This document contains information about a cooling tower including its type, remaining life, replacement costs, production capacity, maintenance schedules, costs and downtime. Key specifications include tower type, fan motor horsepower, pump horsepower, annual chemical and maintenance costs, revenue lost per hour offline, and cost of capital. Photos of any scale issues are also requested.
Abraham Mehari Haile A Tradition in Transition, Water Management Reforms and Indigenous Spate Irrigation Systems in Eritrea PHD, UNESCO-IHE Institute For Water Education
This document contains information about a cooling tower including its type, remaining life, replacement costs, production capacity, maintenance schedules, costs and downtime. Key specifications include tower type, fan motor horsepower, pump horsepower, annual chemical and maintenance costs, revenue lost per hour offline, and cost of capital. Photos of any scale issues are also requested.
This document contains information about a cooling tower including its type, remaining life, replacement costs, production capacity, maintenance schedules, costs and downtime. Key specifications include tower type, fan motor horsepower, pump horsepower, annual chemical and maintenance costs, revenue lost per hour offline, and cost of capital. Photos of any scale issues are also requested.
This document contains information about a cooling tower including its type, remaining life, replacement costs, production capacity, maintenance schedules, costs and downtime. Key specifications include tower type, fan motor horsepower, pump horsepower, annual chemical and maintenance costs, revenue lost per hour offline, and cost of capital. Photos of any scale issues are also requested.
D4 Remaining Equipment Life (in years) D5 Unscheduled Downtime to Replace Tower (in hours) D6 Estimated Tower Replacement Cost, including installation in US dollars C7 Tower Production Capacity B10 Years between piping replacement B11 Cost of Piping Replacement B12 Downtime for Piping Replacement D10 Years between tube/fill replacement D11 Cost of Tube Fill Replacement D12 Downtime for Tube Fill Replacement D15 Annual hours of operation D16 Revenue Lost When Tower offline ($/hour) B19 Number of Fan Motors D19 Fan Motor Horsepower B20 Number of Sump Pumps D20 Pump Horsepower D21 Electricity Cost (US Dollars / kilowatt hr) B22 Blowdown Frequency (per month) D22 Gallons per Blowdown D23 Potable Water Cost D25 Sewage Water Cost D26 10% Side Stream Filtration (50 Micron) D28 Total Cost of Chemicals (annual) D31 Maintenance Cost (annual) G19 Cost of Capital What is the outer diameter of the main pipe feeding your tower? What is the outer diamteter of the pipe feeding the chiller inside the building? Please supply any photos of the tower and scale issues Explanation if unsure, insert "open" number of years in towers expected lifespan, if unsure insert 20 estimated hours of production downtime to replace tower, if unsure insert 72 cost of tower plus installation, if unsure insert $50,000 choose the tower production capacity measurement from the selection options, if unsure insert "unknown" if unsure, insert 10 cost to replace due to wear and tear plus labor cost, if unsure insert $5000 number of hours production would be down, if unsure insert 48 number of years typically between tube replacements, if unsure insert 10 if unsure, insert $5000 number of hours production would be down, if unsure insert 48 number of hours per year, if unsure insert 4380 dollar amount in revenue lost when tower is offline, if unsure insert 1000 between 1-100, this is a critical field select the fan motor horsepower from the selection options, this is a critical field between 1-50
this is a criticial field
this is a criticial field enter typical gallons used per blowdown enter cost per hundred cubic feet (hcf) for potable water, this is a critical field enter cost per hundred cubic feet for sewage (typically 3-4 times the amt of potable water) Yes or No? cost of chemicals used per year, this is a critical field this is a criticial field choose the cost of capital percentage from the selection options, if unsure insert 10%