SESSION PLAN

Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency: STAKE-OUT BUILDING LINES
Module Title : STAKING-OUT BUILDING LINES
Learning Outcomes
LO1. Prepare materials for stake-out building lines
LO2. Stake-out building lines
LO3. Fix building lines
A. Introduction
This module covers the knowledge, skills, and attitude for preparing stake-out materials and fixing stake-out building lines.
B. Learning Activities
LO 1. Prepare materials for stake-out building lines

Learning Content Method Presentation Practice Feedback Resources Date/


Time
1. Interpretation of Modular Read Information Sheet Answer Self-check no. Compare to Answer CBLM on Preparing
Plans and No. 1.1-1 on 1.1-1 Key No. 1.1-1 materials for Staking-
Details Interpretation of Plans out Building Lines
and Details
2. Material Modular Read Information Sheet Answer Self-check no. Compare to Answer Claw Hammer
Specifications No. 1.1-2 on Material 1.1-2 key No. 1.1-2 Marking Tools
Specifications Water hose level
3. Board Foot Modular Read Information Sheet Answer Self-check No. Compare to Answer Nylon String
Computations No. 1.1-3 on Board Foot 1.1-3 key No. 1.1-3 Plumb Bob
Computations Steel Square
4. Tools, Materials Modular Read Information Sheet Answer Self-check No. Compare to Answer Cold chisel
and Equipment No. 1.1-4 Tools, Materials 1.1-4 Key No. 1.1-4 Ripping/wrecking/
for Staking-out and Equipment for claw Bar
Building Lines Staking-out Building Lines Pull-push rule
5. Company Rules Modular Read Information Sheet Answer Self-check No. Compare to Answer Try-square
No. 1.1-5 Company Rules Hand Saw
and Regulations and Regulations 1.1-5 Key No. 1.1-5 Chalk Line
Bolo
Sledge Hammer
Personal Protective
Equipment

Plan and working


drawings
Lumber
Nails
LO 2. Stake-out building lines
1. Setting Batter Modular/ Read Information Sheet Answer Self-check No. Compare to Answer CBLM
Boards No. 1.2-1 on Setting 1.2-1 Key No. 1.2-1
Demonstration Batter Boards Claw Hammer
Perform Job Sheet No. Trainee evaluates Pencil/marking pen
1.2-1 on Installing output using Pull-push rule
Batter boards Performance Criteria Nylon String
Checklist No. 1.2-1 Plumb Bob
Steel Square
Trainee evaluates Try-square
Perform Operation
Sheet No. 1.2-1a on output using Hand Saw
Layout the Performance Criteria Chalk Line
(Rectangular) Site Checklist No. 1.2-1a Personal Protective
Equipment
Perform Operation Trainee evaluates
Sheet No. 1.2-1b on output using Plan and working
Set and Stake Performance Criteria drawings
Procedure Checklist No. 1.2-1b Lumber
Nails
Perform Operation Trainee evaluates
Sheet No. 1.2-1c on output using