PIGGERY FARM PROJECT
ial Environmental Examination (IEE) Checklist
GUIDE FOR PROPONENT
Below is the IEE Checklist for Piggery Farm Project with a population from 50 to 500
Pigs. Read the questions carefully and provide the appropriate answers in the
spaces/blocks provided. Use additional sheets if necessary and provide attachments as
directed/required,
Misleading statements and erroneous answers provided in the blocks/spaces are basis
for legal actions and revocation of Environmental Compliance Certificate (ECC).
Project Proponent: _JAMS HOG FIELD CO.,LTD.
Project Location: BRGY GUESET, BUGALLON, PANGASINAN.
(Sieet, Barangay, Municipalty, Province/City)
Name of Proponent: ENGR. FERDINAND M.MOLANO
‘Address: MATALAVA WEST, LINGAYEN, PANGASINAN
(Stale Complete Address: Street, Barangay, Municipality, Province/Giy)
Telephone Number(s)
Fax Number(s) email
A. GENERAL INFORMATION
1, Project Ownership
WSingle Proprietorship / Corporation
/ Partnership / Others (cooperative, association,
NGO, etc.)
2. Project Capitalization : PhP 1,017,640.17
Equity PHP.
External Financing: PhP4.
Project Objectives/Rationale
Present a brief but complete description of the proposed undertaking. Include
‘among others the reasons why the project is proposed.
The ject was initiated by the nt as an additional income
For the family and to create employment and
PROFILE OF THE PROPOSED SITE.
Land
Land Area Covered by the Project, 18.28
Baus for Land Ownortip: (Atlch cbcunonie er each Marked Bovepare}
[Y]octct [ ] Lease Contract [Others
Land Use Classification of the Project Site
[ ]Commercial [| ] Agro-Industrial [ ]industrial [V ] Agricultural
Altach Location Clearance duly issued by MPDC/HLURB
Accessibility to the site (Modes/Routes)
Barangay Road: Fronting the site
Provincia/National High-Wey. About 1.5 Kilometer
Private Road: Right of way
(Please identity the access)
See attached site development plan
Picture of the site:mein yynog
‘M8IA YUONPROJECT COMPONENTS
Hog Population _200
Broken down as:
‘Sows
Boars
Piglets
Fatteners
Extent of Operations:
Breeding [1] Fattening / Finishing Staughtering [—] Processing |
Marketing
x
1. List of EquipmentFaciities:
EquipmentiFaciities No of Units
Piggery Building 4 200 Heads:
Electric Pump a Hp
‘Oxidation Pond 1 Gxtxt.5 |
‘Septic Vautt 2 Chambers ‘About 33 cum. |
2. Infrastructure: |
Infrastructure (attach property scaled site development plan)
Infrastructure Units: Floor Area
Piggery Building 7 300 sq.m.
Feeds Storage 7 356g. m.3. Utilities
3.1 Power Utilities
‘Sourceftethod Guha
Uttty | No.of Units | (Generator Set andlor | (uy or Watts)
‘Local Power supply)
[Lighting 5 PANELCO 200 W.
‘Con. Outiet 4 PANELCO 200 W
Elect. Pump 1 PANELCO 745.7 W |
j
32 Water Utities
Water Utilities | No.of Units | Source/Method of ‘Out Put
‘Water oxtraction (galhour)
DEEP WELL 7 Electric Pump 475
4, Waste Production
“Type of Waste Description/Source: Volume m/day |
Wastewater Cleaning of pens and 510 cumiday |
‘bathing of pigs l
‘Solid Waste Packaging materials MINIMAL !
Dust Particulate | Dust from feed handling MINIMAL
‘Others (pls. specify)
DESCRIPTION OF ENVIRONMENTAL SETTING
Physical Environment
1.1 Terrain (%Slope)
VJ Flat or Level (0-3)
Level to Undulating (3-8)
Undulating to Rolling (18-30)
Rolling to moderately steep (18-30)
Moderately steep to slighty mountainous (30-50)
Very mountainous (Above 50)~ —
1.2 Nearest Waterbodies
Please Chock | Name of | Location (epecify | Current Distance
Body of Water | Water Body | complete address | Usago of | fromthe
In the Vicinity of as sitio, barangay, | Water Body | Proposed
Proposed Site town and (domestic, | Project Area
province Industrial, | (kilometers)
agricuttural
‘Creek | NONE Bray. Gueset_ | agricuttural | ""50
River
‘Sea
Others
(Specify water body)
water body)
Immediate Adjoining Areas
1.3 Immediate Point of Waste Discharge: Two chamber septic tank
1.4 Ultimate Destination of Discharge: Oxidation pond-creek (Specify
Piease Check Appropriate
Land Use in the Vicinity of
the Proposed Site
Location (epecity sitio,
‘Barangay, town and
Province)
Distance from
Project Area (in|
kilometers)
Agricutural Brgy. Gueset
20 meters:
NA
“Agro-Industriai
et
Brgy. Gueset
500 meters:
Institutional
N/A
‘Commercial
NA
‘Open Space
NA
‘Others (pis. speciy)
Biological Environment
Please Check the Presence
of the Following Ecosystom
in the Vicinity of the
Proposed Site
Location (specity sitio,
‘barangay, town and
province)
Distan
ce from
Project area (in
Forest Land Brgy. Gueset
‘500 meters.
Wet Land.
N/A.
‘Coastal/Marine
NA.
‘Mangrove.
NA,
Protected Area
NA.
Other(pis. Specify)
No. of Trees to be affected during project implementation _NONE_‘Socio-Economic environment
41 Existing Settlements within the Project Area |
Description Unit Mitigating Plan
Total Households that willbe | NONE WA
Dislocated
Families that wil be Relocated _| NONE. WA
No. of Individuals from the Area
that will Benefit (as employees /
laborers)
42 Are there facilities within the 500-meter radius of the project site?
No[V]Yes[ ] it yes, please check appropriate box/boxes.
[ ] Barangay Clinic {1 Schools |
[| Municipal Hospital (1 Public Market
[1 Others
‘4.3 Is there any public opposition against the project?
[LV 1No
[ 1Yes
(Attach documents to support your answer)
4.4 Pre-Construction / Construction Phase
‘Answer
‘Components!
Parameter
Yes | No
gating |
Enhancemer
Impacts | gone ahous
come from the inspecting
‘ior compe By
the proponent)
‘Wil there be land clearing?
‘Wil there be vegetation
| Gearing.
‘Will there be tree cutting?
Wil there be topsoil
removal? Replacement
‘Wil there be excavation
‘works and cut & fil
activities?
Wil there be other
cearthmoving activites
‘Wil there be any slope
modification or ground
leveling?‘Answer Mitigating?
Yes | No Enhancement
Graueccry Impacts | (Recommendation sould
‘come rom tho Inspecting
(cor for comptance by
th proponont)
Willie be inveased The project
trafic movement inthe V | steisa
area? remote area
Wil tire be an inoease ih
economic activity in the
area?
Wil tire be an inrease in| V7 Employment
{valabity of employment? ofbrgy folks
Wil there be displacement of T
people in the area? i
Wil the displacement invave 7
relocation of affected v |
parties? |
‘4.5 Operation and Maintenance Phases
‘Components! Impacts | Describe your Mitigating?
Parameter | Yos | No. Enhancement Measure
Physical
Treatment
Water polation
v ruisance | Tromten—| boges and
Wastewater teaching
canbe
Toray
Treaintnt
Ones
‘Oder Chemical | Danestan
Treatment | canals to
‘nnimze
Air pottution | f°? crc oner fond
nuisance sdctves |
minimis oo— —
‘Components’ | Answer Impacts | Describe your Mitigating!
Parameter [Yeo Enhancement Measure
Green Zone | Piantng of
Establishment. | tees along the
parimetor of
fo project |
Chew
|
Generation of | t#netit |
hazardous: ‘Contractor :
cas | ie |
Moray P| Conatucton of
(for Livestock | mortality pit!
Moraites)
‘Cher
Air Pollution ‘Cyclone Oust |
‘Cotecton
(from Feedmil) =
4.6 Attach scheme of treatment for the proposed wastewater faciity/plans
with dimensions and description of each of the treatment units.
4.7 Attach Location Plan for composting / Landfill Area4.8 Attach Equipment Lay-out of the Feedmill Plant, Air Pollution Control
Facilities and Mortality Pit detail.
—. ATTACHMENTS.
1. Governing permits / clearance (attach photocopies of documents)
PERMITS/CLEARANCES
YES
NO
(ATTACHED?
Business Permit
‘Sanitary Permit
Building Permit
‘Water Rights Permit (NWRB)
Endorsement from LGU.
Locational clearance/ certificate of Locational Viability (HLURB
Clearance)
2. Other attachments
ATTACHED?
DESCRIPTION
“Transfer certificate of Title
Project Vicinity Map/Sketch
‘Site Development
‘Map/delineation of primary & secondary impacts areas
‘Endorsement from the LGU (Barangay/Municipal Certificate)
‘Construction Schedule in GANTT Chart Form,F. _ ENVIRONMENTAL MANAGEMENT PLAN
Project: JAMS HOG FIELDS CO.,LTD.
Bray. Gueset, Bugalion, Pangasinan 00
Impact Mitigation Period of Responsible Parly
Enhancement Measure. Implementation
Proper maintenance of | Throughout project ife ‘The proponent
septic vault/ earth pond
and regular removal of
sludge.
Proper sanitation that ‘Throughout project ie The proponent
includes proper cleaning
and disinfection
Planting of trees around | Throughout project life The proponent
the project site
G. _ RESULT OF SITE VERIFICATION REPORT / RECOMMENDATION
Checked/Surveyed by:
Conforme:
ProponentACCOUNTABILITY STATEMENT
This is to certify all information and commitments in this Initial Environmental
Examination (IEE) Checklist are true, accurate and complete. Should we lear of any
information which would make the IEE Checklist inaccurate, we shall bring said
information to the attention of the Environmental Management Bureau.
Ue hereby bind myself/ourselves jointly and solidarily for any penalties that
may be imposed arising from any misrepresentation or failure to state material
information in the IEE Checklist. a
50s i Molano
Project Proponent
(Signature over printed name)
Owner
(Tile/Designation)
(Date)
ACKNOWLEDGMENT
BEFORE ME this 6th day of _Meréh 2008 at (place)
San Fernando City ; personally appeared (name)
with’ Community Tax Certificate No.
issued on (date) eucaasaaseaaen at
nation)
(place). in histher capacily as (
of (name of slitution)
‘and acknowledged to me that this is hisiher voluntary act and deed at the entity
he/she represents. This document, which consists of pages, including the
page on which this acknowledgement is written, is an Initial Environmental
Examination Checklist.
Witness my hand and seal on the place and date above written,
ahs
Page No. 233,
Book No, HIV 1
Series of 2008, a 4