TRANSOM SPACING
BS 1139* Metal scaffolding
BS EN 1999-1-1-4:2005 + A1:2010
BS EN 12811-1:2003 Temporary works equipment: Scaffolds - Performance requirements and general design
1.30m
1.30m
1.30m
2.50m
2.50m
1.80m
1.80m
BS EN 13374:2004 Temporary Edge Protection Systems - Product Specification, test methods
BS 5975: 2008 Code of practice for temporary works procedures and the permissible stress design of falsework.
1.30m
1.30m 2.50m 1.80m
TG20:08
250
250
250
0
0
1.30m
1.30m 2.50m 1.80m
1.30m
Standards Vertical to within ± 20mm in 2m (subject to max. deviation of 50mm)
1.30m 2.50m 1.80m
Bay length and width ± 200mm on designated lengths Levl to within ± 20mm in 2m
(subject to max. deviation of 50mm) (1)
250
2500
250
0
0
Nodes <Generally 150mm between coupler centres,
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
(1)
Note Foot ties may follow the general slope of the ground on which the scaffold is founded.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Design Loads
The structure detailed on this drawing has been designed to support the following imposed Loads only
* For Soffits:
Self Weight of Concrete ............ 25.0 kN/m³
250
250
HKD-M16
250
250
250
0
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
The Client must ensure that the foundations provided are adequate and that they are capable of taking the imposed scaffold loads.
Where Brogan Group equipment is supported, anchored, suspended or tied to an existing structure or the ground, the Client must
ensure that the structure is adequate to safely support the additional imposed loads.
250
2500
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Tying
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Ties on Plan, Elevation and Section are denoted thus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The Client is to ensure that no ties or braces are removed without the approval of Brogan Group.
HKD-M16
All ties to be fixed with load-bearing couplers.
Where proprietary anchors are specified they should be fixed and tested in accordance with the manufacturers recommendations.
Making good of tie locations by client
250
2500
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Assumptions
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
.The
. . . following
. . . . . . . .assumptions
. . . . . . . . . . affecting
. . . . . . . .the
. . use
. . . of
. . equipment
. . . . . . . . . shown
. . . . . . on
. . .this
. . .drawing
. . . . . . .have
. . . .been
. . . . made.
............................ ...
Permanent Structure
Brogan Group cannot and will not pass comment on the building structure being scaffolded as this involves matters beyond our knowledge.
It is the clients responsibility to ensure that the existing structure can safely withstand all additional imposed loads from scaffold structure
250
2500
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
Sheeting/Fans
No wind protection, sheeting or fans etc. to are to be added to the scaffolding structure unless otherwise stated on this drawing or
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Modifications
No alterations to components, assembly, loading or any other aspect are to be made to the scaffold structure detailed on this
drawing except by Brogan Group employees authorised to do so.
250
250
2500
250
250
250
0
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Dimensions
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Written dimensions shall take precedence over scaled dimensions.
The contractor should verify all site dimensions and notify Brogan Group of any discrepancies.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
The contractor is responsible for accurate setting out dimensions of the position of the scaffold structure.
Drawing Status
Working Drawing - for construction purposes.
Preliminary Drawing - should not be used for construction
250
250
2500
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Permits
The Client is responsible for obtaining all permits and permissions necessary prior to construction.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
All ancillary work to scaffolds e.g. hoarding, lighting, baulk timber, plykentledge etc to be supplied by the Client.
HKD-M16
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Inspection: The scaffold must be inspected by the Client at 7No. day intervals (Statuatory Inspection) .
CDM Regulations and Obligations
Brogan Group drawing constitutes Design Risk assessment in accordance with Regulation 11 of CDM Regulations 2007.
250
250
2500
250
250
250
0
0
Refer to relevant Guides Codes and HSE publications for guidance of elimination of general risk in use of temporary works
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
and good practice. Wherever possible risk is designed out of this proposal
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Erection
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Scaffold erected in accordance with SG4:15
250
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
HKD-M16
TG4:11
6.4 TEST PROCEDURES
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
250
2500
250
250
250
0
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
0 - 60 3
Butt
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
tube
61 - 100 5
0
101 - 120 6
250
250
HKD-M16
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
121 - 140 7
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Tie tube
141 - 160 8 through ring
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
161 - 180 9
250
2500
250
250
250
0
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
200 - 220 11 PROOF TEST TO 7.60kN
1.30m 1.30m
221 - 240 12 PRELIMINARY TEST LOAD TO 12.20kN
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
HKD-M16
250
250
250
250
250
0
0
1200mm 1200mm 1200mm
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
51250.0000
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
150mm Max. 150mm Max.
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
250
250
2500
250
250
250
0
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
HKD-M16
0
250
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
Maximum
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2.40
HKD-M16
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
UNIT BEAM
0
LACING & BRACING DETAIL
250
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
0
250
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500
250
250
250
250
250
0
0
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
WORKING
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
1.30m
1.30m
DRAWING
1.30m 1.30m 1.30m
1.30m 2.50m 1.80m 1.30m 1.30m 1.80m 1.30m 1.30m
2500
1.30m
1.30m
1.30m
1.30m
1.30m 1.30m
1.30m
1.30m
BRO G A N
1.30m
1.30m
1.30m
GROUP
1303 GROSVENOR TOWER BUSINESS TOWER
TECOM DUBAI
UNITED ARAB EMIRATES
www.brogangroup.com
ACCESS SCAFFOLDING
USING CUPLOCK SYSTEM
SECTION A & B
Customer: