BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location: Obsygin Lt.GF Reference drawing
: S-07 No.
Total :1 BBS No. :1
Grade Rebar (Fy)
:
:
Unit
Sub Total Length Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Weight Remarks
m' Weight kg
kg/m'
156 8208 156
1 13 29 8.520 247.08 1.04 257.429

156 11844
2 13 54 12.000 648 1.04 675.141

156 894
3 13 26 1.050 27.3 1.04 28.443

156 5034
4 13 27 5.190 140.13 1.04 145.999

100
5 100 10 378 0.300 113.4 0.62 69.911
100

6 1240 10 137 1.240 169.88 0.62 104.731

7 1150 10 111 1.270 140.97 0.62 86.908


120

Total Weight 1,368.563


Grand Total Weight 1,368.563