Professional Documents
Culture Documents
TPJC-TQ1-DW-C8-641-3C02-026 - B - Jetty Head Piling Plan - Verified
TPJC-TQ1-DW-C8-641-3C02-026 - B - Jetty Head Piling Plan - Verified
TPJC-TQ1-DW-C8-641-3C02-026 - B - Jetty Head Piling Plan - Verified
TN
E
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
HOLD
GENERAL NOTES
F
HOLD
MATCHLINE TO LINE 66
B
E
B
D
For the steel pipe pile material is
BS EN 10025 S355 JR that its
properties must follow JIS A5525
SKK 490 as per SBI letter
052/KRE/PDD/04/2022. For the
Provide line 44
REFERENCE DRAWINGS
66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86
15/06/22
MATCHLINE TO LINE 65
A EMPLOYER :
SOLUSI BANGUN
PILE SCHEDULE B
CONTRACTOR :
TPJC-TQ1-DW-C8-641-3C02-026
PROJECT :
EPC TUBAN JETTY UPGRADE AND
ITS ANCILLARY PRODUCTION &
TRANSPORTATION FACILITIES
The stated coordinates must be checked again and align with the existing condition, azimuth, the result of site study & TITLE :
investigation. Contractor is responsible to make sure that the said coordinates is fit for purpose of the Works. Please JETTY HEAD
Contractor conduct Joint Survey related the coordinates before commencement of the piling works.
PILING PLAN
TPJC-TQ1-DW-C8-641-3C02-026 1 OF 1 A3
A