Program of PNU-SIOB PKG-3 For 10.09.

2022

M/s KPTL RFI For


Type of works KM Gang Timings for Inspection Labour Remarks
Representative 10/9/2022

OHE Foundation Casting Work KM-174 (UP Line) M/s Ganesh Cons. Mr.Sushil Planned First & Second Half 10 PMC/Client Required

OHE Foundation Excavation Work AAR YARD M/s Mahee Cons. Mr.Sushil Planned First & Second Half 6 PMC/Client Required

TTB & BOOM Erection Work GM & LAA YARD Neeraj Mr.Vijay Pandya Planned First & Second Half 7 PMC/Client Required

Bracket Adjustment Work ( 5 Ladder) PFL YARD Ramnath+Shiv Mr.Partho & Mr.Rajkishor Planned First & Second Half 23+14 PMC/Client Required

Knee Bracing, DA, Bracket & Guy Rod


GM YARD Shivram+Narendra Mr.Pawan Planned First & Second Half 14+3 PMC/Client Required
Erection Work

Ladder Trolly Checking Work LAA-PFL Ramjeet Mr.Aman Mishra Planned First & Second Half 10 PMC/Client Required

TRD,PMC/Client
ATD Adjustment & Joint Checking Work PDF-BUBR Shreeram Mr.Niranjan Planned First & Second Half 9
Required

Aggregate Shifting Work PFL YARD Umang Cons.+Ramnath Planned First & Second Half 4+5

C/W Erection & A/C Wire Stringing Work PFL-GM Babloo+Shreeram Mr.Gyan Shukla Planned First & Second Half 7+2 PMC/Client Required

Bracket & Guy Rod Erection Work GM-SNLR Shreeram+Sanjay Mr.Subhankar Planned First & Second Half 5+2 PMC/Client Required

Bond Fabrication Work AAR STORE Saxena Mr.Sonu Planned First & Second Half 5

TRD,PMC/Client
SED Joint Checking Work KYG-PDF Sanjay + Sandeep Mr.Prasant Jena Planned First & Second Half 8+8
Required

Platform Cutting Work & Earth Electrode TRD,PMC/Client


PFL YARD Babloo+Shobi Mr.Tanmay N. Planned First & Second Half 6+3
Erection Work Required

OHE Stringing Work PFL YARD Narendra Mr. Pankaj Planned First & Second Half 12 PMC/Client Required

Height Gauge Grouting work GM-SNLR Manoj+Ramjeet Mr.Gaurishankar Planned First & Second Half 3+6 PMC/Client Required

Mast Grouting work GM YARD Mahee Cons.+Manoj Mr.Rupesh Planned First & Second Half 5+3 PMC/Client Required

TRD,PMC/Client
PSI Work PFL SSP Ramjeet+Tinku Mr.Devashish Planned First & Second Half 6
Required

Bracket & Dropper Fabrication AAR STORE Vimlesh Mr.Vimlesh Planned First & Second Half 6

Quality Control & Cube Testing Work AAR Mr.Ganga Prasad Planned First & Second Half PMC/Client Required

Store Work AAR STORE Rama Mr.Amit Planned First & Second Half 4

Drum Loading Work AAR STORE Ramjeet Mr.OP Yadav Planned First & Second Half 5 PMC/Client Required

AAR Type-3 Block-02 Staff


GE Wall Conduiting Work Mr.Ajharuddin Planned First & Second Half 03 (Multi Infra) PMC/Client Required
Quarter

Civil LAA SSP Soil Filling Mr.Gaurishankar Planned First & Second Half 10 PMC/Client Required

Brick Work Of Superstructure,


Civil AAR Type-2 Staff Quarter Mr.Raj Permit Planned First & Second Half 30 PMC/Client Required
Lintel & Sunshade Shuttering

Civil SIOB OHE PSI Depot Flooring Work Mr.Vipin Kumar Planned First & Second Half 10 PMC/Client Required

NOTE: 1. TRD Staff required for Tower wagon checking, SED Checking, ATD Checking in Between SNLR-KYG Section. Information of TRD Staff to be given a day earlier so that OHE manpower can be deploy accordingly. 2.Signalling staff is required for
Bond erection works.
All Engineer's should ensure the following at workspot.
All OHE Supervisor, Engineer should be use Discharge Rod while Working.
# Quality of M Sand.
# Safety precautionary measures list for JCB working issued by GGM RVNL should be followed strictly
# Ensure Span leangth on both sides.
# Proper STEEL shuttering for foundation. Avoid Wooden shutters .
# Required quantity of cement bag must be brought to site before starting foundation.
# If any cable cut noticed during pit excavation should be informed to all concerned for arranging Signal staff.
# Ensure that every person/Labor present at site should have Safety PPEs
# Ensure SAFETY at your workspot
# Conduct TBT on regular basis.