Rig Move Plan RIG 33

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ALSSAIL DRILLING COMPANY

HSE DEPARTMENT
RIG MOVE PLAN

RIG 33 Rig Move Plan - Table of Content


1. Rig move preparation
• Location survey
• Road Survey
• Preparation of advanced loads
• Administration (Rig move plan)
• Equipment Inspection
2. Preparation of new location and camp
3. Logistics
• Number of Cranes
• Number of truck loads
• Lowboy truck loads
4. Load dimensions and weight
• Description of loads in their sequence
• List of wide loads for convoy
5. Rig move descriptions:
. 5.1 Preparation
• 5.2 Pre-move loads
• 5.3 Rig release
• 5.4 Move safety meeting
• 5.5 Line of responsibility -- 1. Chart of responsibility & 2. Job Descriptions
• 5.6 Daily move plan
• 5.7 Lower/ Raise mast procedures
• 5.8 Re-assembly substructure
6. Rig checklist
• Lowering Derrick
• Raising Derrick
7. Critical lifts
8. Lay-outs
• Rig Lay out
• Camp Lay-out rig site
• Camp Lay-out
9. Pre-spud inspection
• Safety
• General
• Drill floor
• Derrick
• Mud tanks
• Mud pumps
• Engines
• Equipment
• Draw works
10. Daily move report
11. Rig drawing
12. Medivac procedures
• Ambulance Drill
• Notification chart
• Emergency Instructions
Write by HSE S.V M.RAMADAN 4475 mohamedaburwisha@gmail.com

mohamedaburwisha@gmail.com

You might also like