GENERAL NOTES

ACCESS ONLY MAX This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company's standard
Conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.

LIVE LOAD = 0.75kN/m2


Design Basis
This drawing has been prepared from information supplied to us by, or on behalf of the Client, who should check that their
requirements have been correctly interpreted and that all loadings, dimensions, details, erection, and striking sequences etc. are as
required and practicable.
The following documents obtained on loan have been used to prepare this scheme
..........................................................................................................
This drawing has been prepared in accordance with the following:

TRANSOM SPACING
BS 1139* Metal scaffolding

BS 2482 Timber scaffold boards

BS 5950-1:1990* Structural Steelwork

1.20M C/C 7850.0000

BS EN 1999-1-1-4:2005 + A1:2010

BS EN 12810-1:2003 Façade scaffolds made of prefabricated components - products specifications

BS EN 12811-1:2003 Temporary works equipment: Scaffolds - Performance requirements and general design

WORKING PLATFORMS: 5 NOS. 1.30m

1.30m
1.30m

1.30m
2.50m

2.50m
1.80m

1.80m
BS EN 13374:2004 Temporary Edge Protection Systems - Product Specification, test methods

TG4:11 Anchoring systems for scaffolding

BS 5975: 2008 Code of practice for temporary works procedures and the permissible stress design of falsework.
1.30m
1.30m 2.50m 1.80m

TG20:08 NASC Technical Guidance on the use of BS EN 12811-1

TG20:08

250
250

250
0

0
1.30m
1.30m 2.50m 1.80m

Table 9 Erection tolerances


1.30m
1.30m 2.50m 1.80m
Feature

1.30m
Standards Vertical to within ± 20mm in 2m (subject to max. deviation of 50mm)
1.30m 2.50m 1.80m

Bay length and width ± 200mm on designated lengths Levl to within ± 20mm in 2m
(subject to max. deviation of 50mm) (1)

Lift height ± 100mm on designated height

250
2500

250
0

0
Nodes <Generally 150mm between coupler centres,
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Bracing <300mm from the node


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

(1)
Note Foot ties may follow the general slope of the ground on which the scaffold is founded.

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Design Loads
The structure detailed on this drawing has been designed to support the following imposed Loads only
* For Soffits:
Self Weight of Concrete ............ 25.0 kN/m³

250
250
HKD-M16

250

250

250
0
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Self Weight of Formwork ............0.50 kN/m²


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Live load......................................1.50 kN/m²
* For Shores: Maximum Allowable leg load = 30kN/ Leg
Foundations / Supports
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

The Client must ensure that the foundations provided are adequate and that they are capable of taking the imposed scaffold loads.
Where Brogan Group equipment is supported, anchored, suspended or tied to an existing structure or the ground, the Client must
ensure that the structure is adequate to safely support the additional imposed loads.

250
2500

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Maximum Calculated Leg Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . kN


1.30m 1.30m
Maximum Lift Height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Tying
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Ties on Plan, Elevation and Section are denoted thus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The Client is to ensure that no ties or braces are removed without the approval of Brogan Group.
HKD-M16
All ties to be fixed with load-bearing couplers.
Where proprietary anchors are specified they should be fixed and tested in accordance with the manufacturers recommendations.
Making good of tie locations by client

250
2500

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Maximum anchor load = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.10 kN


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Assumptions
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
.The
. . . following
. . . . . . . .assumptions
. . . . . . . . . . affecting
. . . . . . . .the
. . use
. . . of
. . equipment
. . . . . . . . . shown
. . . . . . on
. . .this
. . .drawing
. . . . . . .have
. . . .been
. . . . made.
............................ ...
Permanent Structure
Brogan Group cannot and will not pass comment on the building structure being scaffolded as this involves matters beyond our knowledge.
It is the clients responsibility to ensure that the existing structure can safely withstand all additional imposed loads from scaffold structure

250
2500

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
Sheeting/Fans
No wind protection, sheeting or fans etc. to are to be added to the scaffolding structure unless otherwise stated on this drawing or
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

agreed with Brogan Group.


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
HKD-M16

Modifications
No alterations to components, assembly, loading or any other aspect are to be made to the scaffold structure detailed on this
drawing except by Brogan Group employees authorised to do so.

250

250
2500

250

250

250
0
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Dimensions
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Written dimensions shall take precedence over scaled dimensions.
The contractor should verify all site dimensions and notify Brogan Group of any discrepancies.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
The contractor is responsible for accurate setting out dimensions of the position of the scaffold structure.

Drawing Status
Working Drawing - for construction purposes.
Preliminary Drawing - should not be used for construction

250

250
2500

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Permits
The Client is responsible for obtaining all permits and permissions necessary prior to construction.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

All ancillary work to scaffolds e.g. hoarding, lighting, baulk timber, plykentledge etc to be supplied by the Client.
HKD-M16

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Inspection: The scaffold must be inspected by the Client at 7No. day intervals (Statuatory Inspection) .
CDM Regulations and Obligations
Brogan Group drawing constitutes Design Risk assessment in accordance with Regulation 11 of CDM Regulations 2007.

250

250
2500

250

250

250
0
0
Refer to relevant Guides Codes and HSE publications for guidance of elimination of general risk in use of temporary works

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

and good practice. Wherever possible risk is designed out of this proposal
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Erection
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Scaffold erected in accordance with SG4:15

Temporary Handrails have been omitted for clarity


0
Drawing to be read in conjunction with Method statement and Risk Assessment

250

250
250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

HKD-M16
TG4:11
6.4 TEST PROCEDURES
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Hilti M16 HKD


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Table of proof test sample M16 Ringbolt


anchor
tie
Total ties number of
250

250
2500

250

250

250
0
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

on the job proof test


1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

0 - 60 3
Butt
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
tube
61 - 100 5

0
101 - 120 6
250

250

HKD-M16

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

121 - 140 7
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Tie tube
141 - 160 8 through ring
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

161 - 180 9

181 - 200 10 TIE DETAIL


250

250

2500

250

250

250
0
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
200 - 220 11 PROOF TEST TO 7.60kN
1.30m 1.30m
221 - 240 12 PRELIMINARY TEST LOAD TO 12.20kN
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

HKD-M16

50mm Min. 50mm Min.


250

250

250

250

250

250
0

0
1200mm 1200mm 1200mm
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

51250.0000
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
150mm Max. 150mm Max.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
250

250

2500

250

250

250
0
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
HKD-M16

0
250

250

250

1200 1200 1200

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

Maximum
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500

250

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

2.40
HKD-M16

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

UNIT BEAM
0
LACING & BRACING DETAIL
250

250

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

STANDARD 3.9m BOARD


TRANSOM SUPPORT DETAIL
2500

250

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

+ 100mm Tollerance in accordance with TG20 Table 8


HKD-M16

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

0
250

250

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500

250

250

250

250

250
0

0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

WORKING
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m

1.30m

1.30m
DRAWING
1.30m 1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500

1.30m

1.30m

1.30m

1.30m

1.30m 1.30m

1.30m

REV. AMENDMENTS BY DATE


250
0

1.30m

BRO G A N
1.30m

1.30m

1.30m
GROUP
1303 GROSVENOR TOWER BUSINESS TOWER
TECOM DUBAI
UNITED ARAB EMIRATES

www.brogangroup.com

SECTION A SECTION B Title:

ACCESS SCAFFOLDING
USING CUPLOCK SYSTEM
SECTION A & B

Customer:

Design Based Hazards actively eliminated where possible in


AL TATWEER CONTRACTING LLC
the Design Process. Where Hazards cannot be eliminated, this
symbol on the drawing with an attached note means: Depot: Scale:

1. Design Based Hazards Exists within this proposal NTS


2. Action is required by the person supervising the
work to manage the design Hazards during construction Prepd By: Date: Drg. No:
In accordance with Brogan Group Procedures the PERSON SUPERVISING DS 30-OCT-2017
the construction MUST CONTACT the Design Office, BEFORE
WORK COMMENCES, for CLARIFICATION of the Identified Hazards Approved By: Pages: BG-DWG-2017-0171-R1
--- 02 OF 02