Professional Documents
Culture Documents
Ce - 02
Ce - 02
A B C D 12350
ROOF APEX
12350 5.10 m
6400 1600 1250 1250 1850
1700
400 488 575 913
2500 1100 2675 1200 600 600 600 700 TOP OF BEAM
3.40 m
1500
W2 W4 W4 W4
3000
GENERATOR &
1650
ramp up
ELECTRICAL
(HANDWASHING
900
ROOM
700
1
AREA)
FLOOR LEVEL
D2 D4 D4 3650 0.40 m
W1 SLEEPING HE SHE
1500
GROUND LEVEL
400
X AREA D3 PWD
(see divider details) 0.00 m
B-4
4000
FRONT ELEVATION
RAMP
MEDICAL
858 1200
W2
2350
FACILITIES SCALE 1:100mts.
D3
8000
2
D C B A
1800
COMMUNITY W3
KITCHEN 12350
4000
3850
1500 400 1100 342
ROOF APEX
5.10 m
D2
1700
3 D1 TOP OF BEAM
3.40 m
W1 W1
1500
Y
(HANDWASHING
B-4 AREA)
3000
700
(HANDWASHING
4200 3950 4000 1700 FLOOR LEVEL AREA)
0.40 m
1350 1800 2075 1900 2075 1800 1350
GROUND LEVEL
400
4350 3650 4350
0.00 m
REAR ELEVATION
GROUND FLOOR PLAN SCALE 1:100mts.
SCALE 1:100mts.
Republic of the Philippines PREPARED BY: RECOMMENDING APPROVAL: NOTED BY: APPROVED BY: SHEET CONTENT: SHEET NO.
DEPARTMENT OF SOCIAL WELFARE & DEVELOPMENT
KALAHI- CIDSS: NCDDP Additional Financing
Construction of Quarantine Facility cum Evacuation REXTER S. PANGANIBAN ENGR. ROSENDO E. VELASCO ENGR. RAYMOND B. LIBARRA AS SHOWN CE- 2
Center and Purchase of Medical Supply and Equipment Technical Facilitator Municipal Engineer PDO IV for Infrastructure BDC TWG- Chairperson
Location: Brgy. Rumbang, Rizal, Occidental, Mindoro NOTE: All units are in meters unless otherwise stated