PATHWAY

BACK UP VOLUME
NO. URAIAN PEKERJAAN UNIT Panjang Lebar Lbr atas

(1) (2) (3) (4) (5) (6)


A. PEKERJAAN PERSIAPAN
1.1. PEKERJAAN PENDAHULUAN
a. Pekerjaan Pembersihan dan Perataan Lapangan Ls
b. Pekerjaan Pembuatan Bouplank M' 30.3

B PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
a Galian Tanah Pondasi M3 1 1

II Pondasi
a Pondasi Batu Belah M3 1 1.5
b Foot Plat P1
Lantai Kerja M3 0.8 0.8
Pengecoran K225 Site Mix M3 0.8 0.8
Pembesian D13 Kg 9.6
Begisting M2 0.8 0.8

c Foot Plat P2
Lantai Kerja M3 0.8 0.8
Pengecoran K225 Site Mix M3 0.8 0.8
Pembesian D13 Kg 9.6
Begisting M2 0.8 0.8

d Kolom Pedestal P1
Pengecoran K225 Site Mix M3 0.3 0.3
Pembesian 8 D13 Kg 8
D10 - 100 Kg 0.3 0.3
Begisting M2 0.3 0.3

e Kolom Pedestal P2
Pengecoran K225 Site Mix M3 0.3 0.3
Pembesian 8 D13 Kg 8
D10 - 100 Kg 0.3 0.3
Begisting M2 0.3 0.3

f Sloof
Pengecoran K225 Site Mix M3 35.1 0.25
Pembesian 6 D13 Kg 211.2
D10 - 100 Kg 526.5
Begisting M2 35.1 0.25

g Lantai
Beton K225 Site Mix M3 22 1.3
Pembesian D10 - 150 Kg 320.4
Begisting M2 24.6
Finish Trowel Lantai M2 22 1.3

f Grouting Kolom Pedestal Unit


Bobok pondasi existing len pipa & Perapihan Unit 0.5 0.5 0.3

C STRUKTUR BAJA
Kolom WF 150 X 75 X 5,5 X 8 Kg
Kg
Kolom Support Tangga WF 150 X 75 X 5 X 7 Kg
Kg
Balok WF 200 X 100 X 5,5 X 8 Kg 22
Balok Bordes UNP 150 X 75 X 6,5 Kg 1.3 1.4
Kg 1.2 1.3
Kg 0.5 1.3
Balok Support Bordes Kg 1
Balok Tangga UNP 150 X 75 X 6,5 Kg 9.8
Plat Bordes & anak tangga Kg 15.83
Balok UNP 100 X 50 X 5 Kg 1.2
Sayapan Kolom UNP 150 X 75 X 6,5 Kg 7.36
Kg 1.5
L 50 X 50 X 5 Kg 2.7
Kg 41.7
Stfner Kg 0.029
End Plate Kg 2 2.4
Baut Angkur EA
Baut - baut bh 4
Plat Bondek 0,7 M2 22 1.3
Base Plate KG
Kolom Hollow (100 x 50) M'
Kolom Hollow Bordes (40x40) M'
Hollo Rangka Atap (40 x 40) M' 3.64
M' 22
Siku M' 22
THWAY
BACK UP VOLUME TOTAL VOLUME
Lbr bawah Tinggi Tebal Jumlah Koef = VOLUME SAT

(7) (8) (9) (10) (11) (12) (13) (14)

= 1 Ls
2 = 60.6 M'

1.5 12 = 18 M3

1 6 = 6.75 M3

0.25 10 = 1.6 M3
0.4 10 = 2.56 M3
10 0.62 = 59.52 Kg
0.4 10 4 = 12.8 M2

0.25 2 = 0.32 M3
0.4 2 = 0.512 M3
2 0.62 = 11.904 Kg
0.4 2 4 = 2.56 M2

1 10 = 0.9 M3
1.1 10 1.04 = 91.52 Kg
1 10 0.62 = 24.8 Kg
1 10 4 = 12 M2

1 2 = 0.18 M3
1.1 2 1.04 = 18.304 Kg
1 2 0.62 = 4.96 Kg
1 2 4 = 2.4 M2

0.45 = 3.95 M3
1.04 = 219.65 Kg
0.62 = 326.43 Kg
0.45 2 = 31.59 M2

0.12 = 3.432 M3
= 320.4 Kg
0.15 2 = 7.38 M2
= 28.6 M2

12 = 12 Unit
7 = 7 Unit

2.5 4 14.00 = 140.00 Kg


2 10 14.00 = 280.00 Kg
3 1 14 = 42 Kg
1.5 1 14 = 21 Kg
2 14.00 = 616.00 Kg
4 18.67 = 201.60 Kg
4 18.67 = 186.67 Kg
2 18.67 = 67.20 Kg
4 14.00 = 56.00 Kg
4 18.67 = 731.73 Kg
94.40 = 518.84 Kg
8 9.37 = 89.92 Kg
18.67 = 137.39 Kg
10 9.37 = 140.5 Kg
24 3.75 = 243 Kg
1 3.75 = 156.38 Kg
12 131.11 = 45.63 Kg
12 131.11 = 123.6 Kg
4 12 = 48 EA
12 = 48 bh
= 28.6 M2
= 78 kG
2.35 6 = 14.1 M'
2.46 16 = 39.36 M'
13 = 47.32 M'
4 = 88 M'
1 = 22 M'