I. BASIC INFORMATION: DENR - EMBI
Date and Time of Monitoring: _September 10, 2014
ECC Control No: _ECC-RI-0804-055.1913
Date ECC Issued : April 09, 2008
Without Amendment
With Amendment, Date of Issues: Dec.
Project Current Name: Piagery Farm
Project Name in the ECC:_Agro-Based Industry
Project Stats: Existing/Operational
Proponynt Narhe: Irene P. Serm
Project Location: — Bray. Gueset, Bugallon, Pangasinan
Contact PersonyPosition: __Ms. Irene P. Sermonia, Qwner
Proponent Mailing Address : _Bray. Gueset, Bugallon, Pangasinan
Proponent Contact Number (tel, cp, fax):_09231100035,
EMB Case Handler__Engr. Nelson L. Valde:
M1. COMPLIANCE TO ECC CONDITIONS:
STATUS OF a
COMPLIAN FINDINGS / OBSERVATION
CE
Yes [ No [O
TTY Permits/learances were secured from concemed LGU, DENR, DAR, ete
prior the implementation of the project.
ZV “The project has adequate and appropriate drainage system and soll erosion
control measures to avoid erosion and flooding of the adjoining properties.
z[v Regular sanitary housekeeping practices are observed within the farm
£1v Se
Dacha
é 1a “The p
The farm is empty during time of monitoring. The proponent was advised
if plan to operate commercial hog srowing or breeding. |
Complied
Tv [No abandonment eee |
Ty |The project consist of one (1) piggery building and no additional faciliy |
i was constructed.
BI Complied
Bia “The project was tansferred to Ms. Irene P. Sermonia on Dec. 19, 2011
Th [CMR were submitted
1S | | ECC billboard indicating the project title, name of proponent, ECC
|__| number and date of iss
C= BCC Condition No.
O- Others
ince was posted in the entrance of the farm.
eo-€cC Conpones Form it
Protect the environment... Protect Life...
Tel. Nos. (072-262-2057 700-2448; Fax No. (072}-700-2449; eal: embdenri@2vahoo.comoe exgennn emno of Pocuneat to.
(ob ied pty ts END)
Ill. EXECUTIVE SUMMARY
[ REQUIREME! [EVIDENCE REMARKS |
1. Validity of ECC No. ECG-RI- __| Approved by RD Jocl G. Salvador, |
ECC 0804-055-1213. CESO IV on April 09, 2008,
2. Complaints Documentation No valid complaints arises during
Management __| specific cases the monitoring.
IV. REMARKS AND RECOMMENDATION
1. In view of the above findings to the compliance to E
of the coverage of issued E recommended.
°C condition, amendment
Prepared by:
Ni nape Go
Enginé U1
Attested by:
J®EEG. SALVADOR, CESO IV
Regional Director
Ne0-€c<5Complianee Fornig-F
Date: 2014
To: ENGR. ANTONIO L. ESTRADA
Head, EMED
FROM : ENGR. BENEDICTO 0. MOLANO
Chief, Environmental Management Specialist
Head, CPD
SUBJECT: REQUEST FOR THE CONDUCT OF ECC COMPLIANCE MONITORING
In connection with the application/s for ECC Amendment, please conduct ECC
Compliance Monitoring for the following projects or establishments, to wit:
prone. Sermonia
RwUNe
Attached herewith is/are the corresponding copy/s of Environmental Compliance
Certificate/s (ECC) for your reference
For compliance
ENGR. Bef ‘OWS. MOLANO
NLU
URS canduel ce
Comm swcttoritg