Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LAID IN 4" DIA HDPE DOUBLE WALL PIPE BURIED IN GROUND

LAID IN 4" DIA HDPE DOUBLE WALL PIPE BURIED IN GROUND

LAID IN 4" DIA HDPE DOUBLE WALL PIPE BURIED IN GROUND

LAID IN 4" DIA HDPE DOUBLE WALL PIPE BURIED IN GROUND


1 x 25mm2 4C PVC/SWA/PVC CU. CABLE + EARTH CABLE

1 x 16mm2 4C PVC/SWA/PVC CU. CABLE + EARTH CABLE

1 x 25mm2 4C PVC/SWA/PVC CU. CABLE + EARTH CABLE

1 x 16mm2 4C PVC/SWA/PVC CU. CABLE + EARTH CABLE


SETIA SAFIRO SDN. BHD.

IN 100MM DIA HDPE DOUBLE WALL PIPE LAID U/GRD.


SETIA CORPORATE TOWER,
5A, JALAN SETIA NUSANTARA U13/17,
SETIA ECOPARK, SEKSYEN U 13,
40170 SHAH ALAM
R3 SELANGOR DARUL EHSAN
FROM FEEDER PILLAR TO 1ST POLE :

FROM FEEDER PILLAR TO 1ST POLE :


TEL: 03-3343 2228 FAX: 03-3343 7228
B2 B2 B4 B2 B4 B6 B2 B4 B6 B2 B4 B2

1 x 16mm2/4C PVC/SWA/PVC CU. CABLE


PHOTOCELL OF FEEDER PILLAR

PHOTOCELL OF FEEDER PILLAR


Y2 Y2 Y4 Y6 Y2 Y4 Y6 Y2 Y4 Y6 Y2 Y4 Y2

R2 R2 R4 R6 R2 R4 R6 R2 R4 R6 R2 R4 R2
GARIS ARCHITECTS SDN BHD (220810-T)
CU.CABLE& EARTH WIRE

CU.CABLE& EARTH WIRE


B1 B1 B3 B5 B1 B3 B5 B1 B3 B5 B1
B1 B3 GLOBAL BUSINESS & CONVENTION CENTER
FROM POLE TO POLE :

FROM POLE TO POLE :


Y1 Y3 Y1 Y3 Y5 Y1 Y3 Y5 Y1 Y3 Y5 Y1 Y3 Y5 Y1 BLOCK B, FIRST FLOOR,
2 X 2.5mm2 1C PVC

2 X 2.5mm2 1C PVC
R1 R3 R1 R3 R5 R1 R3 R5 R1 R3 R5 R1 R3 R5 R1 NO. 8, JALAN 19/1, 46300 PETALING JAYA,
SELANGOR DARUL EHSAN
PC PC
Tel. : 603-7956 8999
Fax : 603-7956 9320
BY THIS CONTRACT

R3 Y3

R2 Y2

R1 Y1

1 NO. 13A METALCLAD 1 NO. 13A METALCLAD


SWITCH SOCKET OUTLET SWITCH SOCKET OUTLET
30A N 30A N
30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A
SPN SPN SPN 1 NO. 20W FLUO. LIGHT 1 NO. 20W FLUO. LIGHT
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB FTG. MOUNTED MCB MCB MCB MCB MCB MCB MCB MCB MCB FTG. MOUNTED
UNDERNEATH ROOF OF UNDERNEATH ROOF OF
25mm 2PVC/PVC CU. CABLE 25mm 2PVC/PVC CU. CABLE
FEEDER PILLAR FEEDER PILLAR T1
2.5mm PVC/PVC CU. CABLE

2.5mm PVC/PVC CU. CABLE


C
C1 C2 C3 C1 C2 C3

5A 5A 5A 5A 5A 5A
BY PASS 2A
SPARE

SPARE
SPARE

SPARE
30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A
N N N N N N
SWITCH
2 x 1C-1.5mm 2PVC/PVC CU. CABLE

2 x 1C-1.5mm 2PVC/PVC CU. CABLE


2 x 1C-2.5mm2 PVC/PVC CU. CABLE

2 x 1C-2.5mm2 PVC/PVC CU. CABLE


S S
2

2
30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A 30A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB T/S MCB MCB MCB MCB MCB MCB MCB MCB MCB T/S

KONSULT KVA KONSULT


TIME SWITCH

TIME SWITCH
BY OTHERS
MANUAL

MANUAL
REMOTE

REMOTE
10A 10A 10A 10A 15A 5A 20A 20A 10A 10A 10A 10A 15A 5A 20A 20A
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB

RYB1 RYB2 RYB3 R4 Y4 B4 R5 Y5 B5 R6 Y6 RYB1 RYB2 RYB3 R4 Y4 B4 R5 Y5 B5 R6 Y6

60A TPN
MCB
60A TPN
MCB
BERSATU ELECTRICAL ENGINEERING SDN.
BHD.
60A 60A
TPN TPN
MCCB MCCB
2
4 x 1C-35mm PVC CU. CABLE 4 x 1C-35mm2 PVC CU. CABLE

60A TPN

FROM
60A TPN
TNB METER TNB METER
KWH KWH

60A TPN 60A TPN DB/GH1


CUT-OUT FUSE CUT-OUT FUSE
AND NEUTRAL LINK AND NEUTRAL LINK
TCL : 4.05 KW TCL : 3.51 KW
TMD :3.85 KW TMD : 3.33 KW
SUPPLY, DELIVERY, INSTALLATION, TESTING &
FP/SL/PH1
WEATHER PROOF TYPE C/W CABLE GLAND
FP/SL/PH2
WEATHER PROOF TYPE C/W CABLE GLAND
SCHEMATIC DIAGRAM FOR STREET LIGHTING COMMISSIONING OF LED STREET LIGHTING, TNB &
R.C PLINTH 1 x 4C-70mm2 PVC/SWA/PVC AL. CABLE R.C PLINTH 1 x 4C-70mm2 PVC/SWA/PVC AL. CABLE TELEPHONE INFRASTRUCTURE AND LANDSCAPE SERVICES
TAPPING FROM GUARD HOUSE FOR: 

FROM FROM 1. PHASE 1 INCLUSIVE 2 UNITS TNB SUBSTATION,


TNB FEEDER PILLAR TNB FEEDER PILLAR 1 UNIT GUARDHOUSE & 1 UNIT CLUBHOUSE. 
2. PHASE 2 
3. EXTERNAL ROAD AT PART OF JALAN ASPIRASI 
STREET LIGHTING SCHEMATIC DIAGRAM STREET LIGHTING SCHEMATIC DIAGRAM
ON LOT PT 58749 (BLOCK 17), CYBER 10, CYBERJAYA, MUKIM
(FP/SL/PH1) (FP/SL/PH2) DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN FOR
MESSRS. SETIA SAFIRO SDN. BHD. 

STREET LIGHTING SERVICES


STREET LIGHTING SCHEMATIC DIAGRAM (FP/PH1/SL)
STREET LIGHTING SCHEMATIC DIAGRAM (FP/PH2/SL)
SCHEMATIC DIAGRAM FOR STREET LIGHTING TAPPING
FROM GUARD HOUSE
1:1500
NOV 2021
AMIRUL
AMIRUL
SEBASTIAN
AS BUILT DRAWINGS
BEE/KVA/10101/E/SL/04

You might also like