Professional Documents
Culture Documents
Gunvant SIP
Gunvant SIP
ON
IN
SUBMITTED TO :
INSTITUTE CODE :
UNNATI THAKKR
OFFERED BY
AHMADABAD
PREPARED BY:
1
PRFEACE
The MBA Program is very structured integrated course of business studies. The main
adjective of practical research is to develop skill in student by supplement to the
theoretical study of management is general. Research study helps to gain real life
knowledge about the business practices.
During this whole research we got a lot of experience and come to know about the
practices in real that how it differ from those theoretical knowledge and the
practically in life.
2
ACKNOWLEDGEMENT
It gives me great pleasure to submit thus summer internship projects report to the
Gujarat technological university” a sigma institute of engineering” as apart of
curriculum aim of my MBA finance course. I take this opportunity with great
pleasure to presents before you this projects on “A STUDY ON IMPACT OF GST
IN KIRBY BUILDING SYSYEMS INDIA PRIVET LIMITED ” I am extremely
thankful the IC principal of my college Dr Priyesh Gandhi. I also thank the heas of
department MRs Unnati Gandhi, sigma institute of engineering for providing me
the opportunity to embark on this projects. in this chain we are very thankful and
country sincere gratitude to our project guide MRs UNNATI THAKKR MADAM
For us enlightening guidance constant inspiration and keen interest show on as during
making of this projects. We deliberate our profound sense of gratitude of this projects
we had a great pleasure in preparing this projects reports. It is the outcomes of the
efforts of many people who helped us thoroughly this presentation ,we are highly
thankful to all who have directly or indirectly helped us this projects.
3
DECLARATION
I hereby declare that the summer Internship Project Report titled KIRBY
BHUILDING SYSYEMS INDIA LIMITED” in is a result of my own work and my
indebtedness to other work publications, references, if any, have been duly
acknowledged. If I am found guilty of copying from any other Report or published
information and showing as my original work, or extending plagiarism limit, I
understand that I shall be liable and punishable by the university, which may include
‘fail’ in examination or any other punishment that university may decide.
4
PART – I – ORGANISATIONAL PROFILE
1. INTRODUCTION OF KIRBY BUILDING SYSTEM
Kirby building systems is manufacturing company specialising in pre-
engineered buildings.
It was established in 1976 and is a wholly owned subsidiary of alghanim
industries.
Kirby building systems is commerce it is operations in india in the year
2000.
Kirby introduce the PEB technology first in the middle East .in 1976 and
later in india in 2000.
Kirby building system india limited is the market leader in producing steel
building and structures in india.
Kirby india has its state of the art PEB plants annual capacity of
125000MT and 75000MT. Hyderabad and Haridwar respectively.
Kirby has manufacturing facilities in Kuwait, Ras Al Khaimah,
Hyderabad, Haridwar and Vietnam with a production capacity of over
400,000 MT per year.
It is certified to ISO 9001 quality standard and has sales offices in 70
countries.
Kirby building systems is one of the largest pre- engineered steel building
companies in the world and is a 100% subsidiary of Kuwait- based
multination and multi-billion dollar business
Its product list consists of pre- engineered steel buildings applicable for
factories, warehouses, metro rails, supermarkets, aircraft hangars, sports
stadiums, auditoriums, etc.
Other products include structural steel, sandwich panels. storage solutions,
Kirby roof, Kirby wall , Kirby deep decking panel and Kirby standing
seam panel.
The company operates 70 sales offices located across six geographical
regions.
Kirby is members of Indian green building council.
5
THE COMPANY
2.1HISTORY
Kirby was established as a joint venture between Alghanim and Kirby
building systems Nucor, USA in 1976 with a production plant in Kuwait.
In 1981 it built the largest textile complex in the world Alam, Egypt.
In 1996 it received ISO 9001:2000 quality certification.
In 2000 the plant in Hyderabad was opened one year later Kirby india
received ISO 9001:2000 certification.
In 2006 a plant in haridwae was inaugurated with a capacity of 60,000
MT.
The plant had an investment of Rs 50 crore
In 2009 the company reintroduced curved steel structures, an alternative
style To other PEB building.
Kirby has manufactured more than 65,000 buildings across the world.
2.2MISSION VISION AND VALUES
To be recognize as the global leader for the design, manufacture, supply
and erection of Pre-Engineered steel building and structures.
Worldlink PEB mission to offer work with high quality like international
standards within given time line.
Worldlink PEB one of the most comprehensive PEB suppliers in india to
have grown exponentially
VISION
Kirby will achieve this vision by consistently delivering high-quality
products too our customers, accompanied by personalized service and a
commitment to excellence.
At Kirby Building Systems, we understand the complex challenges that
our customers face as they conceptualize, plan and execute their building
projects.
We also know how important it is to get it right the first time.
6
As a leader in the industry, our experienced and dedicated team provides
clients with innovative and proactive engineering solutions, adding value
from start to finish.
We see ourselves as partners in our customers’ success, with a distinct
and important role to play.
VALUES
Straight- Talking
We encourage open debate where the best ideas win.
Teamwork
We actively share information and ideas, enthusiastically working to make
those around us better.
Diversity and Respect
The diversity of our workforce is an asset and we treat everyone with dignity
and respect regardless of status, gender, education, ethnicity or religion.
Empowerment
We empower people to make decisions with a bias for action.
Rewards and career advancements
The rewards and career advancements of our people are base their
performance and capabilities, not on their influence.
7
2.4 Present Product and Service
Pre-engineered steel building are a steel structure built over a structure concept of
primary members, secondary members, and the cover sheeting connected to each
other.
Its product list consists of pre- engineered steel buildings applicable for
Factories Sports
Warehouses Stadiums
Metro rails Auditoriums
Supermarkets Showrooms
Offices Workshops
schools Hospitals.
8
Roof monitors
Insulation etc.
This all are based on the customer’s requirements.
2.5 Geographical Spread of the organisation
The company operates 70 sales offices located across six geographical
regions, namely the gulf cooperation council, the rest of the middle east the
Indian sub- continent, Africa, Eastern Europe and south east Asia.
We work with clients globally and have an extensive presence in the Middle
East, Far East, South East Asia, the Indian sub-continent, Africa and Europe.
Kirby has more than 300 certified builders globally for providing erection of
steel building along with other trades up to turnkey projects.
9
3. FUNCTIONAL AREAS
3.1 MARKETS AND MARKETING FUNCTION
WHAT IS MARKET
Market is the point of interaction between buyers and sellers.
Price is determined in the market through competition between buyer and
sellers.
Market deals with buyers and sellers.
WHAT IS MARKETING
Marketing is the activities to reach products from producer to consumer.
Marketing is the social process by which human needs are identified and
at the best conclusively.
Marketing is concerned with changing the ownership of products.
FUNCTION OF MARKETING
Marketing in construction comprises activities such
New types of construction
Satisfying clients and keeping them loyal
Market research and analysis
Offering additional services and pricing
Negotiating and contracting
Promotional activities
MARKET SEGMENTS
Kirby offer one of the most comprehensive pre engineered steel buildings PEB
product portfolios globally, with application in major market segmentation including
heavy industry , infrastructure, high-rise buildings, warehouses, factories, oil and gas.
We work with clients globally and have an extensive presence in the Middle East, Far
East, South East Asia, the Indian sub-continent, Africa and Europe.
10
Steels dominates the material segment of the market. This material segment of
construction of the pre engineered building is steel which in trun highly resusable
without losing its engineering product.
On the based offend use market is segmented into commercial industrial and
infrastructure
Commercial sector includes the offices, showrooms, and other.
Industrial sector includes the factories, werehouses and other .
Infrastructure including the bridges, airport hanger, railway platforms and other.
11
Kirby building systems aims to become the market leaders in its business operation
by providing high-quality pre-engineered steel building systems and structure steels
product that meet or exceed customers requirement and expectation in line eith the
requirement of ISO standard.
12
3.2 PRODUCTION DEPARTMENT OF KIRBY BUILDING
SYSTEMS
Introduction
A production department is a groups of function within a business that is responsible
for the manufacturing goods. The production departments can be largest organization
within a organization.
Production function is one of the most importance factions in any manufacturing
organization, this function represent set of activities through which the product is
made and delivered according to the client’s requirements.
Production planning
Production programmes both long terms as well as short terms like routing,
scheduling, preparation of orders, and preparation of demand schedules are handled
by the production departments. For Any metals company it is necessary to before
production to prepare production plan.
Production control
To have adequate control over various production process is another significant
function of the production departments. It is control minimum cost of production, and
13
it also control finished goods customers requirements and Maintain customers
satisfaction.
Purchasing
Purchasing of material and equipments forms the parts of the production function.
The decision regarding specifications in the matter of their quality aspects are taken
either by the production departments or the staff departments. Purchase departments is
empowered to take decisions with regard to the supplier, price, delivery date etc.
Plant engineering
Function of the plant engineering relates to planning , designing , specifying ,
installing, modifying, protecting and plan amenities. All are pre define.
Production process
There is no fixed production process because of it is depends upon size of
infrastructure and industries, production process is depends on orders of metals.
Safety
Safety is performing your daily tasks in a safe manner, and protecting peoples,
equipments and environments. Use best safety tools when movements of material
from one place to another place .Kirby company is provides equipments for safety,
At Kirby building systems are committed to design manufacture and supply quality
products conforming to global standards with the state of the are technology and
14
equipments to ensure totals customers satisfaction. The main aims is to maintain
leaderships in this industry by continuously upgrading our technology.
Access to site
The vehicle transporting your building parts must gain access to the building site
from the adjacent highway or road. Such access should be studied and prepared in
advance of arrival. All obstructions, overhead and otherwise, must be removed and
the access rout.
Inspects to ensure that there is enough room to physically perform the tasks required
to erect the building, the availability of any required utilities should also be
considered in advance.
Unloading operation
Pre- planning of the unloading operations is an importance parts of the installation
procedures. This involves careful safe and orderly storage of all material. Detailed
planning is required at the job site where storage space is restricted.
Think safety at all times
Location of carrier vehicle during unloading
Prepare necessary ramp for truck
Check shipment
Schedule lifting equipments
Handling and storing material
15
16
17
3.3 Supply Chain and Logistics
4
5 The company maintains a strong reputation for delivering customer-
designed and cost- effective solutions for steel buildings that are
manufactured to the highest quality standards, and a commitment to
providing top class service to its customers. Our commitment to excellence
provides unmatched product quality, coupled with speed, safety and
superior sales services.
6
7 We at Kirby offer a worry-free solution to our clients. We go that extra-
mile through our systems, process and our internal orientation to ensure
that commissioning a Kirby project is a seamless and effortless experience
for our clients.
3.4 HRM Function
18
2 Decision-making
Board Meetings, frequency, nature of decisions
Senior Management Decisions
Middle Management Decisions
Decisions by operating staff
Coordination among different layers and functions, and alignment of
decisions to market needs and shareholder wealth.
19
5. Financial Analysis
Costing of the main product.
Break Even Analysis
Financial analysis of the company through ratios of last three
financial years, and your interpretation of the results.
20
PART 2 : RESEARCH PROJECT
Ch:1:Topic of study (pages 2-3)
1.1: problem statement
1.2: title of study
1.3: significance of study
21
Ch:4: RESEARCH METHODOLOGY (pages 2-3)
NO THEORY OF RESEARCH TERMS
4.1: Research design (Which type used, Why?)
4.2: Data Collection
A. source of data
Primary data
Secondary data
B. Data collection method
Survey method
C. Tool / Instrument for data collection
Structured questionnaire
4.3: Scaling Techniques
4.4: Sampling Design
a. Population
b. Sample size
c. Sampling method
ANNEXURE
Questionnaire
Bibliography
22
The total marks for the SIP project will be 100 and it carries 6
credits. The marks will be awarded for the following aspects:
iii) Details about the study: Objectives, formulation of the problem, scope,
and rationale of the study.
vi) Contribution and learning from the project: Details of the contribution of
the study, the benefits to the organisation, the learning from the study for the
student, etc.
23
received from other individuals/organisations.
viii) Presentation of the report, format of the report, flow of the report,
style,
language, etc.
x) Overall impression.
24