HFMW Cooling Tower Questions

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Cell Description

B4 Tower Type (open/closed)


D4 Remaining Equipment Life (in years)
D5 Unscheduled Downtime to Replace Tower (in hours)
D6 Estimated Tower Replacement Cost, including installation in US dollars
C7 Tower Production Capacity
B10 Years between piping replacement
B11 Cost of Piping Replacement
B12 Downtime for Piping Replacement
D10 Years between tube/fill replacement
D11 Cost of Tube Fill Replacement
D12 Downtime for Tube Fill Replacement
D15 Annual hours of operation
D16 Revenue Lost When Tower offline ($/hour)
B19 Number of Fan Motors
D19 Fan Motor Horsepower
B20 Number of Sump Pumps
D20 Pump Horsepower
D21 Electricity Cost (US Dollars / kilowatt hr)
B22 Blowdown Frequency (per month)
D22 Gallons per Blowdown
D23 Potable Water Cost
D25 Sewage Water Cost
D26 10% Side Stream Filtration (50 Micron)
D28 Total Cost of Chemicals (annual)
D31 Maintenance Cost (annual)
G19 Cost of Capital
What is the outer diameter of the main pipe feeding your tower?
What is the outer diamteter of the pipe feeding the chiller inside the building?
Please supply any photos of the tower and scale issues
Explanation
if unsure, insert "open"
number of years in towers expected lifespan, if unsure insert 20
estimated hours of production downtime to replace tower, if unsure insert 72
cost of tower plus installation, if unsure insert $50,000
choose the tower production capacity measurement from the selection options, if unsure insert "unknown"
if unsure, insert 10
cost to replace due to wear and tear plus labor cost, if unsure insert $5000
number of hours production would be down, if unsure insert 48
number of years typically between tube replacements, if unsure insert 10
if unsure, insert $5000
number of hours production would be down, if unsure insert 48
number of hours per year, if unsure insert 4380
dollar amount in revenue lost when tower is offline, if unsure insert 1000
between 1-100, this is a critical field
select the fan motor horsepower from the selection options, this is a critical field
between 1-50

this is a criticial field


this is a criticial field
enter typical gallons used per blowdown
enter cost per hundred cubic feet (hcf) for potable water, this is a critical field
enter cost per hundred cubic feet for sewage (typically 3-4 times the amt of potable water)
Yes or No?
cost of chemicals used per year, this is a critical field
this is a criticial field
choose the cost of capital percentage from the selection options, if unsure insert 10%

ide the building?


Answer

You might also like