NOTES:
EXIST.R.L. 3940 OVERALL
PROP. RAIL LEVEL
3.05 mt. SLAB AS PER RDSO 1) ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS ARE IN METERS.
EXIST.F.L.
PROP. FORMATION LEVEL PROP. FORMATION LEVEL 2) NO DIMENSIONS SHALL BE SCALED FROM THIS DRAWING ONLY WRITTEN
EXIST. SOFFIT LVL. PROP. SOFFIT OF SLAB PROP. BOTTOM OF SLAB DIMENSIONS SHOULD BE FOLLOWED.
3050 CLEAR 3) BACK FILL MATERIAL SHALL CONSIST OF GRANULAR MATERIALS OF
3390 EFFECTIVE GW,GP,SW GROUP AS PER I.S.1498-1970.
4) EXISTING WORK IS SHOWN IN BLACK.
5) PROPOSED WORK IS SHOWN IN.RED.
BED LEVEL 6) EXISTING WORK TO BE DISMANTLED SHOWN IN GREEN.
BED LEVEL BED LEVEL
7) THIS DRAWING IS INDICATIVE AND FOR GUIDANCE PURPOSE ONLY.IT DOES
NOT INDICATE SCOPE OF WORK, WHICH SHALL BE AS PER DEFINED SCOPE IN
THE CONTRACT DOCUMENT.
F2 B F1
150
B
1115
F2
CL OF PROP.LINE
4800 WIDTH OF SLAB
T/C
BED LEVEL
CL OF .EXISTING TRACK
STATION STATION
4500
1676
C/L OF PROP. LINE
DISTANCE BETWEEN EXIST. & PROP. TRACK
DISMANTLING
CLEARANCE
SITE PLAN
150
(NOT TO SCALE)
EXIST.OPENING
SLAB
C/L OF EXIST. LINE
C
TO PQR TO XYZ
H.F.L.
CLEARANCE GENERAL ARRANGEMENT DRAWING
WESTERN RAILWAY
EX.SOFFIT OF SLAB
BED LEVEL
FLS FOR (B.G.) DOUBLING FROM RAJKOT TO KANALUS
FLOW