A-102-Overall Ground Floor Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Dubai Development Authority Stamp:

A
14 15 16 17 18 19 20 21 22

BL

N
W
QI
25300
2730
7775 1325 2000 5600 800 7800
A-204

E
S
BICYCLE (12 NO'S) DONATION BOX
(02 NO'S) 1 7.075 258° 48' 06"
6.369 A-205

1225
+ 1.18 m
COURTYARD FFL
D20 SLOPE 3 SLOPE

R- 4
EXHAUST SHAFT + 0.90 m + 0.96 m

3600
5
D15
SWL SWL

00
200 25220 D33 D18 D19 D18
Q

900
F19 D1
RAMP SLOPE 10% GARBAGE BIN

7200
6.390 8% KITCHEN CIRCULATION RESIDENCE ENTRANCE ISO A1 - 841 x 594 mm
PE D16
NOTES:

2600
P SLO CLEANER ROOM TEL.RM

2000
RAM LIFT 05 R

4000
BASEMENT LINE + 1.20 m
GENTS D16 D16 STAIR 04 GARBAGE ROOM

FR
W11 STORE D34 1- THIS DRAWING IS THE COPYRIGHT OF ARCHCORP AND MUST
+ 1.20 m FFL

RA BA

3600
OM
ELEC. RM.

R- 117
S

MP SEM
ENTRANCE D32 FFL
W.M.RM + 1.200 m
NOT BE RETAINED OR REPRODUCED WITHOUT CONSULTANT'S
8 14980

U P EN
+ 1.200 m

1400
BATH 3000 PERMISSION.
SSL GARBAGE BIN

00
A-111 6100 4245 200 4435 FFL 2- ALL DRAWINGS TO BE READ IN CONJUNCTION WITH THE
ENTRY / EXIT W4
1 T

T
18 7.125 SPECIFICATIONS, THE BILL OF QUANTITIES AND OTHER

250
RA B A

1100 1100 1100 1100 1100


VEHICULAR 00 A-302

TO
2 D32 D32 D32

M SE
UP A-205 RELEVANT DRAWINGS.

P ME

5000
STAIR 05

DO N
IMAM W5 96 3- ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS,

W T
5

2530
(6.26 DMD)

0
A-111 HAND WASH

2800
N

65
5200 ENTRANCE UP 1 D32 D32 D32 UNLESS NOTED OTHERWISE.
23 W20
24 + 1.35 m
A-306 W12
4 A-205 4- DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS
FIRE EXIT STAIR FFL
A-202 1700 D32 1600 D32 1700 1600 D32 1700 SHOULD BE FOLLOWED AND VERIFIED WITH THE DETAILS.
4 R- UP
450 SWL

50
0 5- ANY DISCREPANCIES FOUND IN DRAWINGS ARE TO BE
6.348 + 2.20 m

40
W11
3500 1 D10 REPORTED TO THE ENGINEER.
10 D32 D32 D32

9000
LOCKABLE INSULATED ALUMINIUM PANEL

5
10

18275
FOR EXTERNAL AV CONNECTION.

72
1900

D28 13 UP WATER 6- CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO THE

0
+ 1.35 m + 1.35 m D13

60
W18 W4 JAN.
5500 FFL FFL
D2 COOLER CONSULTANT BEFORE COMMENCING ANY WORK ON SITE.
D32 D32 D32
GENERATOR RM 00
X 45 D5
R- 13 W12
90 ABLUTION
1 FRESH AIR 0 W11
1750

1750

+ 1.20 m + 1.20 m
TOILET
A-301

N
D10 FFL D10

25
+ 1.20 m FFL

7700
37
D9
DECK 3155 FFL
SUBSTATION
V
7000

3050
6550

3050

96 W11

W
D23 5

13000

E
QIBLA
W14 STAIR 03
05 CAR PARKING + 1.10 m 7.177

2650
+ 0.350 m LIFT 03 LIFT 04

"
0
SWL

06
60
SSL DN
5000

8'
BASEMENT LINE W11
11350

20
MINBAR

4
1750

1750

48

S
5000 W5
W


1000 1300

25
+ 1.95 m UP UP

0
3 FRESH AIR

60
A-111

2325
FFL
Y

50
1150

31
5000

0
23

15
00 UP 1 W1

11
900 11800 0
22 UP
LV RM. 00 A-305
4100

1800
4350

6.327 D21
09
MOVEMENT JOINT TO PAVING AREA

00
48
+ 0.350 m + 1.35 m GENTS ALONG PERIMETER OF BASEMENT
220 1150

SSL
90
FFL + 1.35 m ENTRANCE 2
R-

5 FFL UP
Z A-306
60
0

45
50
60

66
0

31

R- 480
7.189

00
2600

01 6000 LO

R- 45
25
25 W7 EN OSE

0
GENTS MAIN PRAYER HALL + 1.35 m TR FI R=464.12m

0
AN T H
25

20
FFL C E EA
33

34
6 CA VY

50
ELECTRICAL ROOM 50
RP DU

14
0 0
+ 1.35 m ET TY R- 165

R-
D5
.

0
65
+ 0.11 m
2600

FFL W7

0
FRESH AIR

20
A-111 ROAD LEV. + 1.20 m D25 UP KEY PLAN

44
FFL D11
GENTS ELEVATOR
1200
BASEMENT LINE UP
82 FRESH AIR
2600

25
10 EXTERNAL ABLUTION GATE LEVEL ± 0.00 = (6.26 DMD)
10
CARPET AREA = 804.500 Sq.M (8659.565 Sq.ft) 10
75 29
D26
CAR PARKING
( WORSHIPPERS = 1073 ) 50
LIFT 02 BASEMENT FLOOR = 70 NO's
26 GROUND FLOOR = 13 NO's
2600

08 CAR PARKING D11 00

00
12690 TOTAL PARKING = 83 NO'S

65
6.391

00
STAIR 02 BASEMENT LINE

26
GENTS LOBBY
65
22420

75
305 5500 6600 670 + 1.05 m
2600

+ 1.35 m
UP SWL

50
FFL

00

46
00
7.224

14

%
36

E8
OP
W9

0
D11 D24
INTERIM PRAYER HALL

00

SL
0
2600

30
60

MP

0
Area :311.67 m²

45
D12

RA
20
W5

16
FRESH AIR + 1.35 m

00
27
FFL
5
72
2600

96
5
CARPET AREA = 243.390 Sq.M (2619.828 Sq.ft) D12 62 A

50
00
( WORSHIPPERS = 324 )

29
28
50

D11
510

CH
00
40

5500

N
68
0

BE
65

5
2600

E
ON
13

ST
90
4220

08 60
0 B

00
51 0 GENTS ENTRANCE LOBBY

40
50
UP 7.204
C
1620

+ 0.19 m W4 + 1.35 m D12 0 07/07/2022 MARS Issued for Construction


0
60

6.451 D13 FFL 50 + 1.35 m


ROAD LEV. 0 No. Date Issued by Revisions
0

FFL
60

20
R- 75

75
PURPOSE OF ISSUE
60 00 + 1.35 m

29
00
R-
60 FFL D
ISSUED FOR CONSTRUCTION

50

ET TY
96 D12

14
5

RP DU

25
GENTS

.
UP

15
CA VY
+ 1.35 m GENTS

C E EA
ENTRANCE UP UP
E

CH
AN T H
FFL ENTRANCE

N
DESIGN CONSULTANTS:
0

TR FI
10 W5 10

BE
65

15 FRESH AIR

EN OSE
75
archcorp

E
0 W4

ON
50

W5

LO
UP
31

ST
architectural engineering
UP
7.126 dubai : p.o. box : 95285. dubai, uae. t : +971 4 2955877 f : +971 4 2955811
+ 1.35 m STAIR 01 sharjah : p.o. box : 65100. sharjah, uae. t : +971 6 5289142, f : +971 6 5289156

00
abu dhabi : p.o. box : 114840. abu dhabi, uae. t : +971 2 6775254, f : +971 2 6775276

75
1 FFL F

0
RA e : Info@archcorp.biz www.archcorp.biz
00

00
20 MP W5
14800

LADIES ENTRANCE

46
R- SL
OP 39 OWNER:
20 72 E8 50 LIFT 01 BASEMENT LINE
R- 6700 75 A-203 00 + 1.35 m
%
FFL
D14
G ISLAMIC AFFAIRS & CHARITABLE
22
DN 00 ACTIVITIES DEPARTMENT

25
6.524 51 W10

14
47 00
00
0
+ 1.35 m H
F19 FFL
1 LO
EN OSE
50

01 CLIENT:

75
7.111
E8

A-305
18

TR FI

30
AN T H
OP

C E EA 1
SL

CA VY
00
MP

RP DU
ENGINEERING OFFICE
54

ET TY
RA

02 52
50 .
D5 A-704
UP
UP UP
05

00
LADIES

40
+ 0.90 m
1195

ENTRANCE PROJECT TITLE:


06 37
SWL
03 1 75
7.001 I R-000121000 - DESIGN AND CONSTRUCTION OF
A-302
HH SHEIKH RASHID BIN MOHAMMED MOSQUE
50

J
29

04 IN DUBAI HARBOUR AT PLOT 3920665


07
R=306.30m

38
50
DRAWING TITLE:
00
27

92 K
5
08 20 OVERALL GROUND FLOOR PLAN
0
45

25

38
50

25
46

09 L Area Location Parcel ID.

1 OVERALL GROUND FLOOR PLAN DUBAI DUBAI HARBOUR 3920665


Designed Drawn Checked Approved
A-102 SCALE 1 : 150 10
M SH MARS SH SH
11 Status
Project No. Date Scale @ A1
ISSUED FOR
12 N 2739 09/02/2022 As indicated
CONSTRUCTION

P O Drawing No. Rev


13 2739 - A-102 0

You might also like