Download as pdf
Download as pdf
You are on page 1of 3
a ~ e1MD For@No.o2 ~ —— Boournent No. _ . via te ek) ¥ REPUBLIC OF THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ENVIRONMENTAL MANAGEMENT BUREAU Regional Office No. 1 DENR Bldg., Government Center, Sevilla, City of San Femando, La Union 5 EGEIVE D ik ; COMPLIANCE EVALUATION REPORT peau at | Ry I. BASIC INFORMATION: DENR - EMBI Date and Time of Monitoring: _September 10, 2014 ECC Control No: _ECC-RI-0804-055.1913 Date ECC Issued : April 09, 2008 Without Amendment With Amendment, Date of Issues: Dec. Project Current Name: Piagery Farm Project Name in the ECC:_Agro-Based Industry Project Stats: Existing/Operational Proponynt Narhe: Irene P. Serm Project Location: — Bray. Gueset, Bugallon, Pangasinan Contact PersonyPosition: __Ms. Irene P. Sermonia, Qwner Proponent Mailing Address : _Bray. Gueset, Bugallon, Pangasinan Proponent Contact Number (tel, cp, fax):_09231100035, EMB Case Handler__Engr. Nelson L. Valde: M1. COMPLIANCE TO ECC CONDITIONS: STATUS OF a COMPLIAN FINDINGS / OBSERVATION CE Yes [ No [O TTY Permits/learances were secured from concemed LGU, DENR, DAR, ete prior the implementation of the project. ZV “The project has adequate and appropriate drainage system and soll erosion control measures to avoid erosion and flooding of the adjoining properties. z[v Regular sanitary housekeeping practices are observed within the farm £1v Se Dacha é 1a “The p The farm is empty during time of monitoring. The proponent was advised if plan to operate commercial hog srowing or breeding. | Complied Tv [No abandonment eee | Ty |The project consist of one (1) piggery building and no additional faciliy | i was constructed. BI Complied Bia “The project was tansferred to Ms. Irene P. Sermonia on Dec. 19, 2011 Th [CMR were submitted 1S | | ECC billboard indicating the project title, name of proponent, ECC |__| number and date of iss C= BCC Condition No. O- Others ince was posted in the entrance of the farm. eo-€cC Conpones Form it Protect the environment... Protect Life... Tel. Nos. (072-262-2057 700-2448; Fax No. (072}-700-2449; eal: embdenri@2vahoo.com oe exgennn emno of Pocuneat to. (ob ied pty ts END) Ill. EXECUTIVE SUMMARY [ REQUIREME! [EVIDENCE REMARKS | 1. Validity of ECC No. ECG-RI- __| Approved by RD Jocl G. Salvador, | ECC 0804-055-1213. CESO IV on April 09, 2008, 2. Complaints Documentation No valid complaints arises during Management __| specific cases the monitoring. IV. REMARKS AND RECOMMENDATION 1. In view of the above findings to the compliance to E of the coverage of issued E recommended. °C condition, amendment Prepared by: Ni nape Go Enginé U1 Attested by: J®EEG. SALVADOR, CESO IV Regional Director Ne0-€c<5Complianee Forni g-F Date: 2014 To: ENGR. ANTONIO L. ESTRADA Head, EMED FROM : ENGR. BENEDICTO 0. MOLANO Chief, Environmental Management Specialist Head, CPD SUBJECT: REQUEST FOR THE CONDUCT OF ECC COMPLIANCE MONITORING In connection with the application/s for ECC Amendment, please conduct ECC Compliance Monitoring for the following projects or establishments, to wit: prone. Sermonia RwUNe Attached herewith is/are the corresponding copy/s of Environmental Compliance Certificate/s (ECC) for your reference For compliance ENGR. Bef ‘OWS. MOLANO NLU URS canduel ce Comm swcttoritg Velde O23 COO - Wr.

You might also like