AUR: AUR:
NOTE: Date: 11 Aug 2022
GENERAL NOTES:
SHOP DRAWING
Reinforcing as per site Reinforcing as per site
STEEL STRUCTURE ELEMENTS ARE SHOWN
SCHEMATICALLY. 1. ALL DIMENSIONS ARE IN MILLIMETERS
UNO.
3.
LEAN CONCRETE: 10MPa
MINIMUM CONCRETE COVER: JKT02
AUR: INTERNAL STRUCTRE :
COLUMNS: 40mm
Datacenter Indonesia
Please ensure this is
Karawang International Industrial City (KIIC)
BEAMS: 40mm
WALLS: 40mm West Java, Indonesia
consistent with the SLABS & STAIRCASES: 40mm
EXTERNAL STRUCTURE OR IN CONTACT Engineer
drawing content.
WITH SOIL:
COLUMNS: 50mm
BEAMS: 50mm
WALLS: 50mm
SLABS & STAIRCASES: 50mm 152 Beach Rd, #16-00 Gateway East, Singapore 189721
PILECAPS: 75mm Note :
Status
Signature : Date :
Architect
AUR: Status
Rejected
AUR:
Reinforcing as per site
instruction from Herdi. Status
Signature : Date :
General Contractor
Drawn By
E.W.
Checked By
FB-1-133
FB-1-001
FB-1-146
M.T.
FB-1-002 FB-1-003 FB-1-004 FB-1-005 FB-1-006 FB-1-007 FB-1-008 FB-1-009 FB-1-010 FB-1-011
I Revisions
FB-1-243
FB-1-145
FB-1-157
FB-1-168
FB-1-179
FB-1-190
FB-1-201
FB-1-212
FB-1-223
FB-1-234
FB-1-132
No. Date Description
FB-1-144
FB-1-156
FB-1-167
FB-1-178
FB-1-200
FB-1-211
FB-1-222
FB-1-233
G-1
FB-1-189
FB-1-131
FB-1-242
FB-1-022 FB-1-023 FB-1-024 FB-1-025 FB-1-026 FB-1-027 FB-1-028 FB-1-029 FB-1-030 FB-1-031
G
FB-1-143
FB-1-155
FB-1-166
FB-1-177
FB-1-188
FB-1-199
FB-1-210
FB-1-221
FB-1-232
F-1
FB-1-130
Reference Drawing
FB-1-241
FB-1-032 FB-1-033 FB-1-034 FB-1-035 FB-1-036 FB-1-037 FB-1-038 FB-1-039 FB-1-040 FB-1-041
No. Dwg. No.
FB-1-142
FB-1-154
FB-1-165
FB-1-176
FB-1-187
FB-1-198
FB-1-209
FB-1-220
FB-1-231
1 JKT02-S-C-110-1
F 2 JKT02-S-D-110-1
3 JKT02-S-F-112-1
E-1 FB-1-043 FB-1-044 FB-1-045 FB-1-046 FB-1-047 FB-1-048 FB-1-049 FB-1-050 FB-1-051 FB-1-052 4 JKT02-S-F-160-0
FB-1-240
5 JKT02-S-F-161-0
FB-1-141
FB-1-153
FB-1-164
FB-1-175
FB-1-186
FB-1-197
FB-1-208
FB-1-219
FB-1-230
FB-1-129
6 JKT02-S-F-162-0
7 JKT02-S-F-171-0
8 JKT02-S-F-172-0
FB-1-053 FB-1-054 FB-1-055 FB-1-056 FB-1-057 FB-1-058 FB-1-059 FB-1-060 FB-1-061 FB-1-062 9 JKT02-S-F-173-0
E
FB-1-239
FB-1-140
FB-1-152
FB-1-163
FB-1-174
FB-1-185
FB-1-196
FB-1-207
FB-1-218
FB-1-229
FB-1-128'
10 JKT02-S-F-174-0
11 JKT02-S-F-175-0
12 JKT02-S-F-176-0
FB-1-063 FB-1-064 FB-1-065 FB-1-066 FB-1-067 FB-1-068 FB-1-069 FB-1-070 FB-1-071 FB-1-072
D
Key Plan
FB-1-139
FB-1-151
FB-1-162
FB-1-173
FB-1-184
FB-1-195
FB-1-206
FB-1-217
FB-1-228
FB-1-238
FB-1-128
FB-1-073 FB-1-074 FB-1-075 FB-1-076 FB-1-077 FB-1-078 FB-1-079 FB-1-080 FB-1-081 FB-1-082
FB-1-138
FB-1-150
FB-1-161
FB-1-172
FB-1-194
FB-1-183
FB-1-205
FB-1-216
FB-1-227
C-1
FB-1-127
FB-1-083 FB-1-084 FB-1-085 FB-1-086 FB-1-087 FB-1-088 FB-1-089 FB-1-090 FB-1-091 FB-1-092
FB-1-237
C
FB-1-137
FB-1-149
FB-1-160
FB-1-171
FB-1-182
FB-1-193
FB-1-204
FB-1-215
FB-1-226
B-2 0 4 8 12 16 20
FB-1-093 FB-1-094 FB-1-095 FB-1-096 FB-1-097 FB-1-098 FB-1-099 FB-1-100 FB-1-101 FB-1-102
FB-1-236
m NORTH
FB-1-126
FB-1-181
FB-1-136
FB-1-148
FB-1-192
FB-1-203
FB-1-214
FB-1-225
FB-1-159
FB-1-170
Drawing Title
COLO 1
B-1 FOUNDATION BEAMS
FB-1-103 FB-1-104 FB-1-105 FB-1-106 FB-1-107 FB-1-108 FB-1-109 FB-1-110 FB-1-111 FB-1-112 REINFORCEMENT
B SHEET 28 of 28
FB-1-125
FB-1-135
FB-1-158
FB-1-169
FB-1-180
FB-1-191
FB-1-202
FB-1-213
FB-1-224
FB-1-235
Scale at A1
FB-1-147
1/25
Discipline
STRUCTURE
FB-1-113 FB-1-114 FB-1-115 FB-1-116 FB-1-117 FB-1-118 FB-1-119 FB-1-120 FB-1-121 FB-1-122
Suitability
A
FB-1-134