6 - 7 - Tipski Poprečni Profil U Tunelima

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

osa tunela PROJEKTOVAO : NAPOMENE REVIZIJA

PROJEKTNI TIM: VER. DATUM REVIDENT PROVJ. ODOBRIO OPIS


PROVJERIO:

ODOBRIO:

VER. 1 R 1:50 DATUM 2016/03/25


KORISNIK: KOD PROJEKTA: EuropeAid/135144/DH/SER/BA 6.7

NAZIV PROJEKTA:

Projektovao:

IPSA
INSTITUT Nacionalni program Evropske Unije
IPA 2012 za Bosnu i Hercegovinu pod IPA
IPSA Institut d.o.o. Egis Rail This project is funded
Sarajevo by European Union institucija za 2012

DESIGNED BY NOTES REVISIONS


DESIGN TEAM: CHECKED APPROVED
ISSUE DATE MADE BY BY BY DESCRIPTION
CHECKED BY

APPROVED BY

ISSUE 1 SCALE 1:50 DATE 2016/03/25


BENEFICIARY PROJECT CODE EuropeAid/135144/DH/SER/BA DRAWING NUMBER 6.7
BiH Railways Public Corporation (BHRPC), PROJECT TITLE DRAWING TITLE
P.C. Railways of FBiH LLC (RFBiH) Provision of preliminary designs and studies for removing
the railway traffic bottleneck occurring at "Ivan-Bradina" Typical tunnel profile

Designed by

IPSA National Programme


INSTITUT For Bosnia and Herzegovina under the IPA
Transition Assistance and Institution
IPSA Institut d.o.o. Egis Rail This project is funded Building Component for the year 2012
Sarajevo by European Union

You might also like