Download as pdf
Download as pdf
You are on page 1of 1
SITE VERIFICATION REPORT Date and Time of Site Verification : _March 19, 2008, Date Application Received :_ February 27, 2008 New ECC 7 Amendment of ECC A. GENERAL INFORMATION 1. Name of Project Proponent: _Mr, Seaundino M. Revita 2. Location of Project: _ Brgy. Carmen, Rosales, Pangasinan (Along Agno River) 3. Name and Position of Responsible Person Contracted : _Mr. Joey Emile 4. TypelNature of Project: _ Commercial Sand & Gravel Office / Business Address:_Bray. Poblacion, Rosales, Pangasinan Tel. No. B. FINDINGS / OBSERVATION 1. Status ofthe Project : Not Existing O existing Approximate % Completion 2. IPexisting, describe the project NA 3. Description of Project Area and Surrounding Environment ‘The quarry project with an applied area of 4.9949 hectares, is located along Agno River at Brey, Carmen. Access to the area is through the MeArthur Highway and dirt road below the Carmen concrete bridge which lead directly to the project site. The river banks are covered with clumps of cogon grasses, shrubs and undergrowths. The Agno River lies at the southem portion with the presence of residential built-ups across the river bank, C. REMARKS: The surrounding areas have been adversely affected by the deposition of sand materials left after the flooding of the river banks. Presence of illegal quarries is also noted in the area atthe time of site verification, ‘Annual rated capacity of aggregates extraction ~ 10,000 cu. m. / year D. RECOMMENDATION : For Issuance of ECC / Amerdment Ci For Issuance of Notice of Violation / Summon Attested by: Prepared by: NICANOR‘C. ESTEBAN OIC, Environmental Impact & Monitoring Division APPROVED: By Authority of the Regional Director ENGR. BENEDICTO 0. MOLANO (Chief, Environmental Management Specialist) Executive Assistant for Operations ‘it Verifleation Report Feo -'or

You might also like