Screeding Works
Screeding Works
Kindly Note
If the severity rating lies between 1 to 16, then corrective actions
RISK MATRIX needs to be taken by the Engineer/ Supervisor with documentary
evidence, to reduce and/or eliminate the residual risk(s).
Probability
Severit
2 2 4 6 8 10
y
10-16 Before task Moderate - M Non Reportable Injury / Moderate Incident
commences Illness > 3 days 3 3 6 9 12 15
Minor Incident
20-25 Acceptable Low - L First Aid Cases
4 4 8 12 16 20
Near miss / Slight
>25 Very Low - VL Clinic Visit Incident
5 5 10 15 20 25
RISK ASSESSMENT
Before &
Unauthorized entry Allow only trained employees for Site Engineer/
4 Screed application 3 3 9 3 1 3 During the
of people screeding Supervisor
task
Reviewed By: