is fixed properly? No crack of the Yes No
foundation been found?):
Tower is capable to carry additional RRUs (new RRUs as per HW requirement)?: Yes No

Space available for new equipment(outdoor): Yes No

Existing RRU Nos. height: (from Tower Base):


Space available for new RRUs (outdoor): Yes No

Space available for new RRUs (outdoor): Yes No

is there any space (500mm*500mm) on roof slab available for installing OPS-06 below close to Yes No
existing pole (in case roof pole site):
Does the owner agreeif we are goingto install OPS-06: Yes No

Comments if any:

12. Material Requirement


# GSM 900 GSM 1800 WCDMA
# Sector1 Sector2 Sector3 Sector1 Sector2 Sector3 Sector1 Sector2 Sector3
Jumper length(m)
CPRI/RRU PWR Cable Length
(RRU to BBU)
AISG Cable length
RRU to TGB GND Cable Length(m)
TGB to EGB GND Cable EXISTING 12M
Length(m):

Grounding cable length from 19'' EXISTING 5M


Rack /OMB to IGB Length(m):

Power Cable length from DCDU to EXISTING 8M


DCPDB Length(m):

Power Cable length from OMB to 10M


DCPDB Length(m):

LAN or Transmission Cable legth 5M


from ATN/CX600 to TX equipment
Length(m):

Clamps for CPRI and Power Cable 30


Pcs:

Trunk Cable length from BBU to 10M


ATN/CX600:

MW PNE Cable Length from PI to NA


ODU:

MCB Requirement:

13. Equipment room dwg (existing and propsed)


Photo 1.: Photo 2.: Photo 3.:

File:

File: File:

14. Site Elevation


Photo 1.:

File:

15. Site Photo Check List


Detail Photo Taken Amount
Access Road
Existing Equipment
Existing DDF
Existing Transmission Equipment
Existing AC Power System
Existing ACPDB
Existing Rectifier (DC Power) System
Existing battery System
Existing Grounding bar
Existing Feeder Window Hole
Existing Site Gate
Existing Cable Ladder
Existing Antenna
Panoramic Surroundings Overview
Proposed NEW Equipment
Proposed ILPB
Proposed New Antenna & RRU
Proposed DDF
Proposed AC Power System
Proposed Rectifier (DC Power) System
Proposed Battery System
Proposed Transmission Equipment
Proposed Cable Ladder
Proposed Grounding bar
Existing RF Module in each cell (RSU60,
R8849, etc.)
Others: (Specify)
Comment if any
Photos: Access to Site
Photo 1.: Photo 2.:

File: File:

Photos:Existing Equipment
Photo 1.: Photo 2.: Photo 3.: Photo 4.:

File: File: File:

File:

Photos: Cable tray


Photo 1. Existing Indoor: Photo 2. Existing Outdoor:

File: File:

Photos: Cable tray


Photo 1. Existing Indoor: Photo 2. Existing Outdoor: Photo 2. Existing Indoor: Photo 2. Existing Outdoor:

File: File:

File: File:

Existing ODF (optical site)


Photo 1.: Photo 2.:

File: File:

Existing MW Equipment
Photo 1.: Photo 2.: Photo 3.: Photo 4.:

File: File: File: File:

Existing DDF
Photo 1.: Photo 2.:

File: File:

Photos:Existing Transmission Equipment


Photo 1.: Photo 2.:

File: File:

Photos:Existing ACPDB
Photo 1.: Photo 2.:

File:

File:

Photos:Existing Rectifier Dc Power


Photo 1.: Photo 2.:

File: File:

Photos:Existing Battery system


Photo 1.: Photo 2.: Existing Grounding Bar.: Feeder Window Hole:

File:

File: File:

File:

Photos:Existing Antenna
Photo 1.: Photo 2.: Photo 3.:

File: File: File:

Panoramic Photos
0 deg: 30 deg: 60 deg:

File: File: File:

Comment: Comment: Comment:

90 deg: 120 deg: 150 deg:

File: File: File:

Comment: Comment: Comment:

180 deg: 210 deg: 240 deg:

File: File: File:

Comment: Comment: Comment:


270 deg: 300 deg: 330 deg:

File: File: File:

Comment: Comment: Comment:

Sector View
GSM Sector 1:

View of Sector 1:

File:

Comment:

GSM Sector 2:
View of Sector 2:

File:

Comment:

GSM Sector 3:

View of Sector 3:

File:

Comment:

Sector Photos
UMTS Sector 1:
View of Sector 1:

File:

Comment:

UMTS Sector 2:

View of Sector 2:

File:

Comment:

UMTS Sector 3:
View of Sector 3:

File:

Comment:
Remarks:
GSM Sector 1:

GSM Sector 2:

GSM Sector 3:

UMTS Sector 1:

UMTS Sector 2:

UMTS Sector 3:
Antenna Blockage by Existing Equipment: Yes ✔ No

Photo of Antenna Blockage:

File:

Antenna Blockage by Surrounding Building (50m peripheri): Yes ✔ No

Photo of Antenna Blockage:

File:

Possible Antenna Blockage by underconstruction Building (50m


peripheri):
Yes ✔ No

Photo of Possible Antenna Blockage:

File:

Proposed RRU position(3 Sector Photo)


Sector 1:
View of Sector 1:

File:

Comment:

Sector 2:

View of Sector 2:

File:

Comment:
Sector 3:

View of Sector 3:

File:

Comment:

Proposed New Antenna Location for 3 sectors


Location for Sector 1:
View of Sector 1:

File:

Comment:

Location for Sector 2:

View of Sector 2:

File:

Comment:
Location for Sector 3:

View of Sector 3:

File:

Comment:

Proposed BBU position (19inch rack or OMB)


Photo:

File:

Comment:

Proposed DCDU, EMUA position


Photo 1.:

File:

Comment:

Photo 2.:

File:

Comment:

Existing RF Module in each Cell (RSU60,R8840,etc.)


GSM900 Cell 1: GSM900 Cell 2: GSM900 Cell 3:

File: File: File:

GSM1800 Cell 1: GSM1800 Cell 2: GSM1800 Cell 3:

File: File: File:


UMTS2100 Cell 1: UMTS2100 Cell 2: UMTS2100 Cell 3:

File: File: File:

Earthing Measurement Value Photo


Photo 1: Photo 2: Photo 3:

File: File: File:

GPS SNAP and HEAD LOAD Co-ordinate (Respectively)


Photo 1.:

File:

Ready?: Send Save