7. PUMP 35.0 BBLS 14.0 PPG SPACER AHEAD, PUMP 68 BBLS, 383SX, 17.0 PPG "G" NEAT CMT
SLURRY, PUMP 5.0 BBLS 14.0 PPG SPACER BEHIND, DISPLACE CMT W/53 BBLS 11.5 PPG SSM (2.0
BBLS UNDER DISPLACEMENT, POOH SLOWLY 10.0 STANDS TO AVOID DISTURBING THE PLUG.
** KEEP PIPE ROTATING WHILE SPOTTING CMT PLUG.
8. CIRC 1-1/2 HOLE CAPACITY.
9. POOH, AND LD CMT DIVERTER.
2-Cement procedure
l.c
Performing cement job as following:
1. Pump 40 bbl sea water as a spacer ahead (using cmt unit).
2. Test cmt line to 4000 psi for 10 min.
oi
3. Cont Pump 40 bbl sea water as a spacer ahead (using cmt unit)
4. Drop red bottom plug.
5. Mix & Pump 226 bbl lead cmt slurry 514 sx “G” neat, weight 12 ppg with cmt additives as
per lab test.
6. Mix & Pump 102 bbl tail cmt slurry 500 sx “G” neat, weight 16 ppg with cmt additives as per
lab test.
7. Drop black top plug
8. Pump 20 bbl seawater as a spacer behind.
9. Switch line to rig pumps and displace cmt w/344 bbl spud mud 10.2 ppg (AVG. rate 6 BPM),
last 10 bbl reduce displace rate to 2 BPM.
* Final displacement press = psi
* Bump plug with 500 psi over F.D.P = psi
* monitor loss while pump cmt & displacement.
* check float equipment.
* At last 40 bbl displacement open the wing valve on 30” conductor, then keep it open.
10. R/D cmt line. With neutral csg wt, Back out running tool 3 turns to the right to open wash
ports. R/U cmt line. Circulate out cmt with seawater from tank # 4 at high rate (20 BPM).
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
12. Retighten running tool with 3 turns to lift to close wash ports & Re-torque with 2000 ft-lb,
test 13-3/8” csg to 2000 psi for 10 min.
15. Rough cut 13-3/8” csg through conductor windows. L/D csg cut off.
16. R/D handling tool. N/D flow line & 30” bell nipple.
18. Final cut 30” csg & L/D cut off & 30” swage.
19.
20.
21.
Centralized 13-3/8” csg in 30” conductor.
om
P/U cooled csg cutter & final cut 13-3/8” csg above conductor support.
P/U 5” cmt diverter on 5” DP, run to MLH @ 249’ RKB. Circ at high rate to ensure the landing
profile inside 13-3/8” hanger is free of cmt. Pooh with cmt diverter & L/D same.
l.c
22. Install and weld Braden head using Hothead technique test same to 1000 psi.
Cement procedure
Performing cement job as following:
25. Pump 40 bbl sea water as a spacer ahead (using cmt unit).
26. Test cmt line to 4000 psi for 10 min.
27. Cont Pump 40 bbl sea water as a spacer ahead (using cmt unit)
28. Drop red bottom plug.
29. Mix & Pump 226 bbl lead cmt slurry 514 sx “G” neat, weight 12 ppg with cmt additives as
per lab test.
30. Mix & Pump 102 bbl tail cmt slurry 500 sx “G” neat, weight 16 ppg with cmt additives as per
lab test.
31. Drop black top plug
32. Pump 20 bbl seawater as a spacer behind.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
33. Switch line to rig pumps and displace cmt w/344 bbl spud mud 10.2 ppg (AVG. rate 6 BPM),
last 10 bbl reduce displace rate to 2 BPM.
* Final displacement press = psi
* Bump plug with 500 psi over F.D.P = psi
* monitor loss while pump cmt & displacement.
* check float equipment.
* At last 40 bbl displacement open the wing valve on 30” conductor, then keep it open.
34. R/D cmt line. With neutral csg wt, Back out running tool 3 turns to the right to open wash
ports. R/U cmt line. Circulate out cmt with seawater from tank # 4 at high rate (20 BPM).
Cont circ until no cmt return.
Note: Mud Eng. Will is monitoring any return cmt back to the surface.
36. Retighten running tool with 3 turns to lift to close wash ports & Re-torque with 2000 ft-lb,
test 13-3/8” csg to 2000 psi for 10 min.
38.
39.
40.
om
Cut windows in 30” conductor csg 4 ft above conductor support.
Rough cut 13-3/8” csg through conductor windows. L/D csg cut off.
R/D handling tool. N/D flow line & 30” bell nipple.
44. P/U cooled csg cutter & final cut 13-3/8” csg above conductor support.
oi
45. P/U 5” cmt diverter on 5” DP, run to MLH @ 249’ RKB. Circ at high rate to ensure the landing
profile inside 13-3/8” hanger is free of cmt. Pooh with cmt diverter & L/D same.
46. Install and weld Braden head using Hothead technique test same to 1000 psi.
Cement procedure
Performing cement job as following:
49. Test cmt line to 4000 psi for 10 min.
50. Pump 80 bbl sea water as a spacer ahead (using cmt unit W/6 BPM)
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
57. S/d 13-3/8" casing, if no movement, WELD 24” conductor pad eyes and cold cut 24"
om
conductor, then hang up diverter system and cold cut 13-3/8" casing.
61. Install & weld 13-5/8" 3m slip on type casing head housing using hot head
technique. Press. Test b.head to 150 psi with N2 (equiv. To 1500 psi w/liquid),
62. N/U BOP,S, TEST BOP’S
AFTER ABANDONMENT OF SLOT # 2,B (GS-184-3 WELL) AND CREATION A NEW SLOT
(SLOT # 11) TO DRILL GS184-5 (LULI) WELL, THE SUBJECTED PLATFORM HAS SOME
HATCHES OPEN AND SOME GRATINGS REMOVED WHICH RESULT IN UNSAFE WORKING
AREA, SO NEED PROJECTS TO TAKE THE MEASUREMENTS AND FABRICATE THE
FOLLOWING REQUIREMENTS:
HELIDECK:
• HATCH COVER FOR SLOT # 11 (GS184-5 WELL).
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PRODUCTION DECK:
• HATCH COVER FOR SLOT # 2 (GS184-3 WELL).
SPIDER DECK:
• HATCH COVER FOR SLOT # 2 (GS184-3 WELL).
•
• om
GRATINGS AROUND GS 184-5 WELL
NOTE: WILL NEED TO WELD BEAMS TO SUPPORT GRATINGS AND PLATES.
NAPESCO SPIRO TORQUE HAD RUN IN DRILL STRING IN CONJUNCTION WITH 12-1/4”
STEERABLE ASSEMBLY (ANADRILL MOTOR) AT DEPTH 8580’ ( S. GHARIB FORMATION)
l.c
AND PULLED OUT AT DEPTH 12010 (9-5/8” CASING POINT IN THEBES FORMATION), A 35
EACH SPIRO TORQUE ARE SPACED OUT ONE EVERY OTHER STAND OF DP, STARTED AT
TOP OF FIRST STAND OF DP ABOVE HWDP, WHILE THE DRILLING, IT NOTICED THAT WHEN
oi
SWEEP HOLE PERIODICALLY WITH HI-VIS PILLS, THE AMOUNT OF CUTTINGS WHICH COME
WITH HI-VIS PILL OVER SHALE SHAKER IS NOT MORE SIGNIFICANT AND VERY CLOSE TO
THE NORMAL CUTTINGS OVER SHALE SHAKER AND ALSO HAD NORMAL DRAG WHILE THE
CONNECTION AND STEADY OFF BOTTOM TORQUE, THAT MEANS THE MOST ADVANTAGE
OF SPIRO TORQUE IS HELP IN HOLE CLEANING, BUT THERE ARE SOME DISADVANTAGES:
1. IN SLIDE MODE, IT IS HARD TO ADJUST TOOL FACE OF MOTOR DUE TO SPIRO
TORQUE TRAP TORQUE IN THE STRING AND RELEASE IT SUDDENLY WHILE
DRILLING WHICH MAKE HARD TO CONTROL TOOL FACE.
2. MORE CONNECTIONS IN DRILL STRING, WHICH INCREASE TIME OF TRIP.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PLAN
1. CONTINUE RIH TO 11,000 FT.
5. TEST CSG TO 650 PSI WITH 13.6 PPG OBM (EQUIV TO 3000 PSI SW), HOLD PRESSURE FOR 10 MIN’S. APPLY
LEAK OFF TEST PROCEDURES WHILE TEST.
6. DRILL OUT PLUGS, AND F/C F/11857’ TO 11858’ 40 RPM, 300-400 GPM & 15/20 WOB, RECORD TIME OF
DRILLING PLUGS & F/C .
7. DRILL OUT CEMENT TO 11980’ (20 FT ABOVE SHOE), RECORD STATUS OF CEMENT (SOFT, GREEN, HARD),
TIME OF DRILLING CEMENT AND REQUIRED WOB.
8.
9.
om
PUMP 50 BBL’S HI-VIS PILL & CIRCULATE HOLE CLEAN & CONDITION MUD IN & OUT 13.6 PPG.
10. IF LAST DRILLED CEMENT IS HARD, TEST CSG TO 650 PSI (EQUIV TO 3000 PSI S.W) HOLD PRESSURE FOR 10
MIN’S, IF CEMENT IS SOFT, DO NOT TEST & CALL CO. MAN.
15. DRILL OUT RAT HOLE F/ 12000 TO 12010’. WORK BIT THROUGH SHOE.
16. PULL STRING INSIDE SHOE & OBSERVE HOLE FOR 10 MINS.
17. BREAK BIT WITH 5K LBS WOB & 350 GPM FOR 15 MIN’S, INCREASE WOB GRADUALLY TO MAXIMUM 35K
LBS & GPM TO 450 AND DRILL 8-1/2” SECTION.
PLAN
1. CONTINUE RIH TO 13300’. SLOW TRIPPING SPEED TO MINIMUM WHILE PASS THROUGH TOP OF 7” LINER @
11563’
2. WASH DOWN & TAG CEMENT (EXPECTED @ 13484’) RECORD ACTUAL TOP OF CEMENT.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
5. TEST CSG TO 1500 PSI WITH 11.4 PPG OBM (EQUIV TO 3000 PSI SW), HOLD PRESSURE FOR 10 MIN’S. APPLY
LEAK OFF TEST PROCEDURES WHILE TEST.
6. DRILL OUT PLUG, AND F/C F/13646’ TO 13648.5’ WITH 40 RPM, 200-250 GPM & 10/20 WOB, RECORD TIME
OF DRILLING PLUG & F/C .
7. DRILL OUT CEMENT TO 13725’ (20 FT ABOVE SHOE), RECORD STATUS OF CEMENT (SOFT, GREEN, HARD),
TIME OF DRILLING CEMENT AND REQUIRED WOB.
8. CIRCULATE HOLE CLEAN & CONDITION MUD IN & OUT 11.4 PPG.
10. IF LAST DRILLED CEMENT IS HARD, TEST CSG TO 1500 PSI (EQUIV TO 3000 PSI S.W) HOLD PRESSURE FOR 10
MIN’S, IF CEMENT IS SOFT, DO NOT TEST & CALL CO. MAN. IF TEST IS NOT HOLD CALL CO. MAN.
12. DISPLACE HOLE TO 8.8 OBM (MAXIMUM GPM 240 WHILE DISPLACE) AND CIRCULATE TO CONDITION MUD
IN & OUT 8.8 PPG
17. BREAK BIT WITH 2-3K LBS WOB & 250 GPM FOR 15 MIN’S, INCREASE WOB GRADUALLY TO MAXIMUM 25K
LBS & GPM TO 350 AND DRILL 6” HOLE.
oi
CEMENT 7” LINER
1. CONTINUE RIH WITH 7” LINER & WASH DOWN LAST 5 STANDS TO BOTTOM. BAKER
ENGINEER TO BE AT RIG FLOOR WHILE WASH DOWN (MAX PRESSURE 500 PSI).
2. RECORD P/U & S/O WEIGHT WITH & WITH OUT PUMP.
3. START CIRCULATE WITH MAX. 500 PSI SURFACE PRESSURE, ROTATE LINER AND RECORD
TORQUE AT 10 & 20 RPM (MAX. TORQUE 750 AMPS)
4. CONTINUE CIRCULATE 450 BBLS (1-1/2 LINER & DP CAPACITY) WITH MAX. 500 PSI SURFACE
PRESSURE, DO NOT RECIPROCATE STRING WHILE ROTATION. MONITOR WELL WHILE
CIRCULATION FOR LOSSES IF THERE ANY CALL CO. MAN, RECORD TORQUE AT 10 & 20 RPM.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
6. L/D LAST JOINT AND M/U TOP DRIVE CEMENT MANIFOLD WITH PUP JOINT.
7. DROP 1-7/16 BALL, CIRCULATE BALL, PRESSURE UP TO 2000 PSI TO SET LINER HANGER.
8. SET FULL LINER WEIGHT (50K LBS) + 30K LBS ON HANGER TO CONFIRM HANGER SET.
9. PRESSURE UP TO 3000 PSI TO RELEASE RUNNING TOOL, BLEED OFF PRESSURE, P/U STRING
WEIGHT + 4 FT, OBSERVE WEIGHT OF LINER LOOSE, CONFIRM TOOL IS FREE FROM HANGER.
10. SLACK DOWN 40K LBS ON HANGER & PRESSURE UP TO 4000 PSI TO RELEASE S.T LANDING
SUB.
12. COMMENCE CIRCULATION & ROTATION WITH 10-20 RPM WHILE MIX CEMENT.
om
14. PUMP 15 BBLS DIESEL AZ PRE-FLUSH FROM CEMENT UNIT WITH 6 BPM.
15. PUMP 30 BBLS SPACER # 11.5 PPG FROM CEMENT UNIT W/ 6BPM.
16. PUMP 92 BBLS # 12.5 PPG SPHERELITE CEMENT WITH RATE 6 BPM.
20. SWITCH LINE TO RIG PUMP & DISPLACE CEMENT WITH 272 BBL’S OBM # 11.3 PPG WITH 6
BPM (3215 STROKES WITH PUMP # 2). D/P WILL LATCH IN 7” WIPER PLUG AFTER PUMPING
206 BBLS (2435 STROKES), REDUCE PUMP RATE AT 2400 STROKES TO 2 BPM WHILE
LATCHING AND LAST 20 BBLS (AFTER 2980 STROKES). MONITOR WEIGHT INDICATOR WHILE
PUMPING.
21. PUMP PLUG WITH 500 PSI OVER FINAL DISPLACEMENT PRESSURE.
22. BLEED OFF PRESSURE TO CMT UNIT & CHECK FLOATS EQUIPMENT.
23. RELEASE SETTING TOOL & P/U 10 FT , SLACK OFF 50K LBS TO SET ZXP PACKER.
24. CLOSE HYDRILL AND TEST BACK SIDE TO 1500 PSI FOR 10 MIN’S USING LEAK OFF TEST
PROCEDURES.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
26. UN-STING FROM HANGER AND REVERSE CIRCULATE 575 BBL’S (2 STRING CAPACITY) WITH
MAX 1500 PSI, MOVE STRING AT ALL TIMES WHILE CIRCULATING. IF PLUG DID NOT PUMP
OR FLOATS DO NOT HOLD OR COULD NOT TEST BACK SIDE DO NOT REVERSE CIRCULATE &
POOH.
om
2. R/U PREMIERE POWER TONG & 7" LINER HANDLING EQUIPMENT.
3. HOLD PRE-JOB SAFETY MEETING AT RIG FLOOR ON HANDLING & RUNNING 7" LINER WITH
ALL INVOLVED PEOPLE, DISCUSS JOB PROCEDURES & RISK ASSESSMENT AND DISTRIBUTE
RESPONSIBILITIES.
l.c
4. P/U & M/U 7" LINER SHOE TRACK (BAKER 7" V-SET FLOAT SHOE, 3 JT OF 7" # 29 PPF, BAKER
LANDING COLLAR), CHECK FLOAT, OK, CONTINUE P/U, M/U & RIH WITH 7", 29 PPF, DST-
110HC, ANTARES TO 9-5/8” WINDOW, P/UP CIRCULATING HEAD, CIRC 1-1/2” LINER
CAPACITY WITH 5 BPM WHILE RECIPROCATE PIPE WITHIN 10 FT. OBSERVE LOSSES WHILE
CIRCULATION, CONTINUE RIH TO 6047', M/U 7" BAKER PLUG HOLDER BUSHING, BAKER
oi
5. CONTINUE RIH W/ 7" LINER ON 5" DP TO 10800 FT. RESTRICT RUNNING SPEED. WASH
DOWN LAST 3 STANDS. BAKER ENGINEER TO BE AT RIG FLOOR WHILE WASH DOWN (MAX
PRESSURE 800 PSI).
NOTE
* FILL D/P AND BREAK CIRC EVERY 10 STANDS.
* RABBIT D/P WHILE RIH.
6. P/U ONE SINGLE JOINT & M/U TOP DRIVE CEMENT MANIFOLD WITH SINGLE JOINT &
CONTINUE WASH DOWN AND TAG BOTTOM, P/U 7” LINER 5 FT OFF BOTTOM.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
9. DROP 1-7/16" BALL, CIRCULATE BALL W/3 BPM, TOTAL PUMPED VOLUME 85 BBL'S. SET
HANGER WITH +/-2000 PSI, SET FULL LINER WEIGHT + 40 KLBS ON HANGER TO CONFIRM
HANGER SET, BLEED OF PRESS. PRESSURE UP TO 3000 PSI TO RELEASE RUNNING TOOL,
BLEED OFF PRESSURE, P/U STRING WEIGHT + 3 FT, CONFIRM LOST LINER WEIGHT (CONFIRM
RUNNING TOOL IS FREE FROM HANGER), RECORD DP FREE TQ. SLACK DOWN 40K LBS ON
HANGER & PRESSURE UP TO 3500 -4000 PSI, BLEED OFF PRESSURE AND KEEP 40 KLBS ON
HANGER. ROTATE LINER TO CHECK W/ 20 RPM.
NOTE: R/UP CMT LINE AND FLUSH SAME WITH SEA WATER AND TEST TO 4000 PSI
11. PUMP 194 BBLS DOWN HOLE VOLUME WEIGHTED 12.5 PPG SURFACE WT (11.12 PPG)
CEMENT WITH RATE 3 BPM.
om
12. DROP 5" DP WIPER PLUG. NOTE FLAG SUB.
13. DISPLACE CEMENT WITH 309 BBLS 12.8 PPG OBM BY CMT UNIT (239 BBLS PUMPED WITH 3
BPM, AND LAST 70 BBLS BY 1 BPM). D/P PLUG WILL LATCH IN 5” WIPER PLUG AFTER
PUMPING 85 BBLS (PUMP 75 BBLS W/3 BPM, AND 10 BBL W/1 BPM WHILE LATCHING),
l.c
INCREASE DISPLACEMENT RATE TO 3 BPM THEN BACK TO 1 BPM LAST 70 BBLS BEFORE
BUMP THE PLUG.
14. BUMP PLUG WITH 500 PSI OVER FINAL DISPLACEMENT PRESSURE.
oi
15. BLEED OFF PRESSURE TO CMT UNIT & CHECK FLOATS EQUIPMENT.
16. RELEASE SETTING TOOL & P/U 10 FT , SLACK OFF 50-60 K LBS TO SET ZXP PACKER FOLLOW
BAKER ENG RECOMMENDATION.
17. CLOSE HYDRIL AND TEST BACK SIDE TO 1500 PSI FOR 10 MIN’S USING LEAK OFF TEST
PROCEDURES.
19. STING OUT FROM HANGER AND REVERSE CIRCULATION 170 BBL’S (2 STRING CAPACITY)
WITH MAX 1500 PSI,
IF PLUG DID NOT BUMP OR FLOATS DO NOT HOLD OR COULD NOT TEST BACK SIDE DO NOT
REVERSE CIRCULATE & POOH.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PLAN
1. P/U & M/U 6” MOTOR ASSY AS PER BHA SHEET
2. P/U & RIH 129 X 3-1/2” HWDP & 5” D/P, BREAK CIRCULATION EVERY 2000’.
4. PUMP 50 BBL’S DIESEL AND DISPLACE HOLE TO 8 PPG OBM WITH 200 GPM WHILE DRILL OUT L/C F/ 5971’ –
5972’, & SHOE TRACK F/ 5972’ – 6058’, F/S F/ 6058’ – 6060’.
NOTE: RECORD STATUS OF CEMENT (SOFT, GREEN, HARD), TIME OF DRILLING CEMENT AND REQUIRED
WOB, DIRECTION ENG TO BE ON RIG FLOOR ALL TIME.
6. SWEEP HOLE WITH 50 BBL’S HI-VIS PILL & CIRCULATE HOLE CLEAN & CONDITION MUD IN & OUT 8 PPG.
7.
8.
om
PULL STRING INSIDE SHOE, OBSERVE HOLE FOR 15 MIN’S, CALL CO. MAN FOR RESULT.
BREAK BIT WITH 2-3K LBS WOB & 200 GPM FOR 15 MIN’S, INCREASE WOB GRADUALLY TO MAXIMUM 25K
LBS & GPM TO 250 AND DRILL 6” HOLE TO TD @ 6800’ RKB.
2. P/U & M/U 35 X 5” HWDP AND STAND BACK IN DERRICK (RABBIT & MEASURE HWDP).
3. CHANGE TOP RAM TO 7” RAM, RETRIEVE WEAR BUSHING, RUN TEST PLUG AND TEST
BONNET SEAL TO 2000 PSI, RUN WEAR BUSHING.
4. MAKE UP BAKER TOP DRIVE PLUG DROPPING MANIFOLD W/ ONE SINGLE 5" DP (API
DRIFTED) & 2 TIW VALVES, LOADED WITH 5” DRILL PIPE WIPER PLUG. PRESSURE TEST
TOP DRIVE MANIFOLD TO 4000 PSI. L/D MANIFOLD.
5. R/U PREMIERE 7” POWER TONGS AND 7” HANDLING EQUIPMENT, CLEAN THREAD OF SHOE
TRACK JOINT WITH BARITE ON THE MAIN DECK.
6. HOLD PER-JOB SAFETY MEETING ON RIG FLOOR ON HANDLING AND RUNNING 7” LINER
WITH ALL INVOLVED PEOPLE.
7. P/U & M/U 7” SHOE TRACK, TWO JOINT’S AND BACKER LOCK TOGETHER. CHECK FLOATS.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
8. P/U & M/U 7” LINER AS PER RUNNING SHEET AND FILL WITH HOSE EVERY 5 JT’S. PUT R/A
MARKER AT BOTTOM OF JOINT # 97
9. M/U 7” ROTATING LINER HANGER WITH ZXP AND SETTING TOOL AS PER BAKER ENGINEER,
RECORD WEIGHT OF LINER UP & DOWN.
10. M/U ONE STAND 5” HWDP, HOOK UP TOP DRIVE AND CIRCULATE 15 MIN’S WITH MAX. 400
PSI, BAKER ENG. TO BE ON RIG FLOOR.
11. CONTINUE RIH WITH 7” LINER ON 48 JT’S X 5” HWDP & 9 STAND 5” D/P + 17’ & 10’ PUP + 1
SINGLE D/P, WASH DOWN LAST STAND TO BOTTOM. BAKER ENGINEER TO BE AT RIG FLOOR
WHILE WASH DOWN (MAX PRESSURE 400 PSI).
12. M/U TWO PUP JT’S & TOP DRIVE CEMENT MANIFOLD WITH T-CONNECTION TO RIG AND
CEMENT UNIT.
13. RECORD P/U & S/O WEIGHT WITH & WITH OUT PUMP.
om
14. CONTINUE RIH AND WASH DOWN TO BOTTOM, CIRCULATE 270 BBLS (1-1/2 LINER & DP
CAPACITY) WITH MAX. 400 PSI SURFACE PRESSURE, DO NOT RECIPROCATE STRING WHILE
ROTATION. MONITOR SHALE SHAKER FOR CUTTINGS, MONITOR WELL WHILE CIRCULATION
FOR LOSSES IF THERE ANY CALL CO. MAN, RECORD TORQUE AT 10 & 20 RPM.
17. SET FULL LINER WEIGHT (83K LBS) + 30K LBS ON HANGER TO CONFIRM HANGER SET.
18. PRESSURE UP TO 2500 PSI TO RELEASE RUNNING TOOL, BLEED OFF PRESSURE, P/U STRING
oi
WEIGHT + 4 FT, OBSERVE WEIGHT OF LINER LOOSE, CONFIRM TOOL IS FREE FROM HANGER.
19. SLACK DOWN 60K LBS ON HANGER & PRESSURE UP TO 4000 PSI TO SHEAR S.T LANDING
SUB.
21. COMMENCE CIRCULATION WITH 4 BPM & ROTATION WITH 10-20 RPM WHILE MIX CEMENT.
22. PUMP 50 BBLS 15.5 PPG SPACER FROM SLUG PIT USING RIG PUMP @ 4 BPM.
23. PUMP 144 BBLS # 16 PPG CEMENT SLURRY (670 SX “G” NEAT CEMENT) WITH RATE 4 BPM.
25. SWITCH LINE TO RIG PUMP & DISPLACE CEMENT WITH 163 BBL’S OBM # 15 PPG WITH 4
BPM (1927 STROKES WITH PUMP # 1). D/P WILL LATCH IN 7” WIPER PLUG AFTER PUMPING
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
29 BBLS (344 STROKES), REDUCE PUMP RATE AT 300 STROKES TO 2 BPM WHILE LATCHING
AND LAST 20 BBLS (AFTER 1690 STROKES). MONITOR WEIGHT INDICATOR WHILE PUMPING.
26. PUMP PLUG WITH 1000 PSI OVER FINAL DISPLACEMENT PRESSURE FOR 5 MIN’S.
27. BLEED OFF PRESSURE TO CMT UNIT & CHECK FLOATS EQUIPMENT.
28. RELEASE SETTING TOOL & P/U 10 FT , SLACK OFF 50K LBS TO SET ZXP PACKER.
29. CLOSE HYDRILL AND TEST BACK SIDE TO 1500 PSI FOR 5 MIN’S USING LEAK OFF TEST
PROCEDURES.
31. UN-STING FROM HANGER AND REVERSE CIRCULATE 70 BBL’S (2 STRING CAPACITY) WITH
MAX 1500 PSI, MOVE STRING AT ALL TIMES WHILE CIRCULATING. IF PLUG DID NOT PUMP
OR FLOATS DO NOT HOLD OR COULD NOT TEST BACK SIDE DO NOT REVERSE CIRCULATE &
POOH.
om
32. CIRCULATE HOLE CAPACITY CONVENTIONALLY (170 BBL’S)WITH MAXIMUM RATE
4. CONTINUE CIRCULATE THROUGH FROM RIG PUMP UNTIL HOLE CLEAN WHILE PREPARE MIX
WATER.
8. MIX AND PUMP 420 BBLS 13 PPG CEMENT SLURRY WITH 6 BPM PUMP RATE (841 SX
“G+35% S.F” CEMENT) MIXED WITH 14% SALT + ADDITIVES IN 300 BBLS MIX WATER IN PIT #
4 AS A LEAD.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
9. MIX AND PUMP 302 BBLS 16 PPG CEMENT SLURRY WITH 6 BPM PUMP RATE (1047 SX
“G+35% S.F” CEMENT) MIXED WITH ADDITIVES 152 BBLS MIX WATER IN PIT#3, AS A TAIL.
12. DISPLACE CEMENT WITH 588 BBLS (5833 STROKES BASED ON 96% EFFICIENCY 0.1008 BPS)
11.8 PPG SSM WITH 4 BPM PUMP RATE, FOLLOWED WITH 20 BBLS SEA WATER REDUCE
RATE WHILE PUMP SEA WATER TO 2 BPM (TOTAL STROKES = 6031) . USE RIG PUMP.
13. PUMP PLUG WITH 3000 PSI MAX SURFACE PRESSURE , HOLD PRESSURE FOR 10 MINS. IF
PLUG DID NOT PUMP, NO OVER DISPLACEMENT, STOP PUMP.
14. BLEED OFF PRESSURE TO TRIP TANK, RECORD VOLUME BACK IN TRIP TANK, AND CHECK
FLOAT HOLD OK.
15. R/D CEMENT LINE, FLUSH BOP WITH SEA WATER THROUGH WING VALVE OF BRADEN HEAD,
TAKE RETURN TO MUD PIT
22. N/U 13-5/8” X 11” 3K, 45 DEGREE TYPE “F” TUBING HEAD SPOOL.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
18. R/U CEMENT HEAD & SURFACE LINE TO CEMENT UNIT, TEST LINES & UNIT TO 4500 PSI FOR
10 MIN'S, OK.
21. MIXED 300 SX LITECRETE CMT DENSITY = 9.5 PPG, YIELD = 2.58 CUFT/SK MIXWATER = 7.1
GPS, THICK TIME = 7:20 ADDITIVES: 0.1 GPS D-177, 0.40 GPS D168, 0.45 GPS D80A, 0.06 GPS
D175, AND 1.0 D155.
22. LINE UP TO CEMENT UNIT AND PUMP 280 BBLS SLURRY # 9.5 PPG WITH 5 BPM PUMP RATE.
om
25. PUMPED 10 BBLS 9.3 PPG SPACER BEHIND.
26. SWITCH LINE TO RIG PUMP # 2, DISPLACE CEMENT WITH 694 BBLS 9 PPG OBM WITH 6 BPM
(7155 STROKES W/ 62 SPM BASED ON 0.097 BBL/ STROKE). REDUCE DISPLACEMENT RATE
TO 2 BPM LAST 20 BBL’S.
l.c
27. BUMP PLUG WITH 500 PSI OVER F.D.P.
28. BLEED OFF PRESSURE TO TRIP TANK. CHECK FLOATS HOLD & RECORD FLUID RETURN BACK.
29. INFLATE MID STRING ZXP PKR USING DOWELL UNIT BY PRESSURE UP
oi
TO 4200 PSI AND HOLD INFLATION PRESSURE FOR 10 MIN., RECORD VOL.
PUMPED.
30. DROP D.V OPENING BOMB, WAIT 30 MIN TO LAND BOMB. APPLY PRESSURE TO OPEN CIRC.
PORTS.
31. CIRCULATE THRU DV TOOL (W/ 12 BPM WHILE OBSERVE LOSSES )AT LEAST COMPLETE
CYCLE. RECORD SPACER & CEMENT RETURNTO SURFACE.
15. CONTINUE CIRCULATE THROUGH DV TOOL WHILE WAIT ON CEMENT 11 HRS AND PREPARE MIX
WATER FOR SECOND STAGE CEMENT JOB.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
3. MIX & PUMP ON FLY 400 BBLS 16 PPG “G” NEAT CEMENT (2000 SX) MIXED IN
SEAWATER AT 4.79 GPS, DENSITY = 16.0 PPG. YIELD = 1.15 CUFT/SK,
THICKENING TIME = 4:40 HRS.
7. DISPLACE CEMENT WITH 442 BBLS 9 PPG OBM (4557 STROKES WITH PUMP # 2)
FOLLOWED WITH 20 BBLS S.W (206 STROKES) @ 6 PBM (4763 TOTAL STROKES),
SLOW DOWN LAST 10 BBLS TO 4 BPM.
om
9. BLEED OFF PRESSURE AND CHECK FOR BACK FLOW.
10. CONNECT LINE TO CSG WING VALVE & FLUSH WELLHEAD WITH SEA WATER.
11. HANG BOP AND SET SLIPS WITH FULL WEIGHT OF CSG.
l.c
12. CUT 9-5/8” CSG WITH COLD CUTTER.
32. R/U CEMENT HEAD & SURFACE LINE TO CEMENT UNIT, TEST LINES & UNIT TO 5000 PSI FOR
10 MIN'S, OK.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
35. MIX AND PUMP 237 BBL'S (700 SX) (G+35 % S.F) MIXED WITH 14% SALT 15.0 PPG, YIELD =
1.9 CUFT/SK MIX WATER = 8.63 GPS CEMENT SLURRY W/ 4 BPM, MIXED WITH DOWELL
ADDITIVES AS PER LAB TEST.
37. SWITCH LINE TO RIG PUMP, DISPLACE CEMENT WITH 870 BBLS 13.4 PPG WBM WITH 6 BPM
(8640 STROKES). REDUCE DISPLACEMENT RATE TO 2 BPM LAST 20 BBL’S.
39. BLEED OFF PRESSURE TO TRIP TANK. CHECK FLOATS HOLD & RECORD FLUID RETURN BACK.
om
41. APPLY PRESSURE 2700 PSI TO OPEN CIRC. PORTS.
42. CIRCULATE THRU DV TOOL (W/ 12 BPM WHILE OBSERVE LOSSES )AT LEAST COMPLETE
CYCLE. RECORD SPACER & CEMENT RETURNTO SURFACE
43. CONTINUE CIRCULATE THROUGH DV TOOL WHILE PREPARE MIX WATER FOR SECOND STAGE
CEMENT JOB.
l.c
17. MIX AND PUMP 371 BBLS 14.5 PPG CMT SLURRY, 1000 SX “G + 35% S.F” CMT
FOLLOWED WITH 422 BBLS (1463 SX) TAIL SLURRY 16 PPG.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
19. DISPLACE CEMENT WITH 705 BBLS 13.4 PPG WBM (7003 STROKES WITH RIG
PUMP) FOLLOWED WITH 30 BBLS S.W (297 STROKES) SLOW DOWN LAST 20
BBLS@ 2 PBM,
20. PRESSURE UP 1200 PSI OVER FINAL DISPLACEMENT PRESSURE FOR 5 MIN’S TO
CLOSE DV TOOL.
21. BLEED OFF PRESSURE TO TRIP TANK AND CHECK FOR BACK FLOW.
22. CONNECT HOSE TO 13-5/8” CHS OUTLET VALVE AND FLUSH BOP WITH SEA
WATER.
23. HANG BOP AND SET 9-5/8” “CA” SLIPS WITH FULL WEIGHT OF CSG.
om
24. CUT 9-5/8” CSG WITH COLD CUTTER, 4-1/2” ABOVE FLANGE.
25. N/U T.H.S., L/D CMT HEAD, CUT OFF JOINT, SPIDER SLIPS AND ELEVATOR.
CHANGE TOP RAM TO 7" & TEST BONNET SEAL TO 2000 PSI
MU BAKER CMT MANFOLD W/ONE SINGLE 5" DP LOADED W/5" WIPER PLUG.
PU & MU BAKER V-SET SHOE + 2 JTS N. VAM 29 PPF DST110 + BAKER L.COLLAR + ONE JT
N.VAM 29 PPF DST110.
* CHECK SHOE ON SURFACE..OK & BAKER LOCK SHOE TRACK
CON'T RIH W/7" N.VAM DST110 29 PPF LINER EQUIPED W/BAKER CTC PKR T/2433 FT
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
CON'T RIH W/7" LINER ON 5" DP T/13357 FT, MU BAKER CMT MANIFOLD. CON'T RIH
WASHING DOWN, TAGGED BTM @ 13300 FT. PU 5 FT OFF BTM.
PLAN
2. BACK OUT TOP JOINT OF 24” CONDUCTOR DO NOT CUT BY TORCH & L/D SAME.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
6. P/U 24” CLEAN OUT ASSEMBLY: 16” USED BIT TYPE EMS4HG S/N B09559 WITH
OPEN JETS, BIT SUB 7-5/8” X 6-5/8” REG, 1X8” DC, 6-5/8” REG PIN X 7-5/8” REG
BOX X-OVER, 20” STRG STAB, X-OVER 7-5/8” REG PIN X 6-5/8” REG BOX, 6-5/8”
9. CLEAN OUT CONDUCTOR WITH SEA WATER AT MAX. FLOW RATE AVAILABLE
9. CLEAN OUT TO SHOE AT 556’ AND DRILL 10 NEW HOLE TO 566 WITH SEA
l.c
WATER.
11. DISPLACE HOLE TO SPUD MUD FROM PIT# 3 (PUMP 300 BBLS AND STOP PUMP).
oi
13. RIH BACK TO BOTTOM AND CHECK FILL. (CALL CO. MAN BEFORE POOH)
14. POOH, STAND BACK HWDP IN DERRICK AND L/D D/C, STAB & BIT.
16. BASED ON SPACE OUT CUT 24” CONDUCTOR 14’ BELOW ROTARY TABLE BY
17. R/U OVER SHOT & DIVERTER SYSTEM AND FUNCTION TEST SAME.